Over 900 buildings in the Christchurch central business district and 10,000 residential homes were demolished following the 22nd of February 2011 Canterbury earthquake, significantly disrupting the rebuild progress. This study looks to quantify the time required for demolitions during this event which will be useful for future earthquake recovery planning. This was done using the Canterbury Earthquake Recovery Authority (CERA) demolition database, which allowed an in-depth look into the duration of each phase of the demolition process. The effect of building location, building height, and the stakeholder which initiated the demolition process (i.e. building owner or CERA) was investigated. The demolition process comprises of five phases; (i) decision making, (ii) procurement and planning, (iii) demolition, (iv) site clean-up, and (v) completion certification. It was found that the time required to decide to demolish the building made up majority of the total demolition duration. Demolition projects initiated by CERA had longer procurement and planning durations, but was quicker in other phases. Demolished buildings in the suburbs had a longer decision making duration, but had little effect on other phases of the demolition process. The decision making and procurement and planning phases of the demolition process were shorter for taller buildings, though the other phases took longer. Fragility functions for the duration of each phase in the demolition process are provided for the various categories of buildings for use in future studies.
Our poster will present on-going QuakeCoRE-founded work on strong motion seismology for Dunedin-Mosgiel area, focusing on ground motion simulations for Dunedin Central Business District (CBD). Source modelling and ground motion simulations are being carried out using the SCEC (Southern California Earthquakes Center) Broad Band simulation Platform (BBP). The platform computes broadband (0-10 Hz) seismograms for earthquakes and was first implemented at the University of Otago in 2016. As large earthquakes has not been experienced in Dunedin in the time of period of instrumental recording, user-specified scenario simulations are of great value. The Akatore Fault, the most active fault in Otago and closest major fault to Dunedin, is the source focused on in the present study. Simulations for various Akatore Fault source scenarios are run and presented. Path and site effects are key components considered in the simulation process. A 1D shear wave velocity profile is required by SCEC BBP, and this is being generated to represent the Akatore-to-CBD path and site within the BBP. A 3D shear velocity model, with high resolution within Dunedin CBD, is being developed in parallel with this study (see Sangster et al. poster). This model will be the basis for developing a 3D shear wave velocity model for greater Dunedin-Mosgiel area for future ground motion simulations, using Canterbury software (currently under development).
Buildings subject to earthquake shaking will tend to move not only horizontally but also rotate in plan. In-plan rotation is known as “building torsion” and it may occur for a variety of reasons, including stiffness and strength eccentricity and/or torsional effects from ground motions. Methods to consider torsion in structural design standards generally involve analysis of the structure in its elastic state. This is despite the fact that the structural elements can yield, thereby significantly altering the building response and the structural element demands. If demands become too large, the structure may collapse. While a number of studies have been conducted into the behavior of structures considering inelastic building torsion, there appears to be no consensus that one method is better than another and as a result, provisions within current design standards have not adopted recent proposals in the literature. However, the Canterbury Earthquakes Royal Commission recently made the recommendation that provisions to account for inelastic torsional response of buildings be introduced within New Zealand building standards. Consequently, this study examines how and to what extent the torsional response due to system eccentricity may affect the seismic performance of a building and considers what a simple design method should account for. It is concluded that new methods should be simple, be applicable to both the elastic and inelastic range of response, consider bidirectional excitation and include guidance for multi-story systems.
A 3D high-resolution model of the geologic structure and associated seismic velocities in the Canterbury, New Zealand region is developed utilising data from depthconverted seismic reflection lines, petroleum and water well logs, cone penetration tests, and implicitly guided by existing contour maps and geologic cross sections in data sparse subregions. The model, developed using geostatistical Kriging, explicitly represents the significant and regionally recognisable geologic surfaces that mark the boundaries between geologic units with distinct lithology and age. The model is examined in the form of both geologic surface elevation contour maps as well as vertical cross sections of shear wave velocity, with the most prominent features being the Banks Peninsula Miocene-Pliocene volcanic edifice, and the Pegasus and Rakaia late Mesozoic-Neogene sedimentary basins. The adequacy of the modelled geologic surfaces is assessed through a residual analysis of point constraints used in the Kriging and qualitative comparisons with previous geologic models of subsets of the region. Seismic velocities for the lithological units between the geologic surfaces have also been derived, thus providing the necessary information for a Canterbury velocity model (CantVM) for use in physics-based seismic wave propagation. The developed model also has application for the determination of depths to specified shear wave velocities for use in empirical ground motion modelling, which is explicitly discussed via an example.
