Photograph captioned by Fairfax, "Building damage after Christchurch earthquake".
Revealed after the SoulFood Cafe building was demolished
Revealed after the SoulFood Cafe building was demolished
Scavenger Hunt 101 - SH 8 (abandoned building or ruin) The ruins/remains of what was the third highest building in Christchurch, pre earthquakes, the Price Waterhouse Coopers building in Armagh Street. At 76.3 metres ( 21 floors) the demolition has left the basement (now flooded) and these supports. Just one of many photos from Christchurch ...
In this thesis, focus is given to develop methodologies for rapidly estimating specific components of loss and downtime functions. The thesis proposes methodologies for deriving loss functions by (i) considering individual component performance; (ii) grouping them as per their performance characteristics; and (iii) applying them to similar building usage categories. The degree of variation in building stock and understanding their characteristics are important factors to be considered in the loss estimation methodology and the field surveys carried out to collect data add value to the study. To facilitate developing ‘downtime’ functions, this study investigates two key components of downtime: (i) time delay from post-event damage assessment of properties; and (ii) time delay in settling the insurance claims lodged. In these two areas, this research enables understanding of critical factors that influence certain aspects of downtime and suggests approaches to quantify those factors. By scrutinising the residential damage insurance claims data provided by the Earthquake Commission (EQC) for the 2010- 2011 Canterbury Earthquake Sequence (CES), this work provides insights into various processes of claims settlement, the time taken to complete them and the EQC loss contributions to building stock in Christchurch city and Canterbury region. The study has shown diligence in investigating the EQC insurance claim data obtained from the CES to get new insights and build confidence in the models developed and the results generated. The first stage of this research develops contribution functions (probabilistic relationships between the expected losses for a wide range of building components and the building’s maximum response) for common types of claddings used in New Zealand buildings combining the probabilistic density functions (developed using the quantity of claddings measured from Christchurch buildings), fragility functions (obtained from the published literature) and cost functions (developed based on inputs from builders) through Monte Carlo simulations. From the developed contribution functions, glazing, masonry veneer, monolithic and precast concrete cladding systems are found to incur 50% loss at inter-storey drift levels equal to 0.027, 0.003, 0.005 and 0.011, respectively. Further, the maximum expected cladding loss for glazing, masonry veneer, monolithic, precast concrete cladding systems are found to be 368.2, 331.9, 365.0, and 136.2 NZD per square meter of floor area, respectively. In the second stage of this research, a detailed cost breakdown of typical buildings designed and built for different purposes is conducted. The contributions of structural and non- structural components to the total building cost are compared for buildings of different usages, and based on the similar ratios of non-structural performance group costs to the structural performance group cost, four-building groups are identified; (i) Structural components dominant group: outdoor sports, stadiums, parkings and long-span warehouses, (ii) non- structural drift-sensitive components dominant group: houses, single-storey suburban buildings (all usages), theatres/halls, workshops and clubhouses, (iii) non-structural acceleration- sensitive components dominant group: hospitals, research labs, museums and retail/cold stores, and (iv) apartments, hotels, offices, industrials, indoor sports, classrooms, devotionals and aquariums. By statistically analysing the cost breakdowns, performance group weighting factors are proposed for structural, and acceleration-sensitive and drift-sensitive non-structural components for all four building groups. Thus proposed building usage groupings and corresponding weighting factors facilitate rapid seismic loss estimation of any type of building given the EDPs at storey levels are known. A model for the quantification of post-earthquake inspection duration is developed in the third stage of this research. Herein, phase durations for the three assessment phases (one rapid impact and two rapid building) are computed using the number of buildings needing inspections, the number of engineers involved in inspections and a phase duration coefficient (which considers the median building inspection time, efficiency of engineer and the number of engineers involved in each assessment teams). The proposed model can be used: (i) by national/regional authorities to decide the length of the emergency period following a major earthquake, and estimate the number of engineers required to conduct a post-earthquake inspection within the desired emergency period, and (ii) to quantify the delay due to inspection for the downtime modelling framework. The final stage of this research investigates the repair costs and insurance claim settlement time for damaged residential buildings in the 2010-2011 Canterbury earthquake sequence. Based on the EQC claim settlement process, claims are categorized into three groups; (i) Small Claims: claims less than NZD15,000 which were settled through cash payment, (ii) Medium Claims: claims less than NZD100,000 which were managed through Canterbury Home Repair Programme (CHRP), and (iii) Large Claims: claims above NZD100,000 which were managed by an insurance provider. The regional loss ratio (RLR) for greater Christchurch for three events inducing shakings of approximate seismic intensities 6, 7, and 8 are found to be 0.013, 0.066, and 0.171, respectively. Furthermore, the claim duration (time between an event and the claim lodgement date), assessment duration (time between the claim lodgement day and the most recent assessment day), and repair duration (time between the most recent assessment day and the repair completion day) for the insured residential buildings in the region affected by the Canterbury earthquake sequence is found to be in the range of 0.5-4 weeks, 1.5- 5 months, and 1-3 years, respectively. The results of this phase will provide useful information to earthquake engineering researchers working on seismic risk/loss and insurance modelling.
