A photograph of people gathered at Re:START mall for an architecture tour by Anton Tritt of the Buchan Group. The event was part of FESTA 2012.
Photograph captioned by BeckerFraserPhotos, "Detail of right hand side of demolition site at 164-170 Hereford Street".
Photograph captioned by BeckerFraserPhotos, "The Clarendon Tower under deconstruction, viewed from Cathedral Square. The Regent Theatre site is in the foreground".
A photograph of students installing In Your Face, which is part of LUXCITY.
A photograph of a sign on a house reading, "Red zone, yeah right". The photograph is captioned by BeckerFraserPhotos, "Featherston Avenue, Pines Beach".
A photograph of Anton Tritt from the Buchan Group on the balcony of the Crafted Coffee Company during an architecture tour at Re:START mall. The event was part of FESTA 2012.
Photograph captioned by BeckerFraserPhotos, "The almost clear site of the Brannigans Building on Oxford Terrace".
Easter artwork on top of a road cone on Main Road in Clifton. A bunny has been cut out of a milk bottle, painted and placed on top of a road cone.
Photograph captioned by BeckerFraserPhotos, "The Crossing on Colombo Street with the pedestrian bridge to Ballantynes".
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
Page 25 of the Your Weekend section of the Christchurch Press, published on Saturday 26 May 2012.
Page 18 of Section B of the Christchurch Press, published on Wednesday 30 May 2012.
Page 15 of Section C of the Christchurch Press, published on Saturday 9 June 2012.
Page 4 of Section B of the Christchurch Press, published on Wednesday 19 September 2012.
Photograph captioned by BeckerFraserPhotos, "The Queen Victoria statue gazing at a digger on Colombo Street from her pedestal in Victoria Square".
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
Page 12 of Section A of the Christchurch Press, published on Tuesday 13 March 2012.
Page 8 of Section B of the South Island edition of the Christchurch Press, published on Tuesday 24 April 2012.
Page 1 of Section B of the Christchurch Press, published on Friday 27 April 2012.
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
Page 20 of Section C of the Christchurch Press, published on Saturday 31 March 2012.
Photograph captioned by BeckerFraserPhotos, "Demolition of Gough House, 90 Hereford Street".
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
A photograph from a time-lapse series documenting the contruction of Gap Filler's Pallet Pavilion. The photograph was taken from the top of the Christchurch Casino.
Page 6 of Section C of the Christchurch Press, published on Wednesday 10 October 2012.
Page 11 of Section F of the Christchurch Press, published on Saturday 13 October 2012.
Page 13 of Section F of the Christchurch Press, published on Saturday 10 November 2012.
Page 10 of Section B of the Christchurch Press, published on Wednesday 19 December 2012.
A pile of broken up pavement on Kilmore Street. In the background, a digger can be seen behind wire fencing and road cones.
Photograph captioned by BeckerFraserPhotos, "A large pile of concrete rubble from a demolition site in Kilmore Street. Forsyth Barr building in the background".