Search

found 2008 results

Articles, UC QuakeStudies

A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Reception. This is where students used to come to enquire about support services".

Images, UC QuakeStudies

Internal damage to a house in Richmond. A doorframe has visibly warped, leaving a gap between the frame and the door. Outside, cracks can be seen in the concrete patio. The photographer comments, "Sunroom - bifold doors are now separated from the frame. The doors on the left blew right out in a strong wind 2 weeks after the quake".

Images, UC QuakeStudies

Internal damage to a house in Richmond. A large crack in the wallboard below a window has exposed the bricks, and the skirting board has moved away from the floor. The photographer comments, "Cracks in the wall of the sunroom. This is the interior view of the crack in the previous shot".