<b>Construction and Demolition (C&D) waste contributes to over 50% of New Zealand’s overall waste. Materials such as timber, plasterboard, and concrete make up 81% of the C&D waste that goes into landfills each year. Alongside this, more than 235 heritage-listed buildings have been demolished in Christchurch since the 2011 earthquakes. This research portfolio aims to find a solution to decrease C&D waste produced by demolishing heritage buildings.</b> With the recent announcement of The Cathedral of the Blessed Sacrament’s demolition, this will be another building added to the list of lost heritage in Christchurch. This research portfolio aims to bridge the relationship between heritage and waste through the recycling and reuse of the demolished materials, exploring the idea that history and heritage are preserved through building material reuse. This research portfolio mainly focuses on reducing construction and demolition waste in New Zealand, using the design of a new Catholic Cathedral as a vessel. This thesis will challenge how the construction and design industry deals with the demolition of heritage buildings and their contribution to New Zealand’s waste. It aims to explore the idea of building material reuse not only to reduce waste but also to retain the history and heritage of the demolished building within the materials.
Seismic retrofitting of unreinforced masonry buildings using posttensioning has been the topic of many recent experimental research projects. However, the performance of such retrofit designs in actual design level earthquakes has previously been poorly documented. In 1984 two stone masonry buildings within The Arts Centre of Christchurch received posttensioned seismic retrofits, which were subsequently subjected to design level seismic loads during the 2010/2011 Canterbury earthquake sequence. These 26 year old retrofits were part of a global scheme to strengthen and secure the historic building complex and were subject to considerable budgetary constraints. Given the limited resources available at the time of construction and the current degraded state of the steel posttension tendons, the posttensioned retrofits performed well in preventing major damage to the overall structure of the two buildings in the Canterbury earthquakes. When compared to other similar unretrofitted structures within The Arts Centre, it is demonstrated that the posttensioning significantly improved the in-plane and out-of-plane wall strength and the ability to limit residual wall displacements. The history of The Arts Centre buildings and the details of the Canterbury earthquakes is discussed, followed by examination of the performance of the posttension retrofits and the suitability of this technique for future retrofitting of other historic unreinforced masonry buildings. http://www.aees.org.au/downloads/conference-papers/
As part of the ‘Project Masonry’ Recovery Project funded by the New Zealand Natural Hazards Research Platform, commencing in March 2011, an international team of researchers was deployed to document and interpret the observed earthquake damage to masonry buildings and to churches as a result of the 22nd February 2011 Christchurch earthquake. The study focused on investigating commonly encountered failure patterns and collapse mechanisms. A brief summary of activities undertaken is presented, detailing the observations that were made on the performance of and the deficiencies that contributed to the damage to approximately 650 inspected unreinforced clay brick masonry (URM) buildings, to 90 unreinforced stone masonry buildings, to 342 reinforced concrete masonry (RCM) buildings, to 112 churches in the Canterbury region, and to just under 1100 residential dwellings having external masonry veneer cladding. Also, details are provided of retrofit techniques that were implemented within relevant Christchurch URM buildings prior to the 22nd February earthquake. In addition to presenting a summary of Project Masonry, the broader research activity at the University of Auckland pertaining to the seismic assessment and improvement of unreinforced masonry buildings is outlined. The purpose of this outline is to provide an overview and bibliography of published literature and to communicate on-going research activity that has not yet been reported in a complete form. http://sesoc.org.nz/conference/programme.pdf
A photograph of the back page of a Christchurch City Council form. The form allowed contractors to apply for the authorisation to enter the Christchurch Red Zone after the 22 February 2011 earthquake. Information on the back reads, "What does this authorisation mean for me? I am wearing appropriate personal protection clothing and equipment. At all times DO NOT enter any red placarded building. You may enter a yellow placarded building for a period of time (no longer than 30 minutes) and follow the instruction of the escorts. A green placarded building may be accessed for longer periods. Please note: do not enter any buildings which are not for the purpose of your authorisation".