A building boom in the 1980s allowed pre-stressed hollow-core floor construction to be widely adopted in New Zealand, even though the behaviour of these prefabricated elements within buildings was still uncertain. Inspections following the Canterbury and Kaikōura earthquakes has provided evidence of web-splitting, transverse cracking and longitudinal splitting on hollow-core units, confirming the susceptibility of these floors to undesirable failure modes. Hollow-core slabs are mainly designed to resist bending and shear. However, there are many applications in which they are also subjected to torsion. In New Zealand, hollow-core units contain no transverse reinforcement in the soffit concrete below the cells and no web reinforcement. Consequently, their dependable performance in torsion is limited to actions that they can resist before torsional cracking occurs. In previous work by the present authors, a three-dimensional FE modelling approach to study the shear flexural behaviour of precast pre-stressed hollow core units was developed and validated by full-scale experiments. This paper shows how the FE analyses have been extended to investigate the response of HC units subjected to torsional actions. Constitutive models, based on nonlinear fracture mechanics, have been used to numerically predict the torsional capacity of HC units and have been compared with experimental results. The results indicate that the numerical approach is promising and should be developed further as part of future research.
Recent earthquakes in New Zealand proved that a shift is necessary in the current design practice of structures to achieve better seismic performance. Following such events, the number of new buildings using innovative technical solutions (e.g. base isolation, controlled rocking systems, damping devices, etc.), has increased, especially in Christchurch. However, the application of these innovative technologies is often restricted to medium-high rise buildings due to the maximum benefit to cost ratio. In this context, to address this issue, a multi-disciplinary geo-structural-environmental engineering project funded by the Ministry of Business Innovation and Employment (MBIE) is being carried out at the University of Canterbury. The project aims at developing a foundation system which will improve the seismic performance of medium-density low-rise buildings. Such foundation is characterized by two main elements: 1) granulated tyre rubber mixed with gravelly soils to be placed beneath the structure, with the goal of damping part of the seismic energy before it reaches the superstructure; and 2) a basement raft made of steel-fibre rubberised concrete to enhance the flexibility of the foundation under differential displacement demand. In the first part of this paper, the overarching objectives, scope and methodology of the project will be briefly described. Then, preliminary findings on the materials characterization, i.e., the gravel-rubber mixtures and steel-fibre rubberised concrete mixes, will be presented and discussed with focus on the mechanical behaviour.
Following the recent earthquakes in Chile (2010) and New Zealand (2010/2011), peculiar failure modes were observed in Reinforced Concrete (RC) walls. These observations have raised a global concern on the contribution of bi-directional loading to these failure mechanisms. One of the failure modes that could potentially result from bidirectional excitations is out-of-plane shear failure. In this paper an overview of the recent experimental and numerical findings regarding out-of-plane shear failure in RC walls are presented. The numerical study presents the Finite Element (FE) simulation of wall D5-6 from the Grand Chancellor Hotel that failed in shear in the out-of-plane direction in the February 2011 Christchurch earthquake. The main objective of the numerical study was to investigate the reasons for this failure mode. The experimental campaign includes the recent experiments conducted in the Structural Engineering Laboratory of the University of Canterbury. The experimental study included three rectangular slender RC walls designed based on NZS3101: 2006-A3 (2017) for three different ductility levels, namely: nominally ductile, limited ductile and ductile. The numerical results showed that high axial load combined with bi-directional loading caused the out-of-plane shear failure in wall D5-6 from the Grand Chancellor Hotel. This was also confirmed and further investigated in the experimental phase of the study.
