Kilmore Street, looking west from Manchester Street. The street has been barred off by wire fencing. A pile of steel, construction equipment and a portaloo sit in front of the cordon.
A photograph of the new Press Building on Gloucester Street under construction. To the right, the former Theatre Royal can be seen with wooden beams placed under the awning for support.
Demolition along Kilmore Street. A digger can be seen as well as a construction worker with a high hat and high-visibility vest. The rubble has been separated into different piles.
Fencing in Poplar Lane cuts one side off from the other, but a City Council sign reads "Businesses open as usual during construction", indicating the stores and bars are still open.
A photograph looking west down Tuam Street. C1 Espresso can be seen on the right. On the left, construction hoarding and scaffolding surrounds the badly-damaged McKenzie & Willis building.
The Government has handed the report of the Royal Commission on the Canterbury Earthquakes to the police to look at whether further action could be taken over the construction of the CTV building.
The building industry is celebrating the best in home construction with the House of the Year awards tomorrow night. Registered Master Builders chief executive David Kelly says the finalists include designs that have taken lessons from the Christchurch earthquakes.
The spire of Christ Church Cathedral once stood 20 storeys high but was reduced to less than half that by last year's earthquake. Its temporary replacement's construction began yesterday with the first sod turned.
Quin Henderson, South Island Manager, Hawkins Construction, part of the McConnell Group of companies, has donated $100,000 to the UC Business Partnerships Campaign for a three-year PhD scholarship in Engineering.
Page 16 of Section A of the Christchurch Press, published on Wednesday 27 June 2012.
Page 5 of Section A of the Christchurch Press, published on Wednesday 28 November 2012.
Page 3 of Section A of the Christchurch Press, published on Monday 22 October 2012.
Page 3 of Section A of the Christchurch Press, published on Tuesday 21 May 2013.
Page 5 of Section A of the Christchurch Press, published on Tuesday 18 September 2012.
There are many swaths of land that are deemed unsuitable to build on and occupy. These places, however, are rarely within an established city. The Canterbury earthquakes of 2010 and 2011 left areas in central Christchurch with such significant land damage that it is unlikely to be re-inhabited for a considerable period of time. These areas are commonly known as the ‘Red Zone’.This thesis explores redevelop in on volatile land through innovative solutions found and adapted from the traditional Indonesian construction techniques. Currently, Indonesia’s vernacular architecture sits on the verge of extinction after a cultural shift towards the masonry bungalow forced a rapid decline in their occupation and construction. The 2004 Indian Ocean earthquake and tsunami illustrated the bungalows’ poor performance in the face of catastrophic seismic activity, being outperformed by the traditional structures. This has been particularly evident in the Rumah Aceh construction of the Aceh province in Northern Sumatra. Within a New Zealand context an adaptation and modernisation of the Rumah Aceh construction will generate an architectural response not currently accepted under the scope of NZS 3604:2011; the standards most recent revision following the Canterbury earthquake of 2010 concerning timber-based seismic performance. This architectural exploration will further address light timber structures, their components, sustainability and seismic resilience. Improving new builds’ durability as New Zealand moves away from the previously promoted bungalow model that extends beyond residential and into all aspects of New Zealand built environment.
<b>Construction and Demolition (C&D) waste contributes to over 50% of New Zealand’s overall waste. Materials such as timber, plasterboard, and concrete make up 81% of the C&D waste that goes into landfills each year. Alongside this, more than 235 heritage-listed buildings have been demolished in Christchurch since the 2011 earthquakes. This research portfolio aims to find a solution to decrease C&D waste produced by demolishing heritage buildings.</b> With the recent announcement of The Cathedral of the Blessed Sacrament’s demolition, this will be another building added to the list of lost heritage in Christchurch. This research portfolio aims to bridge the relationship between heritage and waste through the recycling and reuse of the demolished materials, exploring the idea that history and heritage are preserved through building material reuse. This research portfolio mainly focuses on reducing construction and demolition waste in New Zealand, using the design of a new Catholic Cathedral as a vessel. This thesis will challenge how the construction and design industry deals with the demolition of heritage buildings and their contribution to New Zealand’s waste. It aims to explore the idea of building material reuse not only to reduce waste but also to retain the history and heritage of the demolished building within the materials.
Photograph captioned by BeckerFraserPhotos, "The BNZ building on Armagh Street with the PWC building under construction and Copthorne Hotel being demolished behind. The Forsyth Barr building can also be seen".
