Images, eqnz.chch.2010

20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...

Images, eqnz.chch.2010

20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...

Images, eqnz.chch.2010

The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.

Images, eqnz.chch.2010

Repairs in progress on this High Street shop; aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.

Images, eqnz.chch.2010

The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.

Images, eqnz.chch.2010

The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.

Images, eqnz.chch.2010

The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.

Images, eqnz.chch.2010

The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.

Images, eqnz.chch.2010

The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.

Images, eqnz.chch.2010

The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.

Images, eqnz.chch.2010

Best View - Press "L". After 36 million liters of water mysteriously disappeared from this reservoir on Huntsbury Hill following the February 22nd 6.3 earthquake in Christchurch work has started on repairing it. This image shows just how large the tank is with a work-truck parked inside it. See Video of TV3 News item:

Images, eqnz.chch.2010

Red stickered building means no access, and the building may be condemned if it cannot be repaired; aftermath of the magnitude 7.1 earthquake that hit Christchurch on 4 September 2010.

Images, eqnz.chch.2010

Repairs being carried out on this restaurant (converted from a church) at the Hereford Street / Manchester Street intersection;aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.

Images, eqnz.chch.2010

This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.