Part of Mike Hewson's installation 'Homage To Lost Spaces' in the Cramner Courts building, a photograph of a young man working at a desk has been inserted into a gap in the building. The photographer comments, "Cranmer Courts in Christchurch, New Zealand was very badly damaged in the earthquakes that have rocked the City for the past two years. Mike Hewson thought he would try to bring life back into the buildings by putting photographs into the spaces where the doors and windows were. There was a month or so when no one seemed to know or admit who had put the pictures up, but it was done officially. It seems that though very badly damaged the buildings may get restored".
One landscape colour digital photograph taken on 16 June 2011 showing the Lyttelton Bakery operating from a portable building on the Corner of Canterbury Street and Norwich Quay. This portable building has been placed on the site of the Royal Hotel. Also visible in the photograph are Shadbolt House and the rear of the buildings on the south side...
External stairs on the Forsyth Barr building in Christchurch. Portions of the internal stairwell collapsed during the earthquake of February 22nd 2011, necessitating use of various means of getting people out of the building. Was the fourth highest building in the city pre earthquakes, but it's future is uncertain. Was for sale "as is, where ...
The sign reads: The CTV Building was headquarters of Canterbury Television (CTV) and also housed King’s Education language School, a medical clinic, Hair Consultants, Relationship Services and a nursing school. On February 22nd 2011 the building collapsed as a result of a major earthquake. Sadly, 115 people who were in the building lost their l...
A photograph of buildings on Armagh Street, taken from the corner of Oxford Terrace. From the front, there is the Craig's Investment Partners House, the Victoria Apartments, and the Forsyth Barr building in the distance.
A photograph of the Civil Suite at the University of Canterbury after the 4 September 2010 earthquake. The photograph was taken on the day when the staff were allowed to return to the building.
A photograph of the earthquake damage to the Bob Brown's Hi-Fi Sounds building on the corner of Gloucester and Armagh Streets. Many of the windows have broken and wire fencing has been placed around the building as a cordon.
A photograph of the earthquake damage to the Bob Brown's Hi-Fi Sounds building on the corner of Gloucester and Armagh Streets. Many of the windows have broken and wire fencing has been placed around the building as a cordon.
A digital copy of a painting by Julia Holden. The painting is of an excavator and a large mound of building rubble. In the background is the badly-damaged Farmers car park building on Gloucester Street.
A demolished house on Oxford Street in Lyttelton. The wood from the house still lies in a pile on the building site. Wire fencing has been used to create a cordon around the building.
A photograph captioned by BeckerFraserPhotos, "Brightly coloured safe doors on the side of a building on Hereford Street. The safes have exposed as a result of the demolition of a building".
A photograph of members of the public walking along the edge of the cordon on the intersection of Colombo and Gloucester Streets. In the background, the Forsyth Barr Building can be seen as well as the partially-demolished PricewaterhouseCoopers Building.
A photograph of a badly-damaged building on the corner of Manchester Street and Gloucester Street. The wall of the top storey has crumbled, and the bricks have fallen onto the footpath below. Wire fencing has been placed around the building as a cordon.
A photograph of a badly-damaged building on the corner of Manchester Street and Gloucester Street. The wall of the top storey has crumbled, and the bricks have fallen onto the footpath below. Wire fencing has been placed around the building as a cordon.
Photograph captioned by BeckerFraserPhotos, "Hereford Street - the remains of St Johns Church (left), Arrow International empty site. CTV site and the IRD building (right)".
The PricewaterhouseCoopers building photographed from Cambridge Terrace, across the Avon River. A skip can be seen on the road as well as wire fencing and a road cone. Some of the windows above are broken and have been boarded up with wood.
Photograph captioned by BeckerFraserPhotos, "A pile of building rubble from the BNZ bank with the All Seasons Hotel (left) and Holiday Inn (right) in Cashel Street. Photo taken in Hereford Street".
Photograph captioned by BeckerFraserPhotos, "A view across Cathedral Square looking north-east from the roof of the Ibis Hotel in Hereford Street".
Photograph captioned by BeckerFraserPhotos, "A view looking west along Worcester Boulevard from Cathedral Square. On the left is the Clarendon Tower, the Rydges Hotel to the right, and the Grant Thornton building".
Photograph captioned by BeckerFraserPhotos, "High Street with the remains of the Hotel Grand Chancellor and the Holiday Inn and Westpac building (both under demolition)".
Photograph captioned by BeckerFraserPhotos, "High Street with the remains of the Hotel Grand Chancellor and the Holiday Inn and Westpac building (both under demolition). Manchester Street on the left".