This study analyses the Earthquake Commission’s (EQC) insurance claims database to investigate the influence of seismic intensity and property damage resulting from the Canterbury Earthquake Sequence (CES) on the repair costs and claim settlement duration for residential buildings. Firstly, the ratio of building repair cost to its replacement cost was expressed as a Building Loss Ratio (BLR), which was further extended to Regional Loss Ratio (RLR) for greater Christchurch by multiplying the average of all building loss ratios with the proportion of building stock that lodged an insurance claim. Secondly, the total time required to settle the claim and the time taken to complete each phase of the claim settlement process were obtained. Based on the database, the regional loss ratio for greater Christchurch for three events producing shakings of intensities 6, 7, and 8 on the modified Mercalli intensity scale were 0.013, 0.066, and 0.171, respectively. Furthermore, small (less than NZD15,000), medium (between NZD15,000 and NZD100,000), and large (more than NZD100,000) claims took 0.35-0.55, 1.95-2.45, and 3.35-3.85 years to settle regardless of the building’s construction period and earthquake intensities. The number of claims was also disaggregated by various building characteristics to evaluate their relative contribution to the damage and repair costs.
Low Damage Seismic Design (LDSD) guidance material being developed by Engineering NZ is considering a design drift limit for multi-storey buildings of 0.5% at a new damage control limit state (DCLS). The impact of this new design requirement on the expected annual loss due to repair costs is investigated for a four-storey office building with reinforced concrete walls located in Christchurch. The LDSD guidance material aims to reduce the expected annual loss of complying buildings to below 0.1% of building replacement cost. The research tested this expectation. Losses were estimated in accordance with FEMA P58, using building responses from non-linear time history analyses (performed with OpenSees using lumped plasticity models). The equivalent static method, in line with NZS 1170.5 and NZS 3101, was used to design the building to LDSD specifications, representing a future state-of-practice design. The building designed to low-damage specification returned an expected annual loss of 0.10%, and the building designed conventionally returned an expected annual loss of 0.13%. Limitations with the NZS 3101 method for determining wall stiffness were identified, and a different method acknowledging the relationship between strength and stiffness was used to redesign the building. Along with improving this design assumption, the study finds that LDSD design criteria could be an effective way of limiting damage and losses.
Recurrent liquefaction in Christchurch during the 2010-2011 Canterbury earthquake sequence created a wealth of shallow subsurface intrusions with geometries and orientations governed by (1) strong ground motion severity and duration, and (2) intrinsic site characteristics including liquefaction susceptibility, lateral spreading severity, geomorphic setting, host sediment heterogeneity, and anthropogenic soil modifications. We present a suite of case studies that demonstrate how each of these characteristics influenced the geologic expressions of contemporary liquefaction in the shallow subsurface. We compare contemporary features with paleo-features to show how geologic investigations of recurrent liquefaction can provide novel insights into the shaking characteristics of modern and paleo-earthquakes, the influence of geomorphology on liquefaction vulnerability, and the possible controls of anthropogenic activity on the geologic record. We conclude that (a) sites of paleo-liquefaction in the last 1000-2000 years corresponded with most severe liquefaction during the Canterbury earthquake sequence, (b) less vulnerable sites that only liquefied in the strongest and most proximal contemporary earthquakes are unlikely to have liquefied in the last 1000-2000 years or more, (c) proximal strong earthquakes with large vertical accelerations favoured sill formation at some locations, (d) contemporary liquefaction was more severe than paleoliquefaction at all study sites, and (e) stratigraphic records of successive dike formation were more complete at sites with severe lateral spreading, (f) anthropogenic fill suppressed surface liquefaction features and altered subsurface liquefaction architecture.
This paper presents a seismic velocity model of Canterbury, New Zealand based on 3D geologic surfaces and velocities from a range of data sources. The model provides the 3D crustal structure in the region at multiple length scales for seismic wave propagation simulations, such as broadband ground motion and shallow site response analyses related to understanding the ground motions and site responses during the 2010- 2011 Canterbury earthquakes. Pre-Quaternary geologic horizons are calculated based on the reinterpretation of a comprehensive network of seismic reflection surveys from seven different campaigns over the past 50 years, as well as point constraints across an array of petroleum industry drill holes. Particular attention is given to a detailed representation of Quaternary stratigraphy, representing shallow (z<250m) near-surface layers in the model. Seismic velocities are obtained from seismic reflection processing (for Vp) and also recently performed active and passive surface wave analyses (for Vs). Over 1,700 water wells in the region are used to constrain the complex inter-bedded Quaternary stratigraphy (gravels, sands, silts, organics etc.) near the coastline, including beneath urban Christchurch, which has resulted from fluvial deposition and marine regression and transgression. For the near-surface Springston and Christchurch Formations in the Christchurch urban area (z<50m), high-spatial resolution seismic velocities (including Vs30 ) were obtained from over 13,000 cone penetration tests combined with a recently developed CPT-Vs correlation.
