Photograph captioned by Fairfax, "The Jacobsen Tile building (formerly Maddison's Pub) on the corner of Moorhouse Avenue and Montreal Street has its cornice work demolished after it become unsafe during Wednesday's earthquake".
A view of an empty site that is now covered with weeds and silt from liquefaction. On the site is a digger and two shipping containers. In the background, demolition work on the Manchester Securities House can be seen.
Photograph captioned by Fairfax, "Rubberneckers driving by or watching the Christchurch Chinese Methodist Church on Papanui Road have its spire carefully removed so that restoration work can be considered".
Work has finally begun dismantling Lancaster Park in Christchurch, six years after it was damaged beyond repair in the February earthquake. It comes at the same time the city's leaders debate what a new stadium could look like and who will pay.
Principal contractors can achieve better financial performance in civil construction projects by increasing the proportion of works delivered by subcontractors. However, anecdotally the use of subcontractors is thought to be make principal contractors less competitive due to compounding profit margins. This study found that projects with a higher proportion of subcontracted work exhibit better financial results than projects with less work delivered by subcontractors. This study uses the Christchurch Infrastructure Alliance (known as the Stronger Christchurch Infrastructure Rebuild Team, SCIRT) as a case study to observe why principal contracting firms engage subcontractors and the effect subcontracting has on the overall performance of a construction project. Five top tier civil contracting firms (known as ‘delivery teams’) participated in the alliance. Each team was responsible for the delivery of individual projects. A sample of 334 individual SCIRT projects were analysed, and key delivery team staff were surveyed, to investigate the effect subcontractor engagement has on performance. Between the five delivery teams there were clear differences in how much work was delivered via subcontracts. The extent of this subcontractor engagement had a significant effect on the relative performance of the principal contractor. A positive correlation between subcontractor engagement and overall financial performance is observed, and a negative correlation is observed between subcontractor engagement and non-financial performance. Although the causes of these relationships appear complex, the primary reason appears to be that subcontracting fosters increased productivity by cascading financial performance incentives closer to the physical construction task. To maximise competitiveness and financial performance, principal contractors must embrace the use of subcontractors and develop efficient systems of managing subcontracted work.
Site of CCDU, the Government agency responsible for rebuilding Christchurch after the earthquakes and resulting demolition. Includes vision for the city, profile of the director, reasons to invest in Christchurch central, work programme for the unit, and video file.
Three leading artists: the singer Madeleine Pierard; the children's book illustrator Gavin Bishop and playwright and actor Jacob Rajan discuss why they create work with Paul Bushnell. Awa Press writer Jane Bowron reads from her book Old Bucky & Me: Dispatches from the Christchurch Earthquake.
Almost a hundred homes north of Christchurch are declared unsafe to live in, 86 people who worked at Kaiapoi's New World supermarket are now jobless after Saturday's earthquake destroyed the store and a top defence official quits following allegations he lied on his CV.
Christchurch city remains shut down this morning as authorities seek to make the city safe after Saturday's massive earthquake. All schools are closed today, workers in the central city are being told not to go to work and city buses are cancelled.
Mike Ardagh is a specialist emergency physician at Christchurch Hospital, who is chairing a research group which is looking into the health implications of the earthquakes. His work in improving the efficiency and performance of emergency departments was recognised in the New Year's Honours.
Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. Historic buildings around Christchurch received varying degrees of damage. The Arts Centre at the Worcester/Montreal corner where strengthening has worked".
Photograph captioned by Fairfax, "Christchurch earthquake. 110 year old cast iron work being removed from The Press tower after it was discovered to be damaged. Richard Cosgrove, Press Illustrations Editor, documents the event".
Photograph captioned by Fairfax, "Christchurch earthquake. 110 year old cast iron work being removed from The Press tower after it was discovered to be damaged. George Piper (L) The Press carpenter oversees the removal".
A photograph of an office in the Diabetes Centre which has been prepared for earthquake repair work. Furniture and other office materials have been stacked in the corner of the room. Several tiles are missing from the ceiling above.
A photograph of a room in the Diabetes Centre which has been wrapped in plastic. There is a step ladder in the background and several work tools on the covered furniture. Several tiles are missing from the ceiling above.
Photograph captioned by Fairfax, "Mayor Bob Parker, too busy with meetings and work to get fully on the election campaign trail. In a meeting with Paul Ellis about the earthquake relief concert".
