A promotional flyer which describes the experiences of four For Real recruits.
A document which provides simple, easy to understand environmental advice and guidance for civil construction contractors.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
A document which outlines how to work safely with powered plant and tools, created to discuss with site staff at on-site "toolbox talks".
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Lyttelton area.
A runsheet created for the initial SCIRT and New Zealand Red Cross collaboration workshop.
A document which contains a set of procedures for the "best practice" mark out and recording of subsurface utilities.
A SCIRT pro forma created in May 2014 to reduce the amount of generic information required in a traffic management plan (TMP).
A guideline, created in May 2014, to show TMP (traffic management plan) planners how to use the SCIRT proforma.
A plan which defines the strategy underlying the SCIRT rebuild programme.
An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.
A copy of the award application which SCIRT, the Christchurch City Council, Environment Canterbury and Beca submitted for the New Zealand Planning Institute Best Practice Award in February 2013.
A document containing a screenshot of the External Information Request form.
A pdf copy of the SCIRT Learning Legacy Story, "ProjectCentre: Central approach to projects".
A document which describes SCIRT's Geographic Information System (GIS) Viewer.
A copy of the award application for the New Zealand Engineering Excellence Awards 2013.
A technical guideline which defines SCIRT Delivery Team requirements for as-built field surveying and attribute information.
This document contains a list of the SCIRT GIS services, along with a brief description of what the groupings of layers were and why they were needed.
An early presentation which summarises SCIRT's commercial model in a simple way.
A document which contains a catalogue of all requests made to the SCIRT GIS team.
This document describes the tool developed for capturing the abandoned and removed assets using the SCIRT GIS viewer.
A presentation which was given as part of the FME Desktop World Tour in 2015 in Christchurch.
A document which explains how to use the SCIRT GIS Viewer.
A presentation prepared for the 2016 New Zealand Spatial Excellence Awards: Category: Award for Technical Excellence.
A document which describes SCIRT's approach to creating business systems to aid the rebuild of horizontal infrastructure.
A plan which outlines the processes and IT applications and services required to manage the SCIRT programme. The first version of this plan was produced on 9 August 2011.
A flowchart which illustrates the Iform and Collector application data flows.
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
A document which describes the SCIRT estimates process and outcomes.
An extract from SCIRT's Alliance Agreement, detailing the terms of compensation.