A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
An entry from Roz Johnson's blog for 13 October 2012 entitled, "Moving both feet off the ground".
A photograph captioned by Paul Corliss, "Porritt Park".
A photograph captioned by Paul Corliss, "Porritt Park".
This paper examines the consistency of seismicity and ground motion models, used for seismic hazard analysis in New Zealand, with the observations in the Canterbury earthquakes. An overview is first given of seismicity and ground motion modelling as inputs of probabilistic seismic hazard analysis, whose results form the basis for elastic response spectra in NZS1170.5:2004. The magnitude of earthquakes in the Canterbury earthquake sequence are adequately allowed for in the current NZ seismicity model, however the consideration of ‘background’ earthquakes as point sources at a minimum depth of 10km results in up to a 60% underestimation of the ground motions that such events produce. The ground motion model used in conventional NZ seismic hazard analysis is shown to provide biased predictions of response spectra (over-prediction near T=0.2s , and under-predictions at moderate-to-large vibration periods). Improved ground motion prediction can be achieved using more recent NZ-specific models.
This paper provides an overview of the salient aspects of the dense array of ground motions observed in the 4 September 2010 Darfield and 22 February 2011 Christchurch earthquakes. Particular attention is given to inferred physical reasons for the observed ground motions, which include: (i) source features such as forward directivity effects; (ii) The effects of the Canterbury Plains sedimentary basin on basin-generated surface waves, and waveguide effects through the region; and (iii) the importance of local site response as evidenced by observations of large long period amplification and liquefaction. The significance of vertical ground motion intensity is also examined.
A photograph of a colourful brick wall and a spiral pattern on the ground at New Brighton Mall. There is also a red and black rug rolled up and laid down on the ground.
A badly damaged house in Burwood. Parts of the house have moved in different directions, leaving walls and doors misaligned. The photographer comments, "Although this looks like an extreme wide angle shot it is actually a house tilted in every direction at the same time. The earthquake caused the ground to vibrate and compress so much that the sandy soil liquefied and caused the ground to collapse under this modern home".
The ground of The Pump House in Linwood.
The magnitude Mw 6.2 earthquake of February 22nd 2011 that struck beneath the city of Christchurch, New Zealand, caused widespread damage and was particularly destructive to the Central Business District (CBD). The shaking caused major damage, including collapses of structures, and initiated ground failure in the form of soil liquefaction and consequent effects such as sand boils, surface flooding, large differential settlements of buildings and lateral spreading of ground towards rivers were observed. A research project underway at the University of Canterbury to characterise the engineering behaviour of the soils in the region was influenced by this event to focus on the performance of the highly variable ground conditions in the CBD. This paper outlines the methodology of this research to characterise the key soil horizons that underlie the CBD that influenced the performance of important structures during the recent earthquakes, and will influence the performance of the rebuilt city centre under future events. The methodology follows post-earthquake reconnaissance in the central city, a desk study on ground conditions, site selection, mobilisation of a post-earthquake ground investigation incorporating the cone penetration test (CPT), borehole drilling, shear wave velocity profiling and Gel-push sampling followed by a programme of laboratory testing including monotonic and cyclic testing of the soils obtained in the investigation. The research is timely and aims to inform the impending rebuild, with appropriate information on the soils response to dynamic loading, and the influence this has on the performance of structures with various foundation forms.
A preliminary case study assessing the seismic sustainability of two reinforced concrete structures, a frame structure and a wall structure, was conducted to determine which structural system is more seismically sustainable. The two structures were designed to the same standards and were assumed to be located in Christchurch, New Zealand. A component-based probabilistic seismic loss assessment, considering direct losses only, was conducted for two ground motion records, regarded to approximately represent a 1 in 500 year earthquake event and a 1 in 2500 year earthquake event, respectively. It is shown that the wall structure results in lower direct losses than the frame structure in the less severe ground motion scenario. However, in the more severe ground motion scenario, the frame structure results in lower direct losses. Hence, this study demonstrates that which structural system has the lower direct losses depends on the ground motion intensity level.
Building emediation equipment on the ground of The Pump House in Linwood.
Parts of diggers lying on ground of The Pump House in Linwood.
The Lyttelton Petanque Club, a Gap Filler project in the empty site of the Ground Culinary Centre.
Diggers on a demolition site on Kilmore Street. One is drilling into the ground.
A construction site where some ground foundation has been laid down. In the background is a damaged brick property.
The ground of The Pump House in Linwood. A pile of brick sits next to the damage brick wall.
This paper provides a comparison between the strong ground motions observed in the Christchurch central business district in the 4 September 2010 Mw7.1 Darfield, and 22 February 2011 Mw6.3 Christchurch earthquakes with those observed in Tokyo during the 11 March 2011 Mw9.0 Tohoku earthquake. Despite Tokyo being located approximately 110km from the nearest part of the causative rupture, the ground motions observed from the Tohoku earthquake were strong enough to cause structural damage in Tokyo and also significant liquefaction to loose reclaimed soils in Tokyo bay. Comparisons include the strong motion time histories, response spectra, significant durations and arias intensity. The implications for large earthquakes in New Zealand are also briefly discussed.
The Lyttelton Community Garden in next to the Lyttelton Petanque Club, a Gap Filler project in the empty site of the Ground Culinary Centre.
A photograph of the badly-damaged Odeon Theatre. A large pile of bricks covers the ground beside the wall.
A photograph of the badly-damaged Odeon Theatre. A large pile of bricks covers the ground beside the wall.