Search

found 448 results

Images, UC QuakeStudies

A photograph looking south down Colombo Street towards the badly-damaged ChristChurch Cathedral. Buildings have been fenced off on both sides and there are fallen bricks and rubble on the footpaths.

Images, UC QuakeStudies

A photograph of a man cooking sausages outside the Avonhead Baptist Church for the administrators and technicians from the Department of Civil and Natural Resources Engineering at the University of Canterbury. The students and staff from this department used the church as a base after the 22 February 2011 earthquake, until their building on campus was deemed safe to enter.

Images, UC QuakeStudies

A photograph of the earthquake damage to St Paul's-Trinity-Pacific Church on the corner of Cashel and Madras Streets. Large sections of the church have collapsed and the bricks and other rubble have spilled onto the footpath and street in front. Sections of the scaffolding, constructed up the side of the building before the earthquake, have also collapsed.

Research papers, The University of Auckland Library

As part of the 'Project Masonry' Recovery Project funded by the New Zealand Natural Hazards Research Platform, commencing in March 2011, an international team of researchers was deployed to document and interpret the observed earthquake damage to masonry buildings and to churches as a result of the 22nd February 2011 Christchurch earthquake. The study focused on investigating commonly encountered failure patterns and collapse mechanisms. A brief summary of activities undertaken is presented, detailing the observations that were made on the performance of and the deficiencies that contributed to the damage to approximately 650 inspected unreinforced clay brick masonry (URM) buildings, to 90 unreinforced stone masonry buildings, to 342 reinforced concrete masonry (RCM) buildings, to 112 churches in the Canterbury region, and to just under 1100 residential dwellings having external masonry veneer cladding. In addition, details are provided of retrofit techniques that were implemented within relevant Christchurch URM buildings prior to the 22nd February earthquake and brief suggestions are provided regarding appropriate seismic retrofit and remediation techniques for stone masonry buildings. http://www.nzsee.org.nz/publications/nzsee-quarterly-bulletin/