A document which outlines how to safely carry out lifting operations, created to discuss with site staff at on-site "toolbox talks".
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
An award submission nominating Paula Lock for the Hays NAWIC Excellence Awards 2015: Category: Professional Woman of the Year.
An award submission nominating Jane Taylor for the Hays NAWIC Excellence Awards 2016: Category: Professional Tradeswoman of the Year.
A document that describes a case study on how SCIRT has been designed to create an environment that delivers high performance.
A document which describes how SCIRT's governance structure was set up and developed in response to the many challenges of the horizontal infrastructure rebuild.
A revised memorandum of understanding that sets out how SCIRT and Connexis planned to work together to build an industry training framework and skilled workforce.
A plan which describes how the transition from the IRMO programme to the SCIRT programme will take place after the signing of the Alliance Agreement.
A document containing examples of items and activities SCIRT implemented as part of the programme to support businesses affected and disrupted by SCIRT central city rebuild work.
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Lyttelton area.
This document contains a list of the SCIRT GIS services, along with a brief description of what the groupings of layers were and why they were needed.
A plan which outlines the processes and IT applications and services required to manage the SCIRT programme. The first version of this plan was produced on 9 August 2011.
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
A document containing examples of the technical update newsletter which detailed SCIRT innovations. The newsletters in the document were produced between 1 July 2013 and 1 May 2014.
A pdf copy of a PowerPoint presentation used by Duncan Gibb when presenting his Brunel lecture.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
A plan which outlines how to manage the environmental impacts that result from SCIRT works. The first version of this plan was produced on 20 July 2011.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A photograph of the largest section of the Townsend Telescope recovered from the rubble of the Observatory tower. The telescope was housed in the tower at the Christchurch Arts Centre. It was severely damaged when the tower collapsed during the 22 February 2011 earthquake.
A photograph of an earthquake-damaged suitcase in the South Quad of the Christchurch Arts Centre. The suitcase is resting on a pile of scaffolding which had been constructed around the Observatory tower. The scaffolding collapsed along with the tower during the 22 February 2011 earthquake.
A photograph of the Townsend Telescope in the Observatory at the Christchurch Arts Centre. Graeme Kershaw, Technician at the University of Canterbury Department of Astronomy and Physics, is standing to the left. This image was used by Kershaw to identify the telescope's parts after the 22 February 2011 earthquake.
A photograph of Wayne Smith and Ken Vickery inside the Observatory at the Christchurch Arts Centre, taken in the 1970s. Smith and Vickery are pictured next to the Townsend Telescope, which they have just refurbished. No repair work was necessary during this process.
The now vacated Christchurch City Council building suffered some damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The now vacated Christchurch City Council building suffered some damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
A document which stipulates SCIRT's minimum standard for managing the risks arising from working around services.
A document describing the early warning system to alert team members of ground and structural movement at the Arch.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A technical paper prepared for the Water NZ conference and expo 2012, which details how GIS and InfoNet were used to complement SCIRT's asset assessment process.
A document which contains several examples of SCIRT Safety Alerts, which were documents sent out to inform and educate all site staff after an incident.