Search

found 109114 results

Images, eqnz.chch.2010

Low tide on the Avon River at New Brighton/Bexley. Note the original bank and the rock wall slipage on right. The white additions were added in March and April 2011 to protect the properties behind from flooding. Ultimately this area was "red zoned" with all houses removed or to be removed and the ground left till a rehabilitation method can ...

Images, eqnz.chch.2010

"Open Theatre" - The Odeon Built in 1883 and known as the Tuam Street Hall or Theatre and was New Zealand's oldest masonry, purpose built theatre. In 1930, it became the St. James Theatre, It became The Odeon Movie Theatre in 1960. Demolition started in September 2012 after the Christchurch earthquakes of 2010/2011 but seems to have stopped!?

Images, eqnz.chch.2010

As buildings are demolished as a result of the earthquake in 2011, Wilson Carparking are waiting to pounce on each bit of vacant land. Someone suggested about a year ago that the city be renamed "Wilson" as that name appears more in the central city than Christchurch does! In the background the CERES NZ nibbler attacks the support structure fo...

Images, eqnz.chch.2010

While the whole of the North Island is under drought conditions and parts of the South Island likely to follow suit, I doubt it will happen in Christchurch. With hundreds of earthquake road, water and sewer repairs underway many are spilling hundreds of litres of water per minute, like this one outside my house. It has been running like this fo...

Images, eqnz.chch.2010

With the land dropping about 1metre to 1.4metres after the earthquakes, a few roads besides the Avon and Heathcote Rivers are flooded with very high tides. Extra stop banks (on right) erected after the quakes have helped, but the road is now well below high water level. New Brighton Road, just short of New Brighton. The Pages Road bridge may b...

Images, eqnz.chch.2010

Detail of the Christchurch Anglicain Cathedral viewed from a path between the new Cashel Mall shopping area and Cathedral Square which was opened two weekends ago. This is the first time this section of the city has been open to the public since the 22 February 2011 earthquake. It will be closed off again after 11 December 2011 for the demolitio...

Images, eqnz.chch.2010

Hotel Grand Chancellor on verge of collapse but still standing after the 6.3 magnitude quake hit Christchurch on 22 February 2011 because of concrete being poured into the lower floors.

Images, eqnz.chch.2010

one of Christchurch's abandoned suburbs. The land moved - bricks and block walls everywhere collapsed - two multi story buildings folded - 184 people died. Wooden framed houses largely stayed up, many concrete slabs cracked, power poles leaned in liquid ground, surface bubbled, services ruptured .... damage to the cbd still gets the most cover...

Images, eqnz.chch.2010

A few older Christchurch Earthquake Pics from after the 6.3 last Feb (2011). And yes the aftershocks are still happening.. Twitter | Facebook |

Images, eqnz.chch.2010

20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...

Images, eqnz.chch.2010

The Cathedral of the Blessed Sacrament, Christcurch, after the 6.3 magnitude quake on 22 February 2011. When The Angels Fall Take your father's cross Gently from the wall A shadow still remaining See the churches fall In mighty arcs of sound And all that they're containing Yet all the rugged souls Looking for their lost homes Shuffle to...