Search

found 109110 results

Research papers, The University of Auckland Library

The 2010/2011 Canterbury earthquakes have provided a unique opportunity to investigate the seismic performance of both traditional and modern buildings constructed in New Zealand. It is critical that the observed performance is examined and compared against the expected levels of performance that are outlined by the Building Code and Design Standards. In particular, in recent years there has been a significant amount of research into the seismic behaviour of precast concrete floor systems and the robustness of the support connections as a building deforms during an earthquake. An investigation of precast concrete floor systems in Christchurch has been undertaken to assess both the performance of traditional and current design practice. The observed performance for each type of precast floor unit was collated from a number of post-earthquake recognisance activities and compared against the expected performance determined for previous experimental testing and analysis. Possible reasons for both the observed damage, and in some cases the lack of damage, were identified. This critical review of precast concrete floor systems will assist in determining the success of current design practice as well as identify any areas that require further research and/or changes to design standards.

Research papers, The University of Auckland Library

As part of the ‘Project Masonry’ Recovery Project funded by the New Zealand Natural Hazards Research Platform, commencing in March 2011, an international team of researchers was deployed to document and interpret the observed earthquake damage to masonry buildings and to churches as a result of the 22nd February 2011 Christchurch earthquake. The study focused on investigating commonly encountered failure patterns and collapse mechanisms. A brief summary of activities undertaken is presented, detailing the observations that were made on the performance of and the deficiencies that contributed to the damage to approximately 650 inspected unreinforced clay brick masonry (URM) buildings, to 90 unreinforced stone masonry buildings, to 342 reinforced concrete masonry (RCM) buildings, to 112 churches in the Canterbury region, and to just under 1100 residential dwellings having external masonry veneer cladding. Also, details are provided of retrofit techniques that were implemented within relevant Christchurch URM buildings prior to the 22nd February earthquake. In addition to presenting a summary of Project Masonry, the broader research activity at the University of Auckland pertaining to the seismic assessment and improvement of unreinforced masonry buildings is outlined. The purpose of this outline is to provide an overview and bibliography of published literature and to communicate on-going research activity that has not yet been reported in a complete form. http://sesoc.org.nz/conference/programme.pdf

Research papers, The University of Auckland Library

Unreinforced masonry (URM) is a construction type that was commonly adopted in New Zealand between the 1880s and 1930s. URM construction is evidently vulnerable to high magnitude earthquakes, with the most recent New Zealand example being the 22 February 2011 Mw6.3 Christchurch earthquake. This earthquake caused significant damage to a majority of URM buildings in the Canterbury area and resulted in 185 fatalities. Many URM buildings still exist in various parts of New Zealand today, and due to their likely poor seismic performance, earthquake assessment and retrofit of the remaining URM building stock is necessary as these buildings have significant architectural heritage and occupy a significant proportion of the nation’s building stock. A collaborative research programme between the University of Auckland and Reid Construction Systems was conducted to investigate an economical yet effective solution for retrofitting New Zealand’s existing URM building stock. This solution adopts the shotcrete technique using an Engineered Cementitious Composite (ECC), which is a polyvinyl alcohol fibre reinforced mortar that exhibits strain hardening characteristics. Collaborations have been formed with a number of consulting structural engineers throughout New Zealand to develop innovative and cost effective retrofit solutions for a number of buildings. Two such case studies are presented in this paper. http://www.concrete2013.com.au/technical-program/

Research papers, The University of Auckland Library

As a result of the 4 September 2010 Darfield earthquake and the more damaging 22 February 2011 Christchurch earthquake, considerable damage occurred to a significant number of buildings in Christchurch. The damage that occurred to the Christchurch Roman Catholic Cathedral of the Blessed Sacrament (commonly known as the Christchurch Basilica) as a result of the Canterbury earthquakes is reported, and the observed failure modes are identified. A previous strengthening intervention is outlined and the estimated capacity of the building is discussed. This strengthening was completed in 2004, and addressed the worst aspects of the building's seismic vulnerability. Urgent work was undertaken post-earthquake to secure parts of the building in order to limit damage and prevent collapse of unstable parts of the building. The approach taken for this securing is outlined, and the performance of the building and the previously installed earthquake strengthening intervention is evaluated.A key consideration throughout the project was the interaction between the structural securing requirements that were driven by the requirement to limit damage and mitigate hazards, and the heritage considerations. Lessons learnt from the strengthening that was carried out, the securing work undertaken, and the approach taken in making the building "safe" are discussed. Some conclusions are drawn with respect to the effectiveness of strengthening similar building types, and the approach taken to secure the building under active seismic conditions. AM - Accepted Manuscript

Research papers, The University of Auckland Library

The Catholic Cathedral is classified as a category 1 listed heritage building constructed largely of unreinforced stone masonry, and was significantly damaged in the recent Canterbury earthquakes of 2010 and 2011. In the 2010 event the building presented slight to moderta damage, meanwhile in the 2011 one experienced ground shaking in excess of its capacity leading to block failures and partial collapse of parts of the building, which left the building standing but still posing a significant hazard. In this paper we discuss the approach to develop the earthquake analysis of the building by 3D numerical simulations, and the results are compared/calibrated with the observed damage of the 2010 earthquake. Very accurate records were obtained during both earthquakes due to a record station located least than 80 m of distance from the building and used in the simulations. Moreover it is included in the model the soil structure interaction because it was observed that the ground and foundation played an important role on the seismic behavior of the structure. A very good agreement was found between the real observed damage and the nonlinear dynamic simulations described trough inelastic deformation (cracking) and building´s performance.

