An earthquake community group in Canterbury says a damning report on the ineffectiveness of the Earthquake Commission highlights the frustration of getting information on their own homes.
Detail of damage to the Odeon Theatre.
Detail of damage to the Odeon Theatre.
A photograph of a detail of a mural by Tess Sheerin.
A photograph of a detail of a mural by Tess Sheerin.
A photograph of a detail of a mural by Tess Sheerin.
A photograph of an artwork detail of an All Right? poster. The artwork detail is from the poster which usually reads, "Tried something a little different lately?" The poster is part of a set of advertisements which asks a question of the viewer, related to their mental health and wellbeing.
A plan which details how in 2013 SCIRT planned to engage its workforce in training.
A document which details the structure, roles and terms of reference for the Client Governance Group (CGG).
A photograph of an architectural detail above a window of Donna Allfrey's house at 406 Oxford Terrace.
Blog from Christchurch business-owner Nicky Arts detailing the rebuild of the Christchurch CBD following the earthquakles of 2010 and 2011.
The Earthquake Commission has been granted an interim injunction stopping a blogger sharing details from a leaked email with Canterbury home owners.
A photograph of a sign giving details of road closures. The photograph is captioned by Paul Corliss, "Corner Kilmore and Durham Streets".
A photograph of a detail of Mike Hewson's artwork, 'Government Life Suspension', on the side of the former Chancery Arcade.
In a serious privacy breach - the addresses and earthquake claim details of almost ten thousand Canterbury people have been mistakenly emailed by Earthquake Commission to the wrong person.
The man who received Earthquake Commission files detailing claims by 83,000 Christchurch people says he's appalled the slip-up has become a political football.
A photograph of detail of the McKenzie & Willis building. The photograph is captioned by Paul Corliss, "Tuam Street and High Street shops, CBD. By Alice's".
The Earthquake Commission has been forced into an embarrassing admission that the details of all 83-thousand clients in its Canterbury Home Repair programme have been accidentally emailed to the wrong address.
An example of the five year rebuild schedule map created as part of the prioritisation process detailing where and when construction would start. The data behind this map was updated every quarter.
A document which details the agreement in September 2013 between the Government and the Christchurch City Council over governance of the horizontal infrastructure rebuild.
The Earthquake Commission has admitted its privacy breach was almost 10 times worse than it had said, with the details of all 83-thousand clients in its Canterbury Home Repair programme being emailed out.
The Earthquake Commission has admitted the details of all 83-thousand clients in its Canterbury Home Repair programme have been accidentally emailed to the wrong place, not just the almost 10 thousand it said on Friday
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A photograph of a detail of one of the large-scale puppets created by Free Theatre Christchurch for Canterbury Tales. A toothbrush, toothpaste, and other household items are held in pockets, sewn onto netting fabric. Canterbury Tales was the main event of FESTA 2013.
A photograph of a detail of one of the large-scale puppets created by Free Theatre Christchurch for Canterbury Tales. A fork, spoon, lighter, and other household items are held in pockets, sewn onto netting fabric. Canterbury Tales was the main event of FESTA 2013.
A photograph of an artwork detail of an All Right? poster. The close-up depicts two 'All Righties' and is part of a set of advertisements which asks a question of the viewer, related to their mental health and wellbeing.
According to the sign it can take about 30 minutes to walk from the entry point (near the small statue) to the centre and out again. What you can do with a few thousand old bricks and gravel. See next photo for more detail.
Following the 2010/2011 Canterbury, New Zealand earthquakes, a detailed door-to-door survey was conducted in the Christchurch region to establish the earthquake performance of lightweight timber-framed residential dwellings with a masonry veneer external cladding system. The post-earthquake survey involved documenting the condition of dwellings in areas that had experienced different levels of earthquake shaking, allowing comparison between the performance of different veneer systems and different shaking intensities. In total, just fewer than 1,100 residential dwellings were inspected throughout the wider Christchurch area. The survey included parameters such as level of veneer damage, type of veneer damage, observed crack widths, and level of repair required. It is concluded that based on observed earthquake performance at the shaking intensities matching or exceeding ultimate limit state loading, the post-1996 veneer fixing details performed satisfactorily and continued use of the detail is recommended without further modification. AM - Accepted Manuscript
The Canterbury earthquake series of 2010/2011 has turned the city of Christchurch into a full scale natural laboratory testing the structural and non-structural response of buildings under moderate to very severe earthquake shaking. The lessons learned from this, which have come at great cost socially and economically, are extremely valuable in increasing our understanding of whole building performance in severe earthquakes. Given current initiatives underway on both sides of the Tasman towards developing joint Australasian steel and composite steel/concrete design and construction standards that would span a very wide range of geological conditions and seismic zones, these lessons are relevant to both countries. This paper focusses on the performance of steel framed buildings in Christchurch city, with greatest emphasis on multi-storey buildings, but also covering single storey steel framed buildings and light steel framed housing. It addresses such issues as the magnitude and structural impact of the earthquake series, importance of good detailing, lack of observed column base hinging, the excellent performance of composite floors and it will briefly cover research underway to quantify some of these effects for use in design.
Seismic retrofitting of unreinforced masonry buildings using posttensioning has been the topic of many recent experimental research projects. However, the performance of such retrofit designs in actual design level earthquakes has previously been poorly documented. In 1984 two stone masonry buildings within The Arts Centre of Christchurch received posttensioned seismic retrofits, which were subsequently subjected to design level seismic loads during the 2010/2011 Canterbury earthquake sequence. These 26 year old retrofits were part of a global scheme to strengthen and secure the historic building complex and were subject to considerable budgetary constraints. Given the limited resources available at the time of construction and the current degraded state of the steel posttension tendons, the posttensioned retrofits performed well in preventing major damage to the overall structure of the two buildings in the Canterbury earthquakes. When compared to other similar unretrofitted structures within The Arts Centre, it is demonstrated that the posttensioning significantly improved the in-plane and out-of-plane wall strength and the ability to limit residual wall displacements. The history of The Arts Centre buildings and the details of the Canterbury earthquakes is discussed, followed by examination of the performance of the posttension retrofits and the suitability of this technique for future retrofitting of other historic unreinforced masonry buildings. http://www.aees.org.au/downloads/conference-papers/2013-2/