The Townsend Observatory is located in the Arts Centre of Christchurch, in what used to be Canterbury College (now University of Canterbury). The Townsend telescope itself is a historic 6-inch Cooke refractor built in 1864 for early Christchurch colonist, Mr James Townsend, and gifted by him to Christchurch College in 1891. At the same time, the Canterbury Astronomical Society handed over its funds to the College to help erect an observatory. The College used this, and money it had set aside for a medical school, to build a biological laboratory with an attached observatory tower, which was completed in 1896. The Biology Building and Observatory Tower was the last major design by architect Benjamin Mountfort. Mr Walter Kitson was appointed custodian of the telescope and regular public open nights commenced. and continued until 2010, with the telescope being operated by students of the Department of Physics and Astronomy, University of Canterbury. The Observatory Tower was badly damaged in the 4 September 2010 earthquake and collapsed in the 22 February 2011 earthquake. The telescope was badly damaged by the collapse, but, amazingly, the optics were found entirely intact. The Department of Physics and Astronomy plans to restore the Townsend Telescope so that it can be returned to a replica Observatory Tower in its central city home, enabling the people of Christchurch, and visitors, to enjoy views of the night sky through this beautiful and historic telescope once again.
he strong motion station at Heathcote Valley School (HVSC) recorded unusually high peak ground accelerations (2.21g vertical and 1.41g horizontal) during the February 2011 Christchurch earthquake. Ground motions recorded at HVSC in numerous other events also exhibited consistently higher intensities compared with nearby strong motion stations. We investigated the underlying causes of such high intensity ground motions at HVSC by means of 2D dynamic finite element analyses, using recorded ground motions during the 2010-2011 Canterbury earthquake sequence. The model takes advantage of a LiDAR-based digital elevation model (DEM) to account for the surface topography, while the geometry and dynamic properties of the surficial soils are characterized by seismic cone penetration tests (sCPT) and Multi-Channel Analyses of Surface Waves (MASW). Comparisons of simulated and recorded ground motions suggests that our model performs well for distant events, while for near-field events, ground motions recorded at the adopted reference station at Lyttelton Port are not reasonable input motions for the simulation. The simulations suggest that Rayleigh waves generated at the inclined interface of the surficial colluvium and underlying volcanic rock strongly affect the ground motions recorded at HVSC, in particular, being the dominant contributor to the recorded vertical motions.
Severe liquefaction was repeatedly observed during the 2010 - 2011 C hristchurch earthquake s , particularly affecting deposits of fine sands and silty sands of recent fluvial or estuarine origin. The effects of liquefaction included major sliding of soil tow ard water bodies ( i.e. lateral spreading ) rang ing from centimetres to several metres. In this paper, a series of undrained cyclic torsional shear tests were conducted to evaluate the liquefaction and extremely large deformation properties of Christchurch b oiled sand . In these tests, the simple shear conditions were reproduced in order to apply realistic stress conditions that soil s experience in the field during horizontal seismic shaking. Several hollow cylindrical medium dense specimens ( D r = 50%) were pr epared by pluviation method, isotropically consolidated at an effective stress of 100 kPa and then cyclically sheared under undrained conditions up to 10 0% double amplitude shear strain (γ DA ) . The cyclic strength at different levels of γ DA of 7.5%, 15%, 3 0 % and 6 0%, development of extremely large post - liquefaction deformation and shear strain locali s ation properties were assessed from the analysis of the effective stress paths and stress - strain responses . To reveal possible distinctiveness, the cyclic undra ined behaviour of CHCH boiled sand was compared with that of Toyoura sand previously examined under similar testing conditions
The need for a simple but rigorous seismic assessment procedure to predict damage to reinforced concrete buildings during a seismic event has been highlighted following the Canterbury Earthquake sequence. Such simplified assessment procedure, applied to individual structure or large building inventory, should not only have low requirement in terms of input information and involve straightforward analyses, but also should be capable to provide reliable predictive results within short timeframe. This research provides a general overview and critical comparison of alternative simplified assessment procedures adopted in NZSEE 2006 Guidelines (Assessment and Improvement of the Structural Performance of Buildings in Earthquakes), ASCE 41-13 (Seismic Evaluation and Retrofit of Existing Buildings), and EN: 1998-3: 2005 (Assessment and Retrofitting of Buildings). Particular focus is given to the evaluation of the capability of Simplified Lateral Mechanism Analysis (SLaMa), which is an analytical pushover method adopted in NZSEE 2006 Guidelines. The predictive results from SLaMa are compared to damages observed for a set of reinforced concrete buildings in Christchurch, as well as the results from more detailed assessment procedure based on numerical modelling. This research also suggests improvements to SLaMa, together with validation of the improvements, to include assessment of local mechanism by strength hierarchy evaluation, as well as to develop assessment of global mechanism including post-yield mechanism sequence based on local mechanism.
