Search

found 452 results

Articles, UC QuakeStudies

A photograph captioned, "After the September earthquake, it was more a simple case of something gets broken and it gets repaired. Then came February, and June as well, and suddenly it's just not so straightforward anymore".

Images, UC QuakeStudies

Workers repairing the James Hight building at the University of Canterbury, seen from inside the library. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. Our area looks over a central roof space that has seating areas. It may be a while before we're allowed out there though".

Images, UC QuakeStudies

A photograph of St John's Anglican Church in Hororata. The spire of the church, which partially collapsed in the 4 September earthquake, has been boarded up in order to protect the building from rain. This photograph was modelled off an image taken by BeckerFraserPhotos in October 2010.

Images, UC QuakeStudies

A photograph of St John's Anglican Church in Hororata. The spire of the church, which partially collapsed in the 4 September earthquake, has been boarded up in order to protect the building from rain. This photograph was modelled off an image taken by BeckerFraserPhotos in October 2010.

Images, UC QuakeStudies

A photograph of the damaged Provincial Council Chambers on Durham Street. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, eqnz.chch.2010

The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.

Images, UC QuakeStudies

A photograph of a badly-damaged building on Manchester Street, which previously housed the Treehouse bar and nightclub. The roof and second storey of the building have been temporarily repaired and the building is fenced off.