A plan which describes how SCIRT is to carry out construction works. The first version of this plan was produced on 10 August 2011.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document which describes SCIRT's approach to ensuring zero harm during its five and a half year programme of work.
A video of a CTV News broadcast of a Ministry of Women's Affairs initiative to attract more women into trades and construction related jobs.
A pdf copy of a presentation which SCIRT presented to Red Cross volunteers, telling them about what SCIRT is and what it does.
An example of a paper which explains the role of an Asset Owner's Representative - Transport Structures at SCIRT.
An example of a paper which explains the role of an Asset Owner's Representative - Water Supply at SCIRT.
A guideline which defined what is and isn't 'on job training', with the purpose of encouraging more 'on job training'.
A guideline which defined the process and ownership of templates used by the design team and the management of the design team electronic library.
A plan which details how SCIRT managed its construction work and ensured a consistent best-practice approach across the approximately 700 projects in the rebuild programme.
A plan which describes how SCIRT will carry out design work. The first version of this plan was produced on 1 September 2011.
A plan which outlines SCIRT's approach to Human Resource Management. The first version of this plan was produced on 30 August 2011.
A photograph taken in 2013, showing one of the 32 large 'Open for Business' signs placed on all of the main routes into the CBD.
A poster which was prepared to go with the award application for the Canterbury Heritage Awards 2016.
A guideline, created in May 2014, to show TMP (traffic management plan) planners how to use the SCIRT proforma.
This document describes the tool developed for capturing the abandoned and removed assets using the SCIRT GIS viewer.
A presentation prepared for the 2016 New Zealand Spatial Excellence Awards: Category: Award for Technical Excellence.
An example of a paper which explains the role of an Asset Owner's Representative - Three Waters at SCIRT.
A document describing the use of 3D modelling for construction methodology.
A document which describes the process that SCIRT took to repair the Sumner Road retaining wall - stage 4.
A guideline to inform designers of the pipe profilometer operation, including requesting profile surveys, standards and assessments of the survey results.
A photograph of the rubble of the Observatory tower in the South Quad of the Christchurch Arts Centre. The tower collapsed during the 22 February 2011 earthquake. Scaffolding constructed around the tower has also collapsed and is amongst the rubble.
A close-up photograph of parts of the Townsend Telescope recovered from the rubble of the Observatory tower. The telescope was housed in the tower at the Christchurch Arts Centre. It was severely damaged when the tower collapsed during the 22 February 2011 earthquake.
A photograph of the Townsend Telescope in the Observatory at the Christchurch Arts Centre. This image was used by Graeme Kershaw, Technician at the University of Canterbury Department of Physics and Astronomy, to identify the telescope's parts after the 22 February 2011 earthquake.
A photograph of the Townsend Telescope in the Observatory at the Christchurch Arts Centre. This image was used by Graeme Kershaw, Technician at the University of Canterbury Department of Physics and Astronomy, to identify the telescope's parts after the 22 February 2011 earthquake.
A photograph of the bottom storey of the Observatory tower at the Christchurch Arts Centre. Rubble from the top two storeys of the tower has spilled into the courtyard in front of the tower. A digger was used to clear the rubble away from the building.
A photograph of the earthquake damage to the second story of the Observatory tower at the Christchurch Arts Centre. The front of the storey has collapsed, exposing the inside. A tarpaulin has been draped over the top and the roof of the building behind.
A document which details the agreement in September 2013 between the Government and the Christchurch City Council over governance of the horizontal infrastructure rebuild.
A manual which informs SCIRT AutoCAD users of all tools, utilities, keyboard shortcuts, and tips available within the SCIRT CAD System.
A detailed presentation prepared by SCIRT IST's commercial manager to inform Delivery Team commercial managers about the processes and requirements relating to SCIRT's commercial model.