Armagh Street, near the corner of Durham Street North, looking east-ish towards the Canterbury Provincial Council and Supreme Court Buildings.
None
Canterbury Provincial Council and Supreme Court Buildings, Durham Street North.
Manchester Street looking north-ish, towards the intersection with Armagh Street.
Montreal Street and Armagh Street, Cranmer Square.
Colombo Street looking north through Cathedral Square, towards the Port Hills. Taken from Victoria Square.
Aftermath of September 4th Earthquake in Canterbury NZ. Bridge Street, South Brighton, Christchurch.
Aftermath of September 4th Earthquake in Canterbury, NZ. Damage to roads alongside Avon river, Christchurch City.
None
None
None
Light-Relief - With no power after the 6.3 magnatude quake hit Christchurch (22 February 2011) the neighbour's freezer thawed out along with their Deep South Ice Cream - so Tiggles the Kunekune Piglet thinks the spoils of the power-cut are yummy!
Nearly 80 40 foot containers (most two high) protect Wakefield Avenue in Sumner from further rock falls. Behind these (to the left) are houses, church, bowling club, RSA (Returned Servicemens Association) and other community buildings that have been isolated now for nearly two years now. On the right upper third boundary (just behind two stand a...
None
According to the sign it can take about 30 minutes to walk from the entry point (near the small statue) to the centre and out again. What you can do with a few thousand old bricks and gravel. See next photo for more detail.
None
185 pieces of Rock from Halswell Quarry to represent the 185 lives lost as a result of the 22/02/11 earthquake.
Is it to "ward" off evil spirits?.
20110821_1708_1D3-280 Six months on A house in Bexley damaged in the February earthquake still looks like this six months later.
Pws-2011-07-10-dsc04997
Pws-2011-07-10-dsc04984
Pws-2011-07-10-dsc04994
Pws-2010-12-24-dsc6139
Pws-2010-12-24-dsc6149
Pws-2010-12-24-dsc6153
Pws-2010-12-24-dsc6138
Cathedral Square walkway, Saturday 26 November.
Cathedral Square walkway, Saturday 26 November.
Cathedral Square walkway, Saturday 26 November.
The CBD is slowly being opened up and this is the post - earthquake result of Cashel Mall. A vibrant, fresh look with high end shopping in colourful container shops. A really good step forward for the city.