None
Repairing the bush telegraph File Ref: CCL-2011-03-17-St Albans-IMG_0380 From the collection of Christchurch City Libraries.
Repairing the bush telegraph File Ref: CCL-2011-03-17-St Albans-IMG_0379 From the collection of Christchurch City Libraries.
Best View - Press "L". After 36 million liters of water mysteriously disappeared from this reservoir on Huntsbury Hill following the February 22nd 6.3 earthquake in Christchurch work has started on repairing it. This image shows just how large the tank is with a work-truck parked inside it. See Video of TV3 News item:
A little spot of coffee and cheerfulness plus a man up the mast repairing the "bush telegraph" File Ref: CCL-2011-03-17-St Albans-IMG_0387 From the collection of Christchurch City Libraries.
Further damage to the bank following the two quakes on 23/12/11. The sewer line broke here and was repaired (patched) by council staff on Christmas Eve. It is hard to beleve that this rock wall was level with the land here, before any of the quakes.
The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.