Research papers, The University of Auckland Library

Description: Observations of RC building performance in recent earthquakes with a special focus on the devastating events in Christchurch, New Zealand. These events have highlighted the complexity of post-earthquake decisions for damaged buildings and the impacts on communities. The presentation will reflect on factors influencing demolition decisions and emerging challenges for the earthquake engineering community. http://atc-sei.org/

Research papers, The University of Auckland Library

This paper explores the responses by a group of children to an art project that was undertaken by a small school in New Zealand after the September 2010 and February 2011 Christchurch earthquakes. Undertaken over a period of two years, the project aimed to find a suitable form of memorialising this significant event in a way that was appropriate and meaningful to the community. Alongside images that related directly to the event of the earthquakes, the art form of a mosaic was chosen, and consisted of images and symbols that clearly drew on the hopes and dreams of a school community who were refusing to be defined by the disaster. The paper 'writes' the mosaic by placing fragments of speech spoken by the children involved in relation to ideas about memory, affect, and the 'sublime', through the work of Jean-Francois Lyotard. The paper explores the mosaic as constituted by the literal and metaphorical 'broken pieces' of the city of Christchurch in ways that confer pedagogic value inscribed through the creation of a public art space by children. AM - Accepted Manuscript

Research papers, The University of Auckland Library

Following a damaging earthquake, the immediate emergency response is focused on individual collapsed buildings or other "hotspots" rather than the overall state of damage. This lack of attention to the global damage condition of the affected region can lead to the reporting of misinformation and generate confusion, causing difficulties when attempting to determine the level of postdisaster resources required. A pre-planned building damage survey based on the transect method is recommended as a simple tool to generate an estimate of the overall level of building damage in a city or region. A methodology for such a transect survey is suggested, and an example of a similar survey conducted in Christchurch, New Zealand, following the 22 February 2011 earthquake is presented. The transect was found to give suitably accurate estimates of building damage at a time when information was keenly sought by government authorities and the general public. VoR - Version of Record

Research papers, The University of Auckland Library

The majority of current procedures used to deduce liquefaction potential of soils rely on empirical methods. These methods have been proven to work in the past, but these methods are known to overestimate the liquefaction potential in certain regions of Christchurch due to a whole range of factors, and the theoretical basis behind these methods cannot be explained scientifically. Critical state soil mechanics theory was chosen to provide an explanation for the soil's behaviour during the undrained shearing. Soils from two sites in Christchurch were characterised at regular intervals for the critical layers and tested for the critical state lines (CSL). Various models and relationships were then used to predict the CSL and compared with the actual CSL. However none of the methods used managed to predict the CSL accurately, and a separate Christchurch exclusive relationship was proposed. The resultant state parameter values could be obtained from shear-wave velocity plots and were then developed into cyclic resistance ratios (CRR). These were subsequently compared with cyclic stress ratios (CSR) from recent Christchurch earthquakes to obtain the factor of safety. This CSL-based approach was compared with other empirical methods and was shown to yield a favourable relationship with visual observations at the sites' locations following the earthquake.

Research papers, The University of Auckland Library

"The nuclear meltdown at Fukushima ... the Fonterra botulism scare ... the Christchurch earthquakes – in all these recent crises the role played by scientists has been under the spotlight. What is the first duty of scientists in a crisis – to the government, to their employer, or to the wider public desperate for information? And what if these different objectives clash? In this penetrating BWB Text, leading scientist Shaun Hendy finds that in New Zealand, the public obligation of the scientist is often far from clear and that there have been many disturbing instances of scientists being silenced. Experts who have information the public seeks, he finds, have been prevented from speaking out. His own experiences have led him to conclude that New Zealanders have few scientific institutions that feel secure enough to criticise the government of the day." - Publisher information. http://librarysearch.auckland.ac.nz/UOA2_A:Combined_Local:uoa_alma21259423940002091

