Search

found 17 results

Images, eqnz.chch.2010

The twisted and buckled bridge over the river. View looking down the bridge. Damaged from the Christchurch Earthquake Twitter | Facebook |

Images, eqnz.chch.2010

Selective colour full size view from one of my previous shots. Edgeware Road, Christchurch. Damaged from the Christchurch Earthquake Twitter | Facebook |

Images, eqnz.chch.2010

One Month after the Christchurch Earthquake. The mangled remains of the pedestrian bridge over the river Avon Twitter | Facebook | My ...

Images, eqnz.chch.2010

One Month after the Christchurch Earthquake. The mangled remains of the pedestrian bridge over the river Avon Twitter | Facebook | My ...

Images, eqnz.chch.2010

Low tide on the Avon River at New Brighton/Bexley. Note the original bank and the rock wall slipage on right. The white additions were added in March and April 2011 to protect the properties behind from flooding. Ultimately this area was "red zoned" with all houses removed or to be removed and the ground left till a rehabilitation method can ...

Images, eqnz.chch.2010

One Month after the Christchurch Earthquake. This is in Kaiapoi at the north end of Christchurch. A view down the walkway next to the river Twitter | Facebook |

Images, eqnz.chch.2010

One Month after the Christchurch Earthquake. The remains of a Church in St albans, Edgeware Rd Twitter | Facebook | My Website | <...

Images, eqnz.chch.2010

This is the pedestrian bridge in Kaiapoi close to Christchurch. Not the best angle but the whole bridge on the right hand side is twisted and looks like some kind of rollercoaster. Taken one month after the Quake Twitter |

Images, eqnz.chch.2010

There are quite a few signs like this around Christchurch after the Quake. This is one of them. Off shot to the right is a leveled patch of ground where the owners furniture restoration shop used to be. Twitter |

Images, eqnz.chch.2010

20111230_7222_1D3-70 New Brighton Further damage to the bank following the two quakes on 23/12/11. The sewer line broke here and was repaired (patched) by council staff on Christmas Eve. It is hard to beleve that this rock wall was level with the land here, before any of the quakes. #2004

Images, eqnz.chch.2010

Prior to the earthquakes (mainly the February 22 2011 event) this park bench was at track level. Shortly after the February quake someone in the council did the sums and realised that the area near the Avon River had dropped between a metre and 1.4m (about 4 foot), so a rush job by contractors shifted in many tonnes of rock and gravel to raise a...