Search

found 383 results

Images, UC QuakeStudies

The damaged Cranmer Courts on the corner of Kilmore and Montreal Streets. The corner of the building has crumbled onto the street, which is now littered with broken masonry. Wire fencing placed around the building after the 4 September 2010 earthquake has managed to keep the debris away from the road.

Images, UC QuakeStudies

A photograph of road works on a residential street in Christchurch. Two workers in high-visibility vests can be seen, one setting up road cones. A digger is sitting on a pile of dug up gravel and earth. Cordon fences have been placed around the site. In the distance, a dump truck can be seen.

Images, UC QuakeStudies

The north-west end of the Arts Centre on the corner of Rolleston Avenue and Worcester Boulevard. The tip of the gable is missing as well as the spire which has been removed and braced on the footpath to limit damage. Wire fencing and road cones have been placed around the building as a cordon. In the distance, a crane is working on the building.

Images, UC QuakeStudies

Army presence outside the city cordon on Tuam Street. Road cones and cordon fencing have been placed around damaged buildings. In the background is a building where the walls have crumbled, exposing the interior of the building.

Images, UC QuakeStudies

A photograph of the Wellington Emergency Management Office Emergency Response Team walking down Lichfield Street. Plastic fencing and road cones have been placed along both sides of the road as cordons. Behind the fences are piles of bricks and other rubble from the buildings above.

Images, UC QuakeStudies

A photograph of the Wellington Emergency Management Office Emergency Response Team walking down Lichfield Street. Plastic fencing and road cones have been placed along both sides of the road as cordons. Behind the fences are piles of bricks and other rubble from the buildings above.

Images, UC QuakeStudies

A photograph of the Wellington Emergency Management Office Emergency Response Team walking down Lichfield Street. Plastic fencing and road cones have been placed along both sides of the road as cordons. Behind the fences are piles of bricks and other rubble from the buildings above.

Images, UC QuakeStudies

A photograph looking south down Montreal Street from the Bealey Avenue. The road has been cordoned off with road cones and a member of the New Zealand Army in a high-visibility vest can be seen guarding it. In the background, a New Zealand Army vehicle can be seen with more soldiers. Some are on bikes to the right.

Images, UC QuakeStudies

Damage to Fitzgerald Avenue. The northbound lanes have collapsed towards the river, and a pile of rubble from the damaged road is heaped on the road. Road cones divert traffic onto the southbound lanes. The photographer comments, "Fitzgerald Avenue between Kilmore Street and Bealey Ave is a mess. Half of the road has slumped towards the river by a good metre or two. My brother-in-law was here when the 22nd earthquake hit and he said the damage wasn't as bad as this at first. A local resident told me that the road is slumping more and more each day".

Images, UC QuakeStudies

Damage to Fitzgerald Avenue. The northbound lanes have collapsed towards the river, and a pile of rubble from the damaged road is heaped on the road. Road cones divert traffic onto the southbound lanes. The photographer comments, "Fitzgerald Avenue between Kilmore Street and Bealey Ave is a mess. Half of the road has slumped towards the river by a good metre or two. My brother-in-law was here when the 22nd earthquake hit and he said the damage wasn't as bad as this at first. A local resident told me that the road is slumping more and more each day".

Images, UC QuakeStudies

Damage to Fitzgerald Avenue. The northbound lanes have collapsed towards the river, and a pile of rubble from the damaged road is heaped on the road. Road cones divert traffic onto the southbound lanes. The photographer comments, "Fitzgerald Avenue between Kilmore Street and Bealey Ave is a mess. Half of the road has slumped towards the river by a good metre or two. My brother-in-law was here when the 22nd earthquake hit and he said the damage wasn't as bad as this at first. A local resident told me that the road is slumping more and more each day".

Images, UC QuakeStudies

A photograph of a piece of plywood sitting on top of a pile of bricks from the Carlton Hotel. USAR codes have been spray-painted on the wood. In the foreground, metal fencing, cordon tape and a road cone have been used to cordon off the building.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Carlton Hotel on the corner of Papanui Road and Bealey Avenue. The wall of the top storey of the building has crumbled, and bricks have fallen onto the footpath. Wire fencing, road cones, and cordon tape have been placed around the building as a cordon. Scaffolding and steel bracing can be seen against the front of the building.