A plan which describes how SCIRT is to carry out construction works. The first version of this plan was produced on 10 August 2011.
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
A photograph captioned by Paul Corliss, "Barbadoes Street/Tuam street. Earthquake 4th of September 2010".
A photograph captioned by Paul Corliss, "Valley Inn demolition, Friday 10th September 2010".
A photograph captioned by Paul Corliss, Corner Worcester Street and Linwood Avenue".
A photograph captioned by Paul Corliss, "Man in green snake skin shoes - Gough the Property Investor. Looking towards Southwark Street and Colombo Street".
A photograph captioned by Paul Corliss, "Linwood House demolition".
A photograph of a damaged house. The photograph is captioned by Paul Corliss, "Fitzgerald Avenue".
A photograph of the boarded-up side of a building on Peterborough Street.
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
Students from the University of Canterbury heading back to work after enjoying a barbeque lunch in Burwood Park. The students have volunteered to clear liquefaction from Christchurch properties as part of the Student Volunteer Army.
Prince William speaking at the Christchurch Earthquake Memorial Service. A sign language interpreter is standing to the right. The service was held in Hagley Park on 18 March 2011.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Notes from the most recent forum".
Demolition of a building on the corner of Chester and Madras Streets, with the Edmonds Clock Tower in the foreground.
Temporary office space set up in the NZi3 building. The photographer comments, "University of Canterbury administration all fits into one building! Well, sort of. A long view of the west end; Facilities, enrolments, student admin, then meeting areas. E-learning is the first bay to the east side of the stairs".
Paul Nicholls from the University of Canterbury's E-Learning team and Digital Media Group Manager Wayne Riggall in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Adjoining our area is a space for Wayne, the Digital Media Group Manager, who will organise a sitting area for visitors and small meetings. Beyond Wayne is a closed-off meeting room".
A car drives onto the damaged Dallington bridge. The bridge has visibly moved relative to the road, there is a large gap at the side of the bridge, and the railings are warped. The photographer comments, "Dallington Bridge northern approach, Gayhurst Rd".
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
A damaged building on Bealey Avenue still has a For Sale sign in front of it. The building has been cordoned off with emergency tape.
A sign and basket of flowers for the River of Flowers event held in Riccarton Bush, commemorating the second anniversary of the 22 February earthquake. The sign reads "In memory of those we lost, Feb 22nd 2011, River of Flowers".
The Octagon Live restaurant, seen from Hereford Street.
A photograph of earthquake-damaged buildings along Manchester Street near Struthers Lane. The front of the buildings have crumbled, the bricks falling onto the footpath in front, damaging the awnings.
A photograph of the earthquake damage to the Asko Design building on Victoria Street. The front facade and side wall have crumpled, exposing the inside of the buildings. The awnings over the windows have been twisted and ripped off by the falling bricks.
A photograph of the earthquake damage to a building in central Christchurch. Broken glass and other rubble litters the courtyard in front of the building. There is a large crack in the brick wall to the right. A red sticker on the glass door indicates that the building is unsafe to enter.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team inside a building in the Christchurch central city. Silt and water from liquefaction has covered large sections of the concrete floor.
The exposed wall of a building on Peterborough Street covered in graffiti.