The Hotel Grand Chancellor, badly damaged after the 22nd of February quake. Lean is visible on the left side.
Army personnel guarding cordon checkpoint on Manchester Street. Sign reads "No public access past this point! Please stay off the road".
Demolition of a building on the corner of Chester and Madras Streets, with the Edmonds Clock Tower in the foreground.
Damage to roof tops in a residential area .
View down Manchester Street, looking south.
Medlab South building seen across an empty section on Colombo Street where a damaged building has been removed.
Demolition of a building on the corner of Chester and Madras Streets.
Demolition of a building on the corner of Chester and Madras Streets.
Demolition of a building on the corner of Chester and Madras Streets, with the Edmonds Clock Tower in the foreground.
Empty section where damaged buildings have been removed on Colombo Street.
Damaged building on Colombo Street, with the Copthorne Hotel and Forsyth Barr buildings in the background.
Demolition of a building on the corner of Chester and Madras Streets.
Medlab South building seen across an empty section on Colombo Street where a damaged building has been removed.
Medlab South building seen across an empty section on Colombo Street where a damaged building has been removed.
Buildings behind cordon fence on Colombo Street.
Demolition work on Lichfield Street.
Demolition work on Litchfield Street.
Graffiti art on Peterborough Street.
Damage to Cashel Mall, seen through the arch of the Bridge of Remembrance.
A crane beside a building on Cashel Street.
A crane towers over a building on Cashel Street.
A crane beside a building on Cashel Street.
A crane beside a building on Cashel Street.
Demolition work on Litchfield Street, seen through the cordon fence.
Damage to Cashel Mall, seen through the arch of the Bridge of Remembrance.
The Bridge of Remembrance, which is unsafe and has been fenced off after the 22nd of February earthquake.
The Bridge of Remembrance, which is unsafe and has been fenced off after the 22nd of February earthquake.
Demolition work on Litchfield Street.
Demolition work on Litchfield Street.
Earthquake damage to the Cathedral of the Blessed Sacrament. Shipping containers support the front of the building to prevent further damage, and workers are suspended from a crane above the remains of the dome.