A zip file containing the suite of SCIRT CAD customisation tools. This file contains:SCIRT CAD LISP routines (198 files)SCIRT CAD dialogue box filesa complete set of layer listsa full set of text files containing the complete list of street names in Christchurchtemplates and lists used for translating 12d outputs to useable dwg reference filesa full set of SCIRT CAD manualsThis file is not sufficient for someone to set up a full SCIRT CAD System, but it will allow a developer to select tools to incorporate with an existing system.

Articles, UC QuakeStudies

A plan which proactively addresses the risk of fraud and lays out the actions that SCIRT will take when any suspected fraud is reported or discovered. The first version of this plan was produced on 12 February 2014.

Articles, UC QuakeStudies

A plan which outlines how timely and accurate information relating to estimating, actual project costs, future commitments and total forecast cost will be managed and reported for each project phase in the programme. The first version of this plan was produced on 24 June 2011.

Articles, UC QuakeStudies

A plan which provides SCIRT with clear direction and guidelines regarding communication in the event of a crisis. The first version of this plan was produced on 1 December 2013. Note that personal details of key personnel have been removed from this document.

Articles, UC QuakeStudies

A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.

Articles, UC QuakeStudies

A plan which defines the framework for performance measurement to align SCIRT with the objectives from the Alliance Agreement objectives. The first version of this plan was produced on 20 August 2011.

Articles, UC QuakeStudies

A plan which describes how SCIRT will manage the coordination of utility authority liaison and utility relocation or protection during the design and construction phases of the rebuild schedule. The first version of this plan was produced on 15 November 2011.

Articles, UC QuakeStudies

A plan which identifies items that will define value for the programme of work and explain processes that will measure the achievement of value outcomes. The first version of this plan was produced on 6 September 2011.

Articles, UC QuakeStudies

A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.