A photograph of a drain pipe of the Cranmer Centre, damaged by the earthquake.
A photograph of the date stone in the Cranmer Centre.
A photograph of a beam removed from the Cranmer Centre and placed on the ground in front.
A photograph of earthquake damage around the date stone in the Cranmer Centre.
A photograph of a beam removed from the Cranmer Centre and placed on the ground in front.
A photograph of an excavator demolishing the Cranmer Centre.
A photograph of the partially-demolished Cranmer Centre.
A photograph of the partially-demolished Cranmer Centre.
A photograph of an excavator clearing rubble from the partially-demolished Cranmer Centre.
A photograph of the partially-demolished Cranmer Centre.
A photograph of rubble from the partially-demolished Cranmer Centre.
A photograph of an excavator demolishing the Cranmer Centre.
A photograph of an excavator demolishing the Cranmer Centre.
A photograph of a pile of bricks from the partially-demolished Cranmer Centre.
Waikato Times 22-Feb-2012 section: S, page 13
Waikato Times 22-Feb-2012 section: ZZ, page 23
Photograph captioned by Fairfax, "A massive 7.4 magnitude earthquake has hit Christchurch and the wider South Island, causing widespread damage, two serious injuries and power cuts to most of the city".
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Classrooms under construction on the Oval.
Deputy Vice-Chancellor Ian Town preparing to enter and retrieve his work from the 6th floor of the Registry Building, with an emergency and security staff member.
Workers pouring concrete into the foundations for the temporary classrooms on the Ilam Oval.
Workers pouring concrete into the foundations for the temporary classrooms on the Ilam Oval.
Cement is piped from the trucks to the foundations where it is poured into the foundation posts when building the Ilam village.
A worker holding insulation for the floor of the temporary classrooms.
Workers photographed on the Ilam Oval, helping to build the temporary classrooms.
Papers fallen on the floor in an office in the Registry Building.
Papers fallen on the floor in an office in the Registry Building.
Draw contents fallen on the floor along with the draw in an office in the Registry Building.