Search

found 600 results

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled Synthesis. The installation is on the corner of High Street and Lichfield Street. The installation was created by students from CPIT for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Audio, Radio New Zealand

Two tragedies have brought two groups of young people from opposite sides of the world together for a special tree planting in Christchurch. Twenty-eight students from Marjory Stoneman Douglas High School in Florida -- the scene of a deadly shooting in February -- are spending the week with the Student Volunteer Army, established after the Christchurch earthquake. Jonathan Mitchell reports.

Images, UC QuakeStudies

An interior view of the Cranmer Court building's octagonal corner section, which housed Plato Creative from March 2008 to November 2009. Although designed to house a book depot, the room was used as the principal's office while Christchurch Normal School was operating from the building. The photograph showcases its high windows and intricate wooden ceiling.

Videos, UC QuakeStudies

A video of an interview with Arts Centre CEO Andre Lovatt about the restoration of the Arts Centre after the 22 February 2011 earthquake. The video also includes a tour of the Arts Centre, including the Boys' High School swimming pool and gymnasium which was exposed after another building was demolished.

Videos, UC QuakeStudies

A video clip showing close-up footage of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Audio, Radio New Zealand

A complaint against an engineer whose firm designed the CTV building that collapsed in the Christchurch earthquake will be heard by a disciplinary committee on Monday. One-hundred-and-fifteen people were killed when the six-storey building came down in February 2011. Dr Alan Reay lost a High Court bid to stop the hearing. Reporter Anna Sargent spoke to Corin Dann.

Research papers, University of Canterbury Library

This study sought to investigate employee burnout within a post-disaster context by exploring teachers’ burnout perceptions and workplace attitudes in the aftermath of the 2010-2011 Christchurch earthquakes. The study hypothesised that burnout dimensions (emotional exhaustion and cynicism) would be related with the extent to which individuals and schools were impacted by the earthquakes, and with the quality of school support for staff and students (i.e., personal disaster impact, school disaster impact and school responsiveness to the disaster), with perceptions of role conflict and role overload, and with turnover intentions. Additionally, a Teacher Burnout Model was proposed whereby emotional exhaustion and cynicism were hypothesised to mediate the relationships between the independent variables (i.e., the disaster-related and role-related variables) and turnover intentions. 125 primary, intermediate and secondary school teachers from the city of Christchurch completed an online survey. Results revealed that high role overload, high role conflict, high school disaster impact, and schools’ ineffective disaster coping responses, were associated with increased levels of emotional exhaustion and cynicism. Although greater impact of earthquakes on teachers’ personal lives was related to higher levels of emotional exhaustion, results revealed a non-significant relationship between personal disaster impact and cynicism. In the Teacher Burnout Model, the relationships between both role stress variables and turnover intentions were mediated by perceptions of emotional exhaustion. This study contributes novel findings to the burnout literature, and provides implications for schools and organisations operating within a disaster context.

Videos, UC QuakeStudies

A video clip of several large-scale, temporary installations being erected on the corner of High and Lichfield Streets, and the corner of Lichfield and Manchester Streets. The installations are being created by students from Unitec, The University of Auckland and CPIT, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Images, UC QuakeStudies

The damaged Snell Place footbridge. A crack is visible at the apex of the span. The photographer comments, "Before the Christchurch earthquakes this bridge used to be just just 9 feet at high tide above the River Avon. Now with the ends pushed together it has probably moved up another 9 feet".