Cracks in the parapet of this beautiful Madras Street building that I walk past to / from work everyday; aftermath of the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
Cracks in the parapet of this beautiful Madras Street building that I walk past to / from work everyday; aftermath of the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
Cracks in the beam of this beautiful Madras Street building that I walk past to / from work everyday; aftermath of the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
A video of an interview with Anne Mackenzie, structural engineer at Build Green Ltd, about her work to retrieve items from The Suit Doctor and Smith's Bookshop on Manchester Street.
The Canterbury earthquakes, which started with the 7.1 magnitude event on September 4, 2010, caused significant damage in the region. The September 4 earthquakes brought substantial damage to land, buildings, and infrastructure, while the 6.3 magnitude earthquake on February 22, 2011 (and its subsequent aftershocks), brought even greater property damage, but also significant loss of life in addition to the region. Thousands were injured, and 185 persons died. A national State of Emergency was declared and remained in effect until April 30, 2011. A significant number of people required immediate assistance and support to deal with loss, injury, trauma experiences, and property damages. Many had to find alternate accommodation as their houses were too damaged to stay in. Of those affected, many were already vulnerable, and others had been too traumatized by the events to effectively deal with the challenges they were faced with. A number of human service organizations in the region, from both government and non-government sectors, joined forces to be able to more effectively and efficiently help those in need. This was the start of what would become known as the Earthquake Support Coordination Service. The aim of this report is to present an evaluation of the Earthquake Support Coordination Service and its collaborative organization, based on documentation and interviews with key stakeholders of the service. The aim is also to evaluate the service based on perspectives gathered among the clients as well as the coordinators working in the service. The final aim is to offer a reflection on the service model, and on what factors enabled the service, as well as recommendations regarding aspects of the service which may require review, and aspects which may be useful in other contexts.
An experiment to see if the cast of a play can make friends with their audience in just an hour is the latest project by the country's only theatre company involving people who are - or have been - homeless. As part of the Auckland Fringe Festival, the Hobson Street Theatre Company is working with the Street Choir on That's What Friends Are For.: It's directed by Dr Peter O'Connor from the University of Auckland. He's worked with survivors of natural disasters like the Christchurch earthquakes to help people - especially children - work through the trauma. Lynn Freeman talks with Peter, and with one of the actors, Richard. That's What Friends Are For premieres on Tuesday at the Basement Theatre as part of the Auckland Fringe, before heading to the fringe festivals in Wellington and Dunedin.
Presentation by Associate Professor Kate Van Heugten (Human Services and Social Work Department) on "Challenges and Rewards of Working in the Human Services in the Aftermath of the Canterbury Earthquakes 2010/2011".
Kaikoura and Wellington businesses operating adjacent to quake damaged buildings may face disruption for years to come as owners drag their feet on repair or demolition work. A Christchurch property owner has been unable to completely re-open for business since the February 2011 earthquake.
The Christchurch earthquake last February forced many circus performers to flee the city in search of work. Their base - the Circo Arts school - was damaged in the quake and is likely to be demolished. But they're now slowly returning, as a new base for circus performers is established in the city.
A document outlining Rosemary Du Plessis's background and work as the Research Coordinator for the National Council of Women of New Zealand (NCWNZ) project, Women's Voices: Recording women's stories of the Canterbury earthquakes. Du Plessis was the recipient of the May Fran Myers Award for 2014.
Photograph captioned by Fairfax, "Christchurch Earthquake. Christchurch was rocked by a large aftershock shortly after 8am this morning. Construction workers on Gloucester Street stopped work after the aftershock which measured 5.1 on the Richter scale".
Demolition site and street art on a wall on Colombo Street, Sydenham. The work on the left is a Gap Filler project, Wayne Youle's "I seem to have temporarily misplaced my sense of humour " (2011), a shadow-board mural which depicts things lost during the earthquake.
Mural on the side wall of Perry's Cafe on Madras Street. It depicts two work men; one speech bubble saying "Is my crack showing?" and in other other it says "Don't be silly!". A topical joke about the cracks on the wall and Christchurch in general.
Reconstruction work on Terrace on the Park Apartments. Two of the building required urgent demolition, while the others in the complex are being cleared out for demolition. Some furniture from the apartments can been seen on the balcony, whereas in other apartments, deconstructed furnishings can be seen.