An interview with LT Michael Clulow, 2nd Engineer Regiment, about the New Zealand Army engineers turning New Brighton sea water into fresh water for local residents.
A video about the New Zealand Army's engineers working with the Christchurch City Council and community centres to secure buildings in Christchurch, set up bases in Latimer Square, and fix infrastructure such as Burwood Hospital's water supply.
A photograph captioned by BeckerFraserPhotos, "A group of engineers in New Regent Street".
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
New Zealand Army Engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
New Zealand Army Engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
New Zealand Army Engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
New Zealand Army Engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
Structural engineers inspecting the Warners Novotel, Cathedral Square.
Structural Engineers from the New Zealand and Los Angeles County Fire Department Urban Search and Rescue teams outside the Kenton Chambers Building on Hereford Street.
Recent earthquakes have shown that liquefaction and associated ground deformations are major geotechnical hazards to civil engineering infrastructures, such as pipelines. In particular, sewer pipes have been damaged in many areas in Christchurch as a result of liquefaction-induced lateral spreading near waterways and ground oscillation induced by seismic shaking. In this paper, the addition of a flexible AM liner as a potential countermeasure to increase sewer pipe capacity was investigated. Physical testing through 4-point loading test was undertaken to characterise material properties and the response of both unlined pipe and its lined counterpart. Next, numerical models were created using SAP2000 and ABAQUS to analyse buried pipeline response to transverse permanent ground displacement and to quantify, over a range of pipe segment lengths and soil parameters, the effectiveness of the AM liner in increasing displacement capacity. The numerical results suggest that the addition of the AM liner increases the deformation capacity of the unlined sewer pipe by as much as 50 times. The results confirmed that AM liner is an effective countermeasure for sewer pipes in liquefied ground not only in terms of increased deformation capacity but also the fact that AM-Liner can prevent influx of sand and water through broken pipes, making sewer pipes with liner remaining serviceable even under severe liquefaction condition.
Structural Engineers from the New Zealand and Los Angeles County Fire Department Urban Search and Rescue teams performing an assessment of the Kenton Chambers Building on Hereford Street.
Structural Engineers from the New Zealand and Los Angeles County Fire Department Urban Search and Rescue teams performing an assessment of the Kenton Chambers Building on Hereford Street.
Structural Engineers from the New Zealand and Los Angeles County Fire Department Urban Search and Rescue teams performing assessments of buildings on High Street near Manchester Street.
Structural engineers taking a break on the roof of the Warners Hotel, Cathedral Square.
A photograph of concerned members of the public looking up at the Hotel Grand Chancellor, shortly after the 22 February 2011 earthquake. Many of the people in the crowd are structural engineers from all over the world who travelled to Christhcurch for an earthquake workshop. The workshop was just about to begin when the 22 February 2011 earthquake hit.
A photograph of concerned members of the public looking up at the Hotel Grand Chancellor, shortly after the 22 February 2011 earthquake. Many of the people in the crowd are structural engineers from all over the world who travelled to Christhcurch for an earthquake workshop. The workshop was just about to begin when the 22 February 2011 earthquake hit.
An image from a Army News March 2011 article titled, "Sappers Show Their Expertise in a City Under Siege". The image shows New Zealand Army engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
An image from a Army News March 2011 article titled, "Sappers Show Their Expertise in a City Under Siege". The image shows New Zealand Army engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
An image from a Army News March 2011 article titled, "Sappers Show Their Expertise in a City Under Siege". The image shows New Zealand Army engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
A magazine article which outlines the observations of engineers working on SCIRT retaining wall and ground improvement projects.
Following the devastating 1931 Hawke's Bay earthquake, buildings in Napier and surrounding areas in the Hawke's Bay region were rebuilt in a comparatively homogenous structural and architectural style comprising the region's famous Art Deco stock. These interwar buildings are most often composed of reinforced concrete two-way space frames, and although they have comparatively ductile detailing for their date of construction, are often expected to be brittle, earthquake-prone buildings in preliminary seismic assessments. Furthermore, the likelihood of global collapse of an RC building during a design-level earthquake became an issue warranting particular attention following the collapse of multiple RC buildings in the February 22, 2011 Christchurch earthquake. Those who value the architectural heritage and future use of these iconic Art Deco buildings - including building owners, tenants, and city officials, among others - must consider how they can be best preserved and utilized functionally given the especially pressing implications of relevant safety, regulatory, and economic factors. This study was intended to provide information on the seismic hazard, geometric weaknesses, collapse hazards, material properties, structural detailing, empirically based vulnerability, and recommended analysis approaches particular to Art Deco buildings in Hawke's Bay as a resource for professional structural engineers tasked with seismic assessments and retrofit designs for these buildings. The observed satisfactory performance of similar low-rise, ostensibly brittle RC buildings in other earthquakes and the examination of the structural redundancy and expected column drift capacities in these buildings, led to the conclusion that the seismic capacity of these buildings is generally underrated in simple, force-based assessments.