Research papers, University of Canterbury Library

To reduce seismic vulnerability and the economic impact of seismic structural damage, it is important to protect structures using supplemental energy dissipation devices. Several types of supplemental damping systems can limit loads transferred to structures and absorb significant response energy without sacrificial structural damage. Lead extrusion dampers are one type of supplemental energy dissipation devices. A smaller volumetric size with high force capacities, called high force to volume (HF2V) devices, have been employed in a large series of scaled and full-scaled experiments, as well as in three new structures in Christchurch and San Francisco. HF2V devices have previously been designed using very simple models with limited precision. They are then manufactured, and tested to ensure force capacities match design goals, potentially necessitating reassembly or redesign if there is large error. In particular, devices with a force capacity well above or below a design range can require more testing and redesign, leading to increased economic and time cost. Thus, there is a major need for a modelling methodology to accurately estimate the range of possible device force capacity values in the design phase – upper and lower bounds. Upper and lower bound force capacity estimates are developed from equations in the metal extrusion literature. These equations consider both friction and extrusion forces between the lead and the bulged shaft in HF2V devices. The equations for the lower and upper bounds are strictly functions of device design parameters ensuring easy use in the design phase. Two different sets of estimates are created, leading to estimates for the lower and upper bounds denoted FLB,1, FUB,1, FUB,2, respectively. The models are validated by comparing the bounds with experimental force capacity data from 15 experimental HF2V device tests. All lower bound estimates are below or almost equal to the experimental device forces, and all upper bound estimates are above. Per the derivation, the (FLB,1, FUB,1) pair provide narrower bounds. The (FLB,1, FUB,1) pair also had a mean lower bound gap of -34%, meaning the lower bound was 74% of device force on average, while the mean upper bound gap for FUB,1 was +23%. These are relatively tight bounds, within ~±2 SE of device manufacture, and can be used as a guide to ensure device forces are in range for the actual design use when manufactured. Therefore, they provide a useful design tool.

Videos, UC QuakeStudies

A video of a tour through the Christchurch central city Red Zone. The video includes footage of the Hotel Grand Chancellor, Victoria Square, the Forsyth Barr building, Colombo Street, Gloucester Street, Cathedral Square, the BNZ building, Cashel Mall, and the Kathmandu store on High Street.

Images, eqnz.chch.2010

This is the Summit Road below Mt Cavendish and shows a few remaining high buildings in the central city beyond (in setting sun). Just above centre is the doomed AMI Stadium (1) aka Lancaster Park, home to Canterbury cricket and rugby till the erathquakes.

Audio, Radio New Zealand

Building plans signed off by the Christchurch City Council show one of its own structural engineers was involved in the design of a new multistorey building that is unstable. The eight-storey office building at 230 High Street is off-limits as it is too weak and might 'rupture' in an earthquake. But the council insists the planning documents are wrong and its engineer had only a minor role. Phil Pennington reports.

Audio, Radio New Zealand

Peter Townsend is the Chief Executive of the Canterbury Employers' Chamber of Commerce. He is part of the official reconstruction group. Geert van de Vorsten Bosch is the emergency Centre Supervisor at Linwood High School which has been turned into an evacuation centre. Dr Ramon Pink is the Canterbury medical officer of health. Metservice duty forecaster Heath Gullery speaks about the possible weather issues Canterbury may soon experience.

Audio, Radio New Zealand

The only Christchurch street still closed following the 2011 earthquake will reopen later in 2018 only to close again in 2019 so the council can extend the route for the tram. The proposal has raised the ire of fledgling businesses along High st worried about the disruption the road works will cause them and wanting the work done now, before they open their doors to the public.

Audio, Radio New Zealand

The government is crowdsourcing the cyclone recovery bill. It has launched an international fundraising effort, modelled on the Christchurch Earthquake Appeal - which raised almost $100 million. A separate special Lotto draw will also be held on March 18 with all proceeds going to affected communities. Prime Minister Chris Hipkins has urged New Zealanders to get behind the effort. He defended asking people to chip in when the cost-of-living is so high.

Images, UC QuakeStudies

A poster advertising performers Maryrose Crook, Purple Pilgrims and Thje. The photographer comments, "Maryrose Crook, Purple Pilgrims, Thje. Saturday 26 Feb (2011). HSP 9PM $5. HSP stands for High Street Project. Here is the introduction for her concert 'Maryrose Crook's spectral voice and calenture tunes float through New Zealand giants, The Renderers' psychic country-punk and splatter rock, and emerge in her solo encounters with horripilated grace and filigree menace. Purple pilgrims' wraithish hymns evolve through a braided field of curled nautical drone and distant littoral roar, abstract thrums and change-rung celestial rustle'. She was supposed to perform on 26 February, but I am guessing the concert was cancelled due to the major earthquake in Christchurch on the 22nd. The horrendous quake made the venue at 84 Lichfield Street out of limits due to it being in the dangerous earthquake red zone. It looks like she next performed on the 17 May at the Loons in Lyttelton".

