The Forsyth Barr building has stood silent and empty (except the occasional intruder and pigeons) since the February 2011 earthquake. It was sold "as is" and I understand that it is now going to be fitted out as a hotel. This is the building that had severe stairwell damage during the quake necessitating people being lowered via ropes etc on t...
A section of retaining wall that tilted in the Christchurch 2011 earthquake. At the Edmunds Band Rotunda sight. Still not repaired,
Pigeons sit on the remains of one of the tallest buildings in Christchurch that was 95% demolished two or three years ago. The basement (now filled with water) and the columns remain. Demolished due to damage from the Christchurch 2011 earthquake.
One of the most beautiful pieces of wall art (added to the blank walls after buildings were demolished following the earthquakes) in Christchurch, is now being hidden by a new building in front of it. www.flickr.com/photos/johnstewartnz/15499321681/in/...
The South New Brighton jetty has been closed for 3 or 4 years (fenced off) then the fence was removed and it was "open", but nothing has happened to it since the earthquakes, but it is closed again now, although it looks like a home made sign!
Porritt Park was, before the earthquakes, the headquarters of hockey in this region. Two astro-turf fields (the main one was to the left of the building), and corporate offices etc. The earthquakes buckled all the playing surfaces and damaged the buildings; a couple of smaller ones have been removed. Hockey shifted the other side of the cit...
20160419_7732_7D2-400 The City is in Rebuild phase (110/366) A totally different view to a few years ago. Most of the tall buildings have gone and construction is underway on a lot of new buildings, View from across the Estuary in Redcliffs. A couple of days ago the government agency controlling the post-earthquake work (CERA - Canterbury Ea...
Porritt Park was, before the earthquakes, the headquarters of hockey in this region. Two astro-turf fields (the main one was other side of the building), and corporate offices etc. The earthquakes buckled all the playing surfaces and damaged the buildings; a couple of smaller ones have been removed. Hockey shifted the other side of the city t...
Six ½ years after the earthquakes there are still a few demolitions taking place. This one is a block of council owned flats. Whether the whole complex is being demolished or not I don't know., but here the centre block of three is being demolished. The green grass is what was sections and houses demolished in 2012-2015 as it is too close to t...
Page 7 of Section D of the Christchurch Press, published on Saturday 7 May 2011.
Page 7 of Section D of the Christchurch Press, published on Saturday 7 December 2013.
Page 7 of Section D of the Christchurch Press, published on Wednesday 7 September 2011.
Page 7 of Section D of the Christchurch Press, published on Wednesday 7 December 2011.
Page 7 of Section D of the Christchurch Press, published on Wednesday 7 November 2012.
Page 7 of Section D of the Christchurch Press, published on Saturday 7 April 2012.
Page 7 of Section D of the Christchurch Press, published on Wednesday 7 March 2012.
Dominion Post 22-Feb-2012 section: D, page 7
Today was the first time I have been to the earthquake memorial since it was completed and opened on 22nd February 2017, six years after the devastating quake that killed the 185 that are named on this wall. I knew two of the people on the list.
Page 7 of Section D of the Christchurch Press, published on Wednesday 29 September 2010.
Page 7 of Section D of the Christchurch Press, published on Wednesday 8 December 2010.
Page 7 of Section D of the Christchurch Press, published on Saturday 18 October 2014.
Page 7 of Section D of the Christchurch Press, published on Wednesday 15 December 2010.
Page 7 of Section D of the Christchurch Press, published on Saturday 15 March 2014.
Page 7 of Section D of the Christchurch Press, published on Wednesday 12 March 2014.
Page 7 of section D of the Christchurch Press, published on Wednesday 22 September 2010.
Page 7 of Section D of the Christchurch Press, published on Saturday 18 September 2010.
Page 4 of Section D of the Christchurch Press, published on Saturday 7 January 2012.
Page 7 of Section D of the Christchurch Press, published on Saturday 19 November 2011.
Page 7 of Section D of the Christchurch Press, published on Wednesday 16 April 2014.
Page 7 of Section D of the Christchurch Press, published on Wednesday 2 April 2014.