A photograph of workers repairing the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
View through the cordon fence of the vacant lot left by the demolition of the Copthorne Hotel on Durham Street.
A photograph of workers repairing the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph of workers repairing the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph of workers repairing the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph of workers repairing the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph of workers repairing the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph of workers repairing the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph of workers repairing the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph of workers repairing the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
Detail of some deconstruction work on the Crowne Plaza Hotel, close up with a digger on a pile of demolition rubble.
Photograph captioned by BeckerFraserPhotos, "The I-Stay Hotel on Cashel Street with 7-9 Liverpool Street on the right".
A photograph captioned by BeckerFraserPhotos, "A new building replacing a damaged and demolished historic hotel at 192 Moorhouse Avenue".
A photograph of the Excelsior Hotel as the north wall is rebuilt and the west-facing Manchester Street facade is restored.
A photograph of repair work on the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
Kilmore Street, looking west from Manchester Street. The street has been barred off by wire fencing. A pile of steel, construction equipment and a portaloo sit in front of the cordon.
View down Victoria Street, some buildings fenced off on the left and the Crown Plaza Hotel at the end of the street.
Fencing around the vacant lot left by the Copthorne Hotel which has been demolished. Some building rubble still remains on the site.
Photograph captioned by BeckerFraserPhotos, "The Holiday Inn Hotel on the south-east corner of High and Cashel Streets, under deconstruction".
Photograph captioned by BeckerFraserPhotos, "PricewaterhouseCoopers building, Rendezvous Hotel/Pacific Tower and Forsyth Barr building from Victoria Street (telephoto photo)".
The former post office building in Cathedral Square. In the background is the Ibis Hotel. Chairs and tables have been left abandoned outside Starbucks.
An aerial photograph captioned by BeckerFraserPhotos, "Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "Cathedral".
Christchurch hotels lost a million guest nights in the year following the February earthquake, but tourism in the city is now picking up again.
An aerial photograph captioned by BeckerFraserPhotos, "Town Hall and Convention Centre".
View through the trees alongside the Avon, Our City-O-Tautahi with bracing support on the front, and the Rydges hotel in the background.
A photograph captioned by Paul Corliss, "PWC, Copthorne and Forsyth Barr, central city".
A photograph captioned by Paul Corliss, "PWC, Copthorne and Forsyth Barr, central city".
A photograph captioned by Paul Corliss, "PWC, Copthorne and Forsyth Barr, central city".
Workers seen through a gap between wooden pallets in GapFiller's Pallet Pavillion. The photographer comments, "Though it looks strange and Photoshopped this is a straight shot through pallets painted blue. The Pallet Pavilion is built on the site of the demolished Crowne Plaza Hotel. It was built by volunteers, mainly students and construction engineers over 6 weeks. Here students are being given health and safety instructions before helping out on completing the temporary structure".