Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
A photograph of a repaired patch of wall in the stairwell of the Diabetes Centre on Hagley Avenue. The wall is unpainted.
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
In the Know aims to make it faster and easier for Canterbury residents to get information about the residential rebuild and repair process.
Some Christchurch residents fear there's a risk to the region's history if headstones damaged by September's 7.1 magnitude earthquake are not repaired.
A document which specifies the technical requirements for the rehabilitation and repair of pipes using lining methodologies during the SCIRT programme of work.
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
A photograph of a corridor in the Diabetes Centre. Plastic sheeting has been used to cover the carpet while the corridor is repaired.
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work at a house on Hackthorne Road, Cashmere".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Victoria Square, the slightly less famous cousin of nearby Cathedral Square was re-opened today following $7.5 million worth of earthquake repairs.
Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Repairs in progress on this High Street shop; aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Six years after being severely damaged in the 2011 Christchurch earthquake and after two years of repairs, Mona Vale has reopened its doors to the public.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A Christchurch construction firm says businesses who are complaining about losing money on earthquake repair jobs should work more closely with their project managers.
Two years on from the February twenty second earthquake, large parts of Christchurch Hospital are a construction site as repairs to damaged wards continue.
The owners of more than three-thousand properties damaged by the Canterbury earthquake have been told the repair job could take nearly three years.