Research papers, The University of Auckland Library

Livelihood holds the key to a rapid recovery following a large-scale devastating disaster, building its resilience is of paramount importance. While much attention has been given to how to help people who are displaced from their jobs to regain employment, little research on livelihood resilience has been undertaken for those relocated communities following a disaster event. By studying five re-located villages post-2004 Indian Ocean Tsunami in Banda Aceh and Aceh Besar, Indonesia, this research has identified the indicators of livelihood resilience and the critical factors driving it for post-disaster relocated communities. A mixed approach, combining questionnaire surveys, semistructured interviews, and field observations, was used for the collection of data. Housing entitlement, the physical and mental health of residents, access to external livelihood support and the provision of infrastructure and basic services were identified as amongst the most critical indicators that represent the level of livelihood resilience. Early recovery income support, physical and mental health, availability and timeliness of livelihood support, together with cultural sensitivity and governance structure, are amongst the most important factors. Given the nature of resettlement, access to infrastructure, location of relocated sites, the safety of the neighbourhood and the ability to transfer to other jobs/skills also play an important role in establishing sustained employment for relocated communities in Indonesia. Those indicators and factors were synthesised into a framework which was further tested in the recovery of Christchurch, and Kaikoura, New Zealand during their recovery from devastating earthquakes. It is suggested that the framework can be used by government agencies and aid organisations to assess the livelihood resilience of post-disaster relocated communities. This will help better them plan support policies and/or prioritise resilience investment strategies to ensure that the recovery needs of those relocated are best met.

Images, Alexander Turnbull Library

Several people run, leap, cycle and walk the dog through an area piled high with waste material. Context: Bottle Lake Forest Park has tracks and trails which include mountain-bike tracks, horse-trekking trails and walking tracks. After being established as a temporary dump after the February 22 earthquake the government intend to use special powers to turn part of Bottle Lake Forest Park into a permanent dump. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Cartoon shows a mechanic asking his boss for a pay rise. Text reads 'Like the Christchurch Council CEO - I've also been working hard. Would I be cheeky to ask for a $68,000 pay rise?'. Context: Christchurch City Council Chief Executive Officer Tony Marryatt ended up turning down a pay rise of $68,000 following the outcry when the fact was made public. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Shows rain falling over two gondolas of people floating past flooded Christchurch damaged houses. One person points to people in balaclavas climbing over the houses and calls out 'And look...the wildlife's returning!'. Context: Heavy rain and flooding hit Christchurch suburbs, including earthquake damaged homes (Newstalk website 14 August 2012). At the same time, wildlife (possums and rare birds) are moving into abandoned suburbs (Stuff 13 August 2012) Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Refers to the controversy over the decision to demolish the Christchurch Cathedral which was severely damaged in the earthquakes of 2010 and 2011. The Anglican Bishop of Christchurch Victoria Mathews says the decision to demolish the cathedral was reached through prayer, great deliberation and with the utmost concern for safety. The Bishop says a number of options were considered before deciding to bring the walls down but the turning point was 23 December 2011, when a series of strong quakes rocked the city. At that stage the Canterbury Earthquake Authority approached the church. "CERA told us that our plans for making safe and retrieving, and then stepping back and making further decisions were no longer adequate." Christchurch City council announced their support on Twitter this afternoon (17 May 2012) - tweeting an endorsement to an immediate pause on demolition of the Cathedral to enable deeper and more open consideration of options. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Shows a mobile phone with a text on it that reads 'Dear Chch (Christchurch) thinking of u (you) all xxx NZ'. Context: Refers to the commemoration events taking place in Christchurch on 22 February 2012 which is the first anniversary of the 2011 earthquake which killed 185 people. Mobile phones were instrumental in helping to locate victims and in enabling people to communicate with trapped victims. B&W and colour versions of this cartoon available Quantity: 2 digital cartoon(s).

Images, Alexander Turnbull Library

Ruamoko, the Earthquake God, stirs in his bed, and with a sudden yawn, wonders if it is time to awake again. Above him Christchurch City trembles. On 15 May 2012, after several months of comparatively small quakes, a 4.5 Richter Scale earthquake was registered only 10 km East of Christchurch. Quake-weary Christchurch citizens feared that another large earthquake was on its way. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

A plane flies into the distance. Attached to it by a rope is a large package containing Christchurch Mayor Bob Parker and CEO of the City Council Tony Marryatt. The package is addressed 'Deepest Siberia c/- isolated hellhole Russia'. The mayor looks on the bright side considering this to be a junket the people will approve of. Context: Public disapproval of the Mayor's two-week tour of Asian countries with a Christchurch International Airport-led delegation. The airport is paying for the mayoral couple to take part in the trip. There is public criticism that the trip take place at this time because of ongoing problems with the council and earthquake recovery. There is also criticism of Tony Marryatt's $68,000 pay increase considered poor form when so many people are struggling with earthquake related problems. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Cartoon drawn in the style of a pen and ink drawing of the broken Christchurch Cathedral. One version has 'RIP' printed above the non-existant spire and the second has 'RIP' and the words 'Rest in Pieces'. A decision has been made to demolish the cathedral which was severely damaged by the earthquakes of 2010 and 2011. Two versions of this cartoon are available Title from file name Quantity: 2 digital cartoon(s).

Images, Alexander Turnbull Library

The top frame shows the barbed wire and watch tower of a prison. There is a comment about someone wanting the warmth of a prison cell. The second frame shows prison staff chatting at cross purposes about a petition from Christchurch with homes wrecked by earthquake pleading to be allowed to live in prison and the sentence imposed on the Bridgecorp directors who have been accused of defrauding investors. Colour and black and white versions available Quantity: 2 digital cartoon(s).