A photograph of a earthquake-damaged building on Moorhouse Avenue. The front gable of the building has crumbled, exposing the inside.
Unreinforced masonry (URM) buildings have repeatedly been shown to perform poorly in large magnitude earthquakes, with both New Zealand and Australia having a history of past earthquakes that have resulted in fatalities due to collapsed URM buildings. A comparison is presented here of the URM building stock and the seismic vulnerability of Christchurch and Adelaide in order to demonstrate the relevance to Australian cities of observations in Christchurch resulting from the 2010/2011 Canterbury earthquake swarm. It is shown that the materials, architecture and hence earthquake strength of URM buildings in both countries is comparable and that Adelaide and other cities of Australia have seismic vulnerability sufficient to cause major damage to their URM buildings should a design level earthquake occur. Such an earthquake is expected to cause major building damage, and fatalities should be expected.
Disaster recovery is significantly affected by funding availability. The timeliness and quality of recovery activities are not only impacted by the extent of the funding but also the mechanisms with which funding is prioritised, allocated and delivered. This research addresses the impact of funding mechanisms on the effectiveness and efficiency of post-disaster demolition and debris management programmes. A qualitative assessment of the impacts on recovery of different funding sources and mechanisms was carried out, using the 2010 Canterbury Earthquake as well as other recent international events as case studies. The impacts assessed include: timeliness, completeness, environmental, economic and social impacts. Of the case studies investigated, the Canterbury Earthquake was the only disaster response to rely solely on a privatised approach to insurance for debris management. Due to the low level of resident displacement and low level of hazard in the waste, this was a satisfactory approach, though not ideal. This approach has led to greater organisational complexity and delays. For many other events, the potential community wide impacts caused by the prolonged presence of disaster debris means that publicly funded and centrally facilitated programmes appear to be the most common and effective method of managing disaster waste.
A photograph of a toppled filing cabinet in an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury, after the 4 September 2010 earthquake.
The Canterbury earthquakes of 2010 and 2011 caused significant damage and disruption to the city of Christchurch, New Zealand. A Royal Commission was established to report on the causes of building failure as a result of the earthquakes as well as look at the legal and best-practice requirements for buildings in New Zealand Central Business Districts. The Royal Commission made 189 recommendations on a variety of matters including managing damaged buildings after an earthquake, the adequacy of building codes and standards, and the processes of seismic assessments of existing buildings to determine their earthquake vulnerability. In response the Ministry of Business, Innovation and Employment, the agency responsible for administering building regulation in New Zealand, established a work programme to assist with the Canterbury rebuild and to implement the lessons learned throughout New Zealand. The five primary work streams in the programme are: • Facilitating the Canterbury Rebuild • Structural Performance and Design Standards • Geotechnical and structural guidance • Existing Building Resilience • Post Disaster Building Management This paper provides more detail on each of the work streams. There has been significant collaboration between the New Zealand Government and the research community, technical societies, and engineering consultants, both within New Zealand and internationally, to deliver the programme and improve the resilience of the New Zealand built environment. This has presented major challenges for an extremely busy industry in the aftermath of the Canterbury earthquakes. The paper identifies the items of work that have been completed and the work that is still in progress at the time of writing.
A photograph of workers in a crane-raise platform removing bricks from the earthquake-damaged Christchurch Chinese Methodist Church on Papanui Road.
A photograph of a section of road on the Greendale Fault line with large cracks caused by the 4 September 2010 earthquake.
A photograph of a section of road on the Greendale Fault line with large cracks caused by the 4 September 2010 earthquake.
A photograph of workers in a crane-raise platform removing bricks from the earthquake-damaged Christchurch Chinese Methodist Church on Papanui Road.
A photograph of the Greendale Fault line, now visible across a paddock due to cracks caused by the 4 September 2010 earthquake.
A photograph of the Greendale Fault line, now visible across a paddock due to cracks caused by the 4 September 2010 earthquake.
A photograph of a projector set up in the Avonhead Baptist Church. The room is to be used as a temporary lecture theatre for the Department of Civil and Natural Resources Engineering, as lecture theatres on campus are inaccessible following the 22 February 2011 earthquake.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A pdf copy of a PowerPoint presentation prepared for the Australia New Zealand Geotechnical Engineering Conference.
Glazing systems are non-structural elements in a building that, more often than not, appear to be given little consideration in seismic design. Recent experimental work into glazing systems at the University of Canterbury, however, has shown that glazing systems can be very susceptible to serviceability damage, defined as loss of water-tightness. The focus of this paper is to highlight the difference in vulnerability of standard and seismic glazing systems and consider the implications of this for future repair costs and losses. The paper first describes the damage states chosen for glazing units according to the repair strategies required and expected repair costs. This includes three damage states: DS1: Water Leakage, DS2: Gasket Failure and DS3: Frame/Glass Failure. Implementing modern performance-based earthquake engineering, the paper proceeds to highlight a case study comparing costs and expected losses of a standard glazing unit and a seismic glazing unit installed on a case study building. It is shown that the use of seismic glazing units is generally beneficial over time, due to the early onset of serviceability damage in standard glazing units. Finally, the paper provides suggestions for designers aimed at reducing costs related to earthquake induced repairs of glazing.
This paper investigates the effects of variability in source rupture parameters on site-specific physics-based simulated ground motions, ascertained through the systematic analysis of ground motion intensity measures. As a preliminary study, we consider simulations of the 22 February 2011 Christchurch earthquake using the Graves and Pitarka (2015) methodology. The effects of source variability are considered via a sensitivity study in which parameters (hypocentre location, earthquake magnitude, average rupture velocity, fault geometry and the Brune stress parameter) are individually varied by one standard deviation. The sensitivity of simulated ground motion intensity measures are subsequently compared against observational data. The preliminary results from this study indicate that uncertainty in the stress parameter and the rupture velocity have the most significant effect on the high frequency amplitudes. Conversely, magnitude uncertainty was found to be most influential on the spectral acceleration amplitudes at low frequencies. Further work is required to extend this preliminary study to exhaustively consider more events and to include parameter covariance. The ultimate results of this research will assist in the validation of the overall simulation method’s accuracy in capturing various rupture parameters, which is essential for the use of simulated ground motion models in probabilistic seismic hazard analysis.
Seismic behaviour of typical unreinforced masonry (URM) brick houses, that were common in early last century in New Zealand and still common in many developing countries, is experimentally investigated at University of Canterbury, New Zealand in this research. A one halfscale model URM house is constructed and tested under earthquake ground motions on a shaking table. The model structure with aspect ratio of 1.5:1 in plan was initially tested in the longitudinal direction for several earthquakes with peak ground acceleration (PGA) up to 0.5g. Toppling of end gables (above the eaves line) and minor to moderate cracking around window and door piers was observed in this phase. The structure was then rotated 90º and tested in the transverse (short) direction for ground motions with PGA up to 0.8g. Partial out-of-plane failure of the face loaded walls in the second storey and global rocking of the model was observed in this phase. A finite element analysis and a mechanism analysis are conducted to assess the dynamic properties and lateral strength of the model house. Seismic fragility function of URM houses is developed based on the experimental results. Damping at different phases of the response is estimated using an amplitude dependent equivalent viscous damping model. Financial risk of similar URM houses is then estimated in term of expected annual loss (EAL) following a probabilistic financial risk assessment framework. Risks posed by different levels of damage and by earthquakes of different frequencies are then examined.