Data from the 2010-2011 Canterbury earthquake sequence (CES) provides an unprecedented opportunity to assess and advance the current state of practice for evaluating liquefaction triggering. Towards this end, select case histories from the CES are used herein to assess the predictive capabilities of three alternative CPT-based simplified liquefaction evaluation procedures: Robertson and Wride (1998); Moss et al. (2006); and Idriss and Boulanger (2008). Additionally, the Liquefaction Potential Index (LPI) framework for predicting the severity of surficial liquefaction manifestations is also used to assess the predictive capabilities of the liquefaction evaluation procedures. Although it is not without limitations, use of the LPI framework for this purpose circumvents the need for selecting “critical” layers and their representative properties for study sites, which inherently involves subjectivity and thus has been a point of contention among researchers. It was found that while all the assessed liquefaction triggering evaluation procedures performed well for the parameter ranges of the sites analyzed, the procedure proposed by Idriss and Boulanger (2008) yielded predictions that are more consistent with field observations than the other procedures. However, use of the Idriss and Boulanger (2008) procedure in conjunction with a Christchurch-specific correlation to estimate fines content showed a decreased performance relative to using a generic fines content correlation. As a result, the fines correction for the Idriss and Boulanger (2008) procedure needs further study.
The Canterbury earthquakes resulted in numerous changes to the waterways of Ōtautahi Christchurch. These included bank destabilisation, liquefaction effects, changes in bed levels, and associated effects on flow regimes and inundation levels. This study set out to determine if these effects had altered the location and pattern of sites utilised by īnanga (Galaxias maculatus) for spawning, which are typically restricted to very specific locations in upper estuarine areas. Extensive surveys were carried out in the Heathcote/Ōpāwaho and Avon/Ōtākaro catchments over the four peak months of the 2015 spawning season. New spawning sites were found in both rivers and analysis against pre-earthquake records identified that other significant changes have occurred. Major changes include the finding of many new spawning sites in the Heathcote/Ōpāwaho catchment. Sites now occur up to 1.5km further downstream than the previously reported limit and include the first records of spawning below the Woolston Cut. Spawning sites in the Avon/Ōtākaro catchment also occur in new locations. In the mainstem, sites now occur both upstream and downstream of all previously reported locations. A concentrated area of spawning was identified in Lake Kate Sheppard at a distinctly different location versus pre-quake records, and no spawning was found on the western shores. Spawning was also recorded for the first time in Anzac Creek, a nearby waterway connected to Lake Kate Sheppard via a series of culverts.
- The Avon-Ōtākaro Redzone is an 11 kilometer stretch of land along the Avon-Ōtākaro River in Christchurch. - This project focused on the creation of a publicly available biodiversity map of the AvonŌtākaro River Corridor, a project undertaken as part of the ecological restoration of the Christchurch redzone. - This project originated from the Christchurch 2010-2011 earthquake sequence which saw liquefaction damage along 11km of the Avon River. Under guidance from The Nature Lab & Ōtākaro Living Laboratory, and various other experts, the primary research objective was to map historical biodiversity, identify hotspots, and assess areas for potential revegetation. - The data collected came from historical black maps, current iNaturalist data, and soil classification information. - The findings show that, pre-colonialism, the area was composed of herbaceous areas, wetlands, native shrubland, and tussock land, with key plants such as river, fern, tutu, and cabbage trees. - The post-earthquake analysis shows a transition from a residential area to patchy grasslands and swampy areas. - The findings also showed a strong relationship between historic sites and soil classifications, providing knowledge for past and future vegetation patterns and spread. - This map will be a valuable resource for conservation efforts and public engagement as the area transitions into a blue-green corridor.
