Damaged building and the back of Argosy House, seen from behind cordon fencing. Cracks down the walls are clearly visible.
A view down Montreal Street where a section of the street has been cordoned off. On the right the Victoria Street clocktower has been blocked off with shipping containers, and a crane is in the front of the Strategy Building.
Damage to the Cranmer Courts. A section of the wall has crumbled, exposing the wooden framing and the interior of the building.
Page 6 of the At Home section of the Christchurch Press, published on Wednesday 2 May 2012.
Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun".
Photograph captioned by Fairfax, "Aerial pictures of earthquake damage in Christchurch. Victoria Street".
Photograph captioned by Fairfax, "Christchurch begins the slow recovery process after last weeks devastating 7.1 earthquake. The historic MLC Building on Manchester Street is due for demolition. Manchester Courts".
Page 19 of Section B of the Christchurch Press, published on Monday 27 December 2010.
Photograph captioned by Fairfax, "Building damage after Christchurch earthquake".
Page 1 of Section C of the Christchurch Press, published on Saturday 18 December 2010.
A photograph of syringes being used to inject epoxy into the cracks of a concrete wall in the Diabetes Centre on Hagley Avenue. The epoxy was injected into the cracks caused by the 4 September 2010 earthquake to strengthen the concrete.
Page 17 of Section C of the Christchurch Press, published on Saturday 30 June 2012.
A chart showing the amount of money paid out by ACC as a result of the Canterbury earthquakes.
Page 7 of Section A of the Christchurch Press, published on Saturday 22 September 2012.
Page 6 of Section A of the Christchurch Press, published on Wednesday 16 January 2013.
A photograph of a room inside a flat on Poplar Street taken during the Residential Access Project. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes. The building's outer wall has crumbled leaving the room exposed.
Page 6 of Section A of the Christchurch Press, published on Saturday 13 October 2012.
Object Overview of 'Christchurch liquefaction study – Stage II (Beca, 2002).'
Page 5 of Section B of the Christchurch Press, published on Saturday 27 April 2013.
Page 5 of Section D of the Christchurch Press, published on Wednesday 5 December 2012.
Page 14 of Section C of the Christchurch Press, published on Saturday 24 August 2013.
Page 1 of the Zest section of the Christchurch Press, published on Wednesday 28 August 2013.
Page 3 of Section E of the Christchurch Press, published on Saturday 5 January 2013.
Page 10 of Section E of the Christchurch Press, published on Saturday 7 September 2013.
Page 9 of Section G of the Christchurch Press, published on Saturday 19 January 2013.
A scan of page 160 of the eighth book of The Pledge.
Page 19 of Section A of the Christchurch Press, published on Saturday 6 December 2014.
Page 3 of Section A of the Christchurch Press, published on Monday 16 September 2013.
Page 12 of Section A of the Christchurch Press, published on Tuesday 7 December 2010.
Page 23 of the Zest section of the Christchurch Press, published on Wednesday 6 March 2013.