Images, eqnz.chch.2010

Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, 2011. Much of the inner city CBD is still cordoned off and will be for some time. About 900 buildings are set for demolition. Taken aboard the Southern DC3 www.so...

Research papers, University of Canterbury Library

This paper presents insights from recent advanced laboratory testing of undisturbed and reconstituted specimens of Christchurch silty-sands. The purpose of the testing was to establish the cyclic strength of silty-sands from sites in the Central Business District (CBD), where liquefaction was observed in 4 September 2010, 22 February 2011, and 13 June 2011. Similar overall strengths were obtained from undisturbed and reconstituted tests prepared at similar densities, albeit with higher variability for the reconstituted specimens. Reconstituted specimens exhibited distinctly different response in terms of lower compressibility during initial loading cycles, and exhibited a more brittle response when large strains were mobilised, particularly for samples with high fines content. Given the lower variability in natural sample response and the possibility of age-related strength to be significant for sites not subjected to earthquakes, high quality undisturbed samples are recommended over the use of reconstituted specimens to establish the cyclic strength of natural sands.

Research papers, University of Canterbury Library

This study investigates the uncertainty of simulated earthquake ground motions for smallmagnitude events (Mw 3.5 – 5) in Canterbury, New Zealand. 148 events were simulated with specified uncertainties in: event magnitude, hypocentre location, focal mechanism, high frequency rupture velocity, Brune stress parameter, the site 30-m time-averaged shear wave velocity (Vs30), anelastic attenuation (Q) and high frequency path duration. In order to capture these uncertainties, 25 realisations for each event were generated using the Graves and Pitarka (2015) hybrid broadband simulation approach. Monte-Carlo realisations were drawn from distributions for each uncertainty, to generate a suite of simulation realisations for each event and site. The fit of the multiple simulation realisations to observations were assessed using linear mixed effects regression to generate the systematic source, path and site effects components across all ground motion intensity measure residuals. Findings show that additional uncertainties are required in each of the three source, path, and site components, however the level of output uncertainty is promising considering the input uncertainties included.

Research papers, University of Canterbury Library

This article presents a quantitative case study on the site amplification effect observed at Heathcote Valley, New Zealand, during the 2010-2011 Canterbury earthquake sequence for 10 events that produced notable ground acceleration amplitudes up to 1.4g and 2.2g in the horizontal and vertical directions, respectively. We performed finite element analyses of the dynamic response of the valley, accounting for the realistic basin geometry and the soil non-linear response. The site-specific simulations performed significantly better than both empirical ground motion models and physics based regional-scale ground motion simulations (which empirically accounts for the site effects), reducing the spectral acceleration prediction bias by a factor of two in short vibration periods. However, our validation exercise demonstrated that it was necessary to quantify the level of uncertainty in the estimated bedrock motion using multiple recorded events, to understand how much the simplistic model can over- or under-estimate the ground motion intensities. Inferences from the analyses suggest that the Rayleigh waves generated near the basin edge contributed significantly to the observed high frequency (f>3Hz) amplification, in addition to the amplification caused by the strong soil-rock impedance contrast at the site fundamental frequency. Models with and without considering soil non-linear response illustrate, as expected, that the linear elastic assumption severely overestimates ground motions in high frequencies for strong earthquakes, especially when the contribution of basin edge-generated Rayleigh waves becomes significant. Our analyses also demonstrate that the effect of pressure-dependent soil velocities on the high frequency ground motions is as significant as the amplification caused by the basin edge-generated Rayleigh waves.