In Aotearoa, New Zealand people are living longer, alongside a slowing birthrate, the older population is growing faster than the younger population. As people live longer, there is an increased need for social services and support that cater for older persons, including care takers, mental health services, and community groups. Social work plays an important role in an ageing society because it addresses the multifaceted needs for older people. While there has been recent research conducted on the experiences of older persons, none have been undertaken in the unique context of the Eastern suburbs of Ōtautahi, Christchurch, an area adversely impacted by the 2011 earthquakes. This research specifically looks at the experiences of older residents in the East, considering various intersecting characteristics such as age, gender, ethnicity, socioeconomic status, available supports, community engagement and relationships to explore the multifaceted experiences and needs of this cohort. This research is a qualitative study influenced by intersectionality and place theories. Both underpinning theories are important in understanding social dynamics, identities, and lived experiences within this community research project. I interviewed nine participants from the Eastern suburbs of Ōtautahi, Christchurch using semi-structured interviews. Interviews were analysed using thematic analysis and detailed journaling. The data from these interviews generated the main themes discussed in this thesis: community connections, places with meaning, and accessing social support services.
The Manchester Courts building was a heritage building located in central Christchurch (New Zealand) that was damaged in the Mw 7.1 Darfield earthquake on 4 September 2010 and subsequently demolished as a risk reduction exercise. Because the building was heritage listed, the decision to demolish the building resulted in strong objections from heritage supporters who were of the opinion that the building had sufficient residual strength to survive possible aftershock earthquakes. On 22 February 2011 Christchurch was struck by a severe aftershock, leading to the question of whether building demolition had proven to be the correct risk reduction strategy. Finite element analysis was used to undertake a performance-based assessment, validating the accuracy of the model using the damage observed in the building before its collapse. In addition, soil-structure interaction was introduced into the research due to the comparatively low shear wave velocity of the soil. The demolition of a landmark heritage building was a tragedy that Christchurch will never recover from, but the decision was made considering safety, societal, economic and psychological aspects in order to protect the city and its citizens. The analytical results suggest that the Manchester Courts building would have collapsed during the 2011 Christchurch earthquake, and that the collapse of the building would have resulted in significant fatalities.
Text at the top of the cartoon reads 'News - A "Moon man non-event lunch" will be held above Christchurch to defy quake predictions for that day'. In tea rooms on hills above Christchurch a group of people enjoy lunch as they defy precaution against a predicted earthquake. They order a 'pot o' tea', 'pie & chips', 'sandwich & coke' and a 'shake & roll'; above in a black and thunderous cloud God thinks he heard someone request a shake & a roll'. Context - After the two big earthquakes in Christchurch on 4 September 2010 and 22 February 2011, the so-called Moon Man Ken Ring is backing away from his prediction that Christchurch will be whacked by a huge earthquake today (20 March 2011). His claims have terrified Cantabrians and led to people fleeing Christchurch. M.P. Nick Smith and the Skeptics Society are planning a lunch in one of Christchurch's highest, oldest, stone buildings - on the day that "moon man" Ken Ring says the city will be hit by another devastating earthquake ; the lunch will be held at noon on March 20 at the Sign of the Kiwi, on the top of the Port Hills - which Smith said was the closest building to the epicentre of the February 22 quake. Quantity: 1 digital cartoon(s).
Surrounded by mud and puddles in Christchurch Prime Minister John Key puts his arm round co-leader of the Maori Party Pita Sharples and smiles happily; behind them is a brand new plastic portaloo. On the ground lies a newspaper with a headline that reads 'Govt. to fund $2m giant RWC plastic waka'. Pita Sharples says 'and to show we're not neglecting our priorities in these austere times, Christchurch will get a new plastic portaloo!' Context - The government has hit back at criticism over a $2 million venue centre in the shape of a waka for the Rugby World Cup (RWC), defending the cost as necessary to host a world-class event. Co-leader of the Maori Party Pita Sharples says the waka will promote Maori culture during the Rugby World Cup and at other events (like the America's Cup). Labour Party MP Shane Jones asks "How can Dr Sharples and Prime Minister John Key actually believe that this expensive indulgence is a positive advertisement for Maori? The truth is they don't but they're both working together in a desperate effort to keep the Maori Party afloat. Quantity: 1 digital cartoon(s).
