Search

found 363 results

Images, UC QuakeStudies

A photograph of a member of an emergency management team standing in front of an excavator on Manchester Street. The excavator is sitting on top of a pile of rubble from several earthquake-damaged buildings. In the background is another excavator clearing rubble.

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Getting sorted. Most gear in place, still making adjustments".

Images, UC QuakeStudies

A member of the Fire Service entering the Forsyth Barr building through a window in order to check for people trapped by the 22 February 2011 earthquake. A sign reading, "Help" has been stuck to one of the windows and a window above has already been broken by the team.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. Teams of building inspectors gathered at the Linwood Service Centre before heading into the eastern suburbs en masse. Movement around Dallington Terrace was varied. The Medway Street footbridge from River Road to Avonside Drive".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Room 709 sofas".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Our office, Room 709".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Jess's desk. Viewed from my side of the couch".

Images, UC QuakeStudies

A member of the Fire Service using an axe to break one of the Forsyth Barr building's windows in order to check for people trapped by the 22 February 2011 earthquake. A sign reading, "Help" has been stuck to one of the windows and a window above has already been broken by the team.

Images, UC QuakeStudies

A member of the Fire Service using an axe to break one of the Forsyth Barr building's windows in order to check for people trapped by the 22 February 2011 earthquake. A sign reading, "Help" has been stuck to one of the windows and a window above has already been broken by the team.

Images, UC QuakeStudies

Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake. Behind them a team of Fire Service and Urban Search and Rescue personnel can be seen using a crane to check the Forsyth Barr building for trapped people.

Images, UC QuakeStudies

Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake. Behind them a team of Fire Service and Urban Search and Rescue personnel can be seen using a crane to check the Forsyth Barr building for trapped people.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. USAR team members Mike Harvey, left, Craig Stevenson and Dr Jan Kupec, right, with Loss Adjustor Jonathan Winn from Cunningham Lindsey, centre right, work on Riccarton Road at the Rotherham Street intersection where several buildings were cordoned off".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Reception. This is where students used to come to enquire about support services".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. South view over trees to the hills".

Images, UC QuakeStudies

Members of the University of Canterbury's E-Learning team Jess Hollis and Alan Hoskin in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Room 709 - Jess & Alan".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. House bar. This reception desk is not used now. A small kitchen is at the right".

Images, UC QuakeStudies

Alan Hoskin, a member of the University of Canterbury's E-Learning team, in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Bean bag. Alan wanted the beanbag but Jess said no".

Images, UC QuakeStudies

Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Nick Calvert from the video-conferencing team, Blair and Paul Nicholls behind. Nathan Gardiner with his head in a box".

Images, UC QuakeStudies

Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Looking back along the centre area from the doors. The e-learning advisers and Herbert Thomas, our team leader, sit along the south wall".

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office walking down Lichfield Street towards the intersection of Madras Street. Buildings on either side of the street have been damaged by the earthquake. Plastic fences have been places around piles of rubble on the street as cordons.

Images, Alexander Turnbull Library

Shows a man exhausted after a weekend of watching the All Blacks playing Ireland on TV. His wife understands the frustration of Christchurch residents waiting too long for repairs to properties. Context: Refers to frustrating delays in getting earthquake-related repairs done in Christchurch, this in large part due to slowness of insurance claims and permissions. Quantity: 1 digital cartoon(s).

Images, UC QuakeStudies

A photograph of a car on Gloucester Street which has been crushed by falling bricks from the Canterbury Times and Star building. There is a pile of bricks on the front of the car. A USAR team have spray-painted codes on a plywood board and wedged it into the back of the car.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team walking down Lichfield Street towards the intersection of Madras Street. There is rubble from several earthquake-damaged buildings on both sides of the road. Plastic fences and road cones have been placed on the street as cordons.

Images, UC QuakeStudies

Members of the University of Canterbury's E-Learning team Jess Hollis, Paul Nicholls, Lei Zhang, and Susan Tull in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Moving day - collecting new keys. Lei, Paul, Susan, Jess".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Common area. More offices run along the north wall at the left. Through the doors are the male toilets and a stair well".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Common area. How will we make use of this large open area? Our offices are behind the glass wall, facing south".

Images, UC QuakeStudies

Furniture and equipment packed up ready for the University of Canterbury's E-Learning team's move to their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Waiting for the truck. An empty office, before the removal truck arrived".

Research papers, The University of Auckland Library

As part of the ‘Project Masonry’ Recovery Project funded by the New Zealand Natural Hazards Research Platform, commencing in March 2011, an international team of researchers was deployed to document and interpret the observed earthquake damage to masonry buildings and to churches as a result of the 22nd February 2011 Christchurch earthquake. The study focused on investigating commonly encountered failure patterns and collapse mechanisms. A brief summary of activities undertaken is presented, detailing the observations that were made on the performance of and the deficiencies that contributed to the damage to approximately 650 inspected unreinforced clay brick masonry (URM) buildings, to 90 unreinforced stone masonry buildings, to 342 reinforced concrete masonry (RCM) buildings, to 112 churches in the Canterbury region, and to just under 1100 residential dwellings having external masonry veneer cladding. Also, details are provided of retrofit techniques that were implemented within relevant Christchurch URM buildings prior to the 22nd February earthquake. In addition to presenting a summary of Project Masonry, the broader research activity at the University of Auckland pertaining to the seismic assessment and improvement of unreinforced masonry buildings is outlined. The purpose of this outline is to provide an overview and bibliography of published literature and to communicate on-going research activity that has not yet been reported in a complete form. http://sesoc.org.nz/conference/programme.pdf

Videos, UC QuakeStudies

A video of a presentation by Matthew Pratt during the Resilience and Response Stream of the 2016 People in Disasters Conference. The presentation is titled, "Investing in Connectedness: Building social capital to save lives and aid recovery".The abstract for this presentation reads as follows: Traditionally experts have developed plans to prepare communities for disasters. This presentation discusses the importance of relationship-building and social capital in building resilient communities that are both 'prepared' to respond to disaster events, and 'enabled' to lead their own recovery. As a member of the Canterbury Earthquake Recovery Authority's Community Resilience Team, I will present the work I undertook to catalyse community recovery. I will draw from case studies of initiatives that have built community connectedness, community capacity, and provided new opportunities for social cohesion and neighbourhood planning. I will compare three case studies that highlight how social capital can aid recovery. Investment in relationships is crucial to aid preparedness and recovery.

Images, UC QuakeStudies

Members of the University of Canterbury's E-Learning team Lei Zhang and Jess Hollis in their temporary office in the University Printery building. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Our end of the temporary office; Lei, my desk in the corner, Jess in the other corner (with a window to the admin/reception desk between us), Paul's desk right foreground. (He's home with a cold.)