As part of a seismic retrofit scheme, surface bonded glass fiber-reinforced polymer (GFRP) fabric was applied to two unreinforced masonry (URM) buildings located in Christchurch, New Zealand. The unreinforced stone masonry of Christchurch Girls’ High School (GHS) and the unreinforced clay brick masonry Shirley Community Centre were retrofitted using surface bonded GFRP in 2007 and 2009, respectively. Much of the knowledge on the seismic performance of GFRP retrofitted URM was previously assimilated from laboratory-based experimental studies with controlled environments and loading schemes. The 2010/2011 Canterbury earthquake sequence provided a rare opportunity to evaluate the GFRP retrofit applied to two vintage URM buildings and to document its performance when subjected to actual design-level earthquake-induced shaking. Both GFRP retrofits were found to be successful in preserving architectural features within the buildings as well as maintaining the structural integrity of the URM walls. Successful seismic performance was based on comparisons made between the GFRP retrofitted GHS building and the adjacent nonretrofitted Boys’ High School building, as well as on a comparison between the GFRP retrofitted and nonretrofitted walls of the Shirley Community Centre building. Based on detailed postearthquake observations and investigations, the GFRP retrofitted URM walls in the subject buildings exhibited negligible to minor levels of damage without delamination, whereas significant damage was observed in comparable nonretrofitted URM walls. AM - Accepted Manuscript
Seismic retrofitting of unreinforced masonry buildings using posttensioning has been the topic of many recent experimental research projects. However, the performance of such retrofit designs in actual design level earthquakes has previously been poorly documented. In 1984 two stone masonry buildings within The Arts Centre of Christchurch received posttensioned seismic retrofits, which were subsequently subjected to design level seismic loads during the 2010/2011 Canterbury earthquake sequence. These 26 year old retrofits were part of a global scheme to strengthen and secure the historic building complex and were subject to considerable budgetary constraints. Given the limited resources available at the time of construction and the current degraded state of the steel posttension tendons, the posttensioned retrofits performed well in preventing major damage to the overall structure of the two buildings in the Canterbury earthquakes. When compared to other similar unretrofitted structures within The Arts Centre, it is demonstrated that the posttensioning significantly improved the in-plane and out-of-plane wall strength and the ability to limit residual wall displacements. The history of The Arts Centre buildings and the details of the Canterbury earthquakes is discussed, followed by examination of the performance of the posttension retrofits and the suitability of this technique for future retrofitting of other historic unreinforced masonry buildings. http://www.aees.org.au/downloads/conference-papers/
Ingham and Biggs were in Christchurch during the M6.3, 22 February 2011 earthquake and Moon arrived the next day. They were enlisted by officials to provide rapid assessment of buildings within the Central Business District (CBD). In addition, they were asked to: 1) provide a rapid assessment of the numbers and types of buildings that had been damaged, and 2) identify indicator buildings that represent classes of structures that can be used to monitor changing conditions for each class following continuing aftershocks and subsequent damage. This paper explains how transect methodology was incorporated into the rapid damage assessment that was performed 48 hours after the earthquake. Approximately 300 buildings were assessed using exterior Level 1 reporting techniques. That data was used to draw conclusions on the condition of the entire CBD of approximately 4400 buildings. In the context of a disaster investigation, a transect involves traveling a selected path assessing the condition of the buildings and documenting the class of each building, and using the results in conjunction with prior knowledge relating to the overall population of buildings affected in the area of the study. Read More: http://ascelibrary.org/doi/abs/10.1061/9780784412640.033
The performance of retrofitted unreinforced masonry (URM) bearing wall buildings in Christchurch is examined, considering ground motion recordings from multiple events. Suggestions for how the experiences in Christchurch might be relevant to retrofit practices common to New Zealand, U.S. and Canada are also provided. Whilst the poor performance of unretrofitted URM buildings in earthquakes is well known, much less is known about how retrofitted URM buildings perform when subjected to strong ground shaking.
A photograph of Luis Castillo, structural engineer for Aurecon, giving a speech at the Pallet Pavilion as part of FESTA 2013.
A sign next to the entranceway to the Wunderbar on London Street. The sign reads, "Engineers report due, do not demo".
A photograph of Luis Castillo, structural engineer for Aurecon, giving a speech at the Pallet Pavilion as part of FESTA 2013.
A photograph of structural engineers taking a lunch break outside the temporary Civil Defence headquarters at the Christchurch Art Gallery on Montreal Street.