Refers to the government's earthquake response legislation and the Rugby World Cup 2011 (Empowering) Bill. 26 experts in constitutional law from all six of the country's law faculties have penned a letter condemning the Government's earthquake response legislation. No sooner was their work in the public eye than the similarly flawed Rugby World Cup 2011 (Empowering) Bill was reported back from a select committee, with a recommendation that it pass. It also goes far beyond what is required to get things done. In bypassing the normal consent process, the bill says the authority does not have to hold hearings on applications and that its decisions can be challenged in the High Court only on points of law. Effectively, the legislation asks New Zealanders to accept that the Rugby World Cup Minister knows best. It is he who knows how the event must be run. Precisely the same attitude pervades the Canterbury Earthquake Response and Recovery Act. This hands individual Government ministers the power to change almost every law, thereby handing Parliament's normal law-making role to the Executive. Their decisions cannot be challenged in any court'. (NZ Herald editorial - 1 October 2010) Quantity: 1 digital cartoon(s).
Christchurch City has to be rebuilt after the earthquakes of 4 September 2010 and 22 February 2011. People are being invited to contribute ideas about how to rebuild on a city council website. A group of people look at ideas on computers; a boy comments that 'this one looks just like the old city' and his father comments 'but built fifty miles up the road!' A woman looks at what appears to be pre European Maori pa site and says 'Hone Harawira wants something pre-European!' Another woman looks at a map of the middle of the South Island and says 'Rodney Hide doesn't care as long as Christchurch combines with Timaru and Westport!' Context - Former ACT leader Rodney Hide in his role as Minister for Local Government likes 'supercities' and Hone Harawira has left the Maori Party, fed up with the compromises he believes they have to make to suit their coalition agreement with the National government. He seems to prefer a city that will reflect simpler pre-European times. Colour and black and white versions available Quantity: 2 digital cartoon(s).
The title is 'Gambling on the rise in Christchurch'. Several vignettes show two men running in the 'Porta-loo stakes (runs)'; people betting on the 'size of the next shake'; people betting on 'who will have the last chimney standing'; a man sitting over a pot on a little gas ring wondering 'How long will it take to boil a 3 minute egg... when it's minus 10 in the kitchen'; someone in a car wondering 'Whose street can wipe out the most engine sumps'; and someone wondering 'Which power company will be first to put people before profits'. Context: The way of things following the earthquakes of September 4 2010, 22 February 2011 and 13 June 2011. The Problem Gambling Foundation says it is concerned more Christchurch people are turning to gambling to combat stress from earthquakes. It says spending on pokie machines in Christchurch has risen by almost $4 million, going against a downward national trend. The foundation says the data released by the Department of Internal Affairs shows spending on gaming machines rose by more than $3,800,000 in Christchurch city to almost $23 million. (Radio NZ News 26 July 2011) Colour and black and white versions available Quantity: 2 digital cartoon(s).
The cartoon shows Christchurch obscured by ash. Text reads 'Christchurch recovery package' and below are the words 'Cash cloud'. Context - Beginning on the 6th of June the Puyehue-Cordon Caulle volcano has been erupting for more than a week. Drifting ash clouds have been interupting flights. On Thursday 23 June Prime Minister John Key, Canterbury Earthquake Recovery Minister Gerry Brownlee and representatives from engineering consultants Tonkin & Taylor announced the first part of the Government's long-awaited land report that revealed the fate of up to 5000 quake-damaged homes. These homes were in the 'red zone'. But 10,500 owners in the orange zone were left in limbo, with their properties requiring further assessment. One of the options presented to residents in the red zone, ideal for people with replacement policies, was the government bought your land, and you dealt directly with your insurers about your house. However they got a shock when insurers told them they won't replace their homes, they'll only repair them, even though they're earmarked for certain demolition. Quantity: 1 digital cartoon(s).
