Monday 16 April 2012. File reference: CCL-2012-04-16-IMG_1686 From the collection of Christchurch City Libraries.
Saturday 14 April 2012. File reference: CCL-2012-04-16IMG_1504 From the collection of Christchurch City Libraries.
Monday 16 April 2012. File reference: CCL-2012-04-16-IMG_1681 From the collection of Christchurch City Libraries.
Saturday 14 April 2012. File reference: CCL-2012-04-16IMG_1464 From the collection of Christchurch City Libraries.
Saturday 14 April 2012. File reference: CCL-2012-04-16IMG_1511 From the collection of Christchurch City Libraries.
Saturday 14 April 2012. File reference: CCL-2012-04-16IMG_1470 From the collection of Christchurch City Libraries.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A photograph of the badly-damaged ChristChurch Cathedral.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
Demolition (Deconstruction) of the partially pancaked multi story car park above the old Smith City building. Taken from the Moorhouse-Colombo Street flyover.
PWS-2010-12-09-05560
PWS-2010-12-09-05573
PWS-2010-12-09-05574
PWS-2010-12-09-05571
PWS-2010-12-09-05567
PWS-2010-12-09-05570
PWS-2010-12-09-05572
PWS-2010-12-09-05568
PWS-2010-12-09-05562
PWS-2010-12-09-05569
PWS-2010-12-09-05566
PWS-2010-12-09-05556
PWS-2010-12-09-05565
PWS-2010-12-09-05555
PWS-2010-12-09-05554
PWS-2010-12-09-05564
PWS-2010-12-09-05557