Search

found 452 results

Images, UC QuakeStudies

A digitally manipulated image of liquefaction around a house in Avondale. The photographer comments, "The bottom of the gates were swallowed up by liquefaction, but the house still looked in good condition, which was confirmed by builders just going in to work on the property. It is in the Christchurch red zone, which after testing has been deemed unsuitable for houses to be built on. All the land will be bought by the Government and they would also buy any properties that could be repaired. The remaining insured property owners will get a payment from the insurance company. All the buildings are condemned to be knocked down".

Images, UC QuakeStudies

A photograph of a room in the Diabetes Centre which has been prepared for repairs. The moveable stacks and counter have been covered in plastic sheeting and a tarpaulin has been draped over the carpet.

Images, UC QuakeStudies

A photograph of St John's Anglican Church in Hororata. The spire of the church, which partially collapsed in the 4 September earthquake, has been boarded up in order to protect the building from rain. This photograph was modelled off an image taken by BeckerFraserPhotos in October 2010.

Audio, Radio New Zealand

It's seven years today since Christchurch was rocked by the magnitude 6.3 earthquake. It killed 185 people, injured thousands more and led to whole suburbs and most of the central city being demolished. Seven years on, the rebuild is still underway and some residents are still struggling to get the repairs they want.

Images, UC QuakeStudies

A fire engine driving past the damaged Provincial Council Legislative Chamber on Durham Street. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September earthquake.

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. My desk".

Images, UC QuakeStudies

A photograph of an office in the Diabetes Centre which has been prepared for earthquake repair work. Furniture and other office materials have been stacked in the corner of the room. Several tiles are missing from the ceiling above.

Videos, UC QuakeStudies

A video of excavators demolishing the former railway station on Moorhouse Avenue. The building was only moderately damaged during the 22 February 2011 earthquake, but repair work was deemed too costly for the co-owner, Science Alive!.

Audio, Radio New Zealand

Many Christchurch trades people are refusing to carry out quake repairs unless the homeowner agrees to pay the bill, saying it takes too long to get the money out of the Earthquake Commission. Some contractors say they still haven't been paid for jobs done after the quake in September and the amount of debt some businesses are carrying are putting them in jeopardy.

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February 2011 earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February 2011 earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

The Lyttelton Coffee Company building on London Street in Lyttelton is weatherproofed with black tarpaulins. The spray-painted signs guide customers to Samo Coffee Lounge, a cafe run by the staff of Lyttelton Coffee Company while the building is being repaired.

Images, eqnz.chch.2010

Repairs in progress on this High Street shop; aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.

Images, UC QuakeStudies

A photograph of the stairwell of the Diabetes Centre on Hagley Avenue. There is a workbench in the foreground and a plank of wood on the right side of the stairs. On the landing the wall has been repaired and is unpainted.

Articles, UC QuakeStudies

An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.

Images, UC QuakeStudies

An aerial photograph of the PricewaterhouseCoopers building. The photograph is captioned by BeckerFraserPhotos, "PricewaterhouseCoopers building at 119 Armagh Street. Its status is uneconomic to repair, so it will be demolished. Copthorne Central is visible behind it and will be staying".

Images, UC QuakeStudies

Jess Hollis, a member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. My desk with Jess behind".