In the top frame someone unseen (Murray McCully) in the Beehive says 'John! - There's been a bad reaction to us taking special powers to fix problems in Auckland!' Prime Minister John Key says 'What Murray?' In the lower frame Minister for the Rugby World Cup, Murray McCully, says 'The worst hit parts of Christchurch have declared themselves Fan Zones!' and the PM says 'Oh S..t!' The little Evans man says 'Sounds better than Red Zone!' Context: Refers to the chaos over transport and crowd control in the fanzone when much larger numbers of people flocked to the Rugby World Cup opening and revelry than expected. The government used special powers to take over the management of Queens Wharf fanzone spaces previously managed by an Auckland Council group, thus rather undermining the Mayor, Len Brown and the Auckland City Council. A new plan was signed off under special powers by Murray McCully directly after the fiasco. The Christchurch comment refers to the areas worst hit by the earhquakes. Colour and black and white versions available Quantity: 2 digital cartoon(s).
As a result of the 4 September 2010 Darfield earthquake and the more damaging 22 February 2011 Christchurch earthquake, considerable damage occurred to a significant number of buildings in Christchurch. The damage that occurred to the Christchurch Roman Catholic Cathedral of the Blessed Sacrament (commonly known as the Christchurch Basilica) as a result of the Canterbury earthquakes is reported, and the observed failure modes are identified. A previous strengthening intervention is outlined and the estimated capacity of the building is discussed. This strengthening was completed in 2004, and addressed the worst aspects of the building's seismic vulnerability. Urgent work was undertaken post-earthquake to secure parts of the building in order to limit damage and prevent collapse of unstable parts of the building. The approach taken for this securing is outlined, and the performance of the building and the previously installed earthquake strengthening intervention is evaluated.A key consideration throughout the project was the interaction between the structural securing requirements that were driven by the requirement to limit damage and mitigate hazards, and the heritage considerations. Lessons learnt from the strengthening that was carried out, the securing work undertaken, and the approach taken in making the building "safe" are discussed. Some conclusions are drawn with respect to the effectiveness of strengthening similar building types, and the approach taken to secure the building under active seismic conditions. AM - Accepted Manuscript
In the early morning of 4th September 2010 the region of Canterbury, New Zealand, was subjected to a magnitude 7.1 earthquake. The epicentre was located near the town of Darfield, 40 km west of the city of Christchurch. This was the country’s most damaging earthquake since the 1931 Hawke’s Bay earthquake (GeoNet, 2010). Since 4th September 2010 the region has been subjected to thousands of aftershocks, including several more damaging events such as a magnitude 6.3 aftershock on 22nd February 2011. Although of a smaller magnitude, the earthquake on 22nd February produced peak ground accelerations in the Christchurch region three times greater than the 4th September earthquake and in some cases shaking intensities greater than twice the design level (GeoNet, 2011; IPENZ, 2011). While in September 2010 most earthquake shaking damage was limited to unreinforced masonry (URM) buildings, in February all types of buildings sustained damage. Temporary shoring and strengthening techniques applied to buildings following the Darfield earthquake were tested in February 2011. In addition, two large aftershocks occurred on 13th June 2011 (magnitudes 5.7 and 6.2), further damaging many already weakened structures. The damage to unreinforced and retrofitted clay brick masonry buildings in the 4th September 2010 Darfield earthquake has already been reported by Ingham and Griffith (2011) and Dizhur et al. (2010b). A brief review of damage from the 22nd February 2011 earthquake is presented here
Prime Minister John Key stands grinning on a cracked pedestal bearing the words 'Most popular P.M.' In the background is the Beehive flying a skull and crossbones flag. The landscape is a desert with cactus and dried bones and a vulture in a bare tree. A man and a woman comment that it looks as though the quake may have done damage in Wellington after all, that and the crash of the SCF fund. Refers to two major events in the Canterbury area in recent times that have incurred huge government costs; these are the collapse of the South Canterbury Finance Company and the earthquake that struck early Saturday morning 4th September. The South Canterbury Finance Company has been taken into receivership by the government which has guaranteed that all 30,000 fortunate high-risk investors will be paid out $1.6b thanks to the taxpayer. Treasury is assuming that the cost of the earthquake will reach $4 billion, including $2 billion worth of estimated damage to private dwellings and their contents, $1 billion of damage to commercial property, and $1 billion worth of damage to public infrastructure. There is a colour and a black and white version of this cartoon Quantity: 2 digital cartoon(s).