The performance of buildings in recent New Zealand earthquakes (Canterbury, Seddon and Kaikōura), delivered stark lessons on seismic resilience. Most of our buildings, with a few notable exceptions, performed as our Codes intended them to, that is, to safeguard people from injury. Many buildings only suffered minor structural damage but were unable to be reused and occupied for significant periods of time due to the damage and failure of non-structural elements. This resulted in substantial economic losses and major disruptions to our businesses and communities. Research has attributed the damage to poor overall design coordination, inadequate or lack of seismic restraints for non structural elements and insufficient clearances between building components to cater for the interaction of non structural elements under seismic actions. Investigations have found a clear connection between the poor performance of non-structural elements and the issues causing pain in the industry (procurement methods, risk aversion, the lack of clear understanding of design and inspection responsibility and the need for better alignment of the design codes to enable a consistent integrated design approach). The challenge to improve the seismic performance of non structural elements in New Zealand is a complex one that cuts across a diverse construction industry. Adopting the key steps as recommended in this paper is expected to have significant co-benefits to the New Zealand construction industry, with improvements in productivity alongside reductions in costs and waste, as the rework which plagues the industry decreases.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Sections of reinforcing steel have been laid up against the mural.
There is an increasing recognition that the seismic performance of buildings will be affected by the behaviour of both structural and non-structural elements. In light of this, work has been progressing at the University of Canterbury to develop guidelines for the seismic assessment of commercial glazing systems. This paper reviews the seismic assessment guidelines prescribed in Section C10 of the MBIE building assessment guidelines. Subsequently, the C10 approach is used to assess the drift capacity of a number of glazing units recently tested at the University of Canterbury. Comparing the predicted and observed drift capacities, it would appear that the C10 guidelines may lead to nonconservative estimates of drift capacity. Furthermore, the experimental results indicate that watertightness may be lost at very low drift demands, suggesting that guidance for the assessment of serviceability performance would also be beneficial. As such, it is proposed that improved guidance be provided to assist engineers in considering the possible impact that glazing could have on the structural response of a building in a large earthquake.
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers are kept busy moving scaffolding and fixtures and checking for damage".
Orientation: Large-scale events such as disasters, wars and pandemics disrupt the economy by diverging resource allocation, which could alter employment growth within the economy during recovery. Research purpose: The literature on the disaster–economic nexus predominantly considers the aggregate performance of the economy, including the stimulus injection. This research assesses the employment transition following a disaster by removing this stimulus injection and evaluating the economy’s performance during recovery. Motivation for the study: The underlying economy’s performance without the stimulus’ benefit remains primarily unanswered. A single disaster event is used to assess the employment transition to guide future stimulus response for disasters. Research approach/design and method: Canterbury, New Zealand, was affected by a series of earthquakes in 2010–2011 and is used as a single case study. Applying the historical construction–economic relationship, a counterfactual level of economic activity is quantified and compared with official results. Using an input–output model to remove the economy-wide impact from the elevated activity reveals the performance of the underlying economy and employment transition during recovery. Main findings: The results indicate a return to a demand-driven level of building activity 10 years after the disaster. Employment transition is characterised by two distinct periods. The first 5 years are stimulus-driven, while the 5 years that follow are demand-driven from the underlying economy. After the initial period of elevated building activity, construction repositioned to its long-term level near 5% of value add. Practical/managerial implications: The level of building activity could be used to confidently assess the performance of regional economies following a destructive disaster. The study results argue for an incentive to redevelop the affected area as quickly as possible to mitigate the negative effect of the destruction and provide a stimulus for the economy. Contribution/value-add: This study contributes to a growing stream of regional disaster economics research that assesses the economic effect using a single case study.
A empty site in Bexley where a house once stood. The foundations for the house can still be seen. A sign reading, 'Danger construction site' hangs on the security fence that surrounds the area.
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers abseil down the side of the civic building checking for any damage".
Urban Search and Rescue personnel escorting construction workers over a bridge on Colombo Street in the aftermath of the 22 February 2011 earthquake. The road and footpath have been severely warped by the earthquake.
Urban Search and Rescue personnel escorting construction workers over a bridge on Colombo Street in the aftermath of the 22 February 2011 earthquake. The road and footpath have been severely warped by the earthquake.
A photograph of members of the Diabetes Centre team working in an office. New gib board has been partly installed on the wall behind them. There is dust from the construction on the carpet.
A photograph of members of the Diabetes Centre team working in an office. New gib board has been partly installed on the wall behind them. There is dust from the construction on the carpet.
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers abseil down the side of the civic building checking for any damage".
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers abseil down the side of the civic building checking for any damage".