
Liquefaction erupted throughout the city during each of the major earthquakes. It had to be cleared and everyone piled it onto the roadside, where it was eventually picked up by City Council trucks. The fine dust permeated the air for weeks, driving many to wear dust masks while outside.
This is a temporary pile of silt piled on the old Bexley landfill sight. Some trucks are addng to the pile, while other truck and trailer units are taking it away to the old Bottle Lake landfill sight, a few km to the north of here.
The last pile of liquefied silt to be cleaned up, from our lawn.
Liquefaction erupted throughout the city during each of the major earthquakes. It had to be cleared and everyone piled it onto the roadside, where it was eventually picked up by City Council trucks. The fine dust permeated the air for weeks, driving many to wear dust masks while outside.
What more can one say except that Shag Rock is now about one third it's original height. Whitewash Head in the background with the road that now drops over a cliff.
Workmen approach the elevator shaft of the CTV building - 05 March 2011 The CTV building claimed 115 lives when it collapsed in a pile of smoking rubble on 22 February 2011 during a 6.3 earthquake in Christchurch and only the lift shaft was left standing.
See previous photo (exactly 3 hours earlier). Demolition of the support structure for NZ Breweries smokestack in Christchurch. CERES NZ's nibbler is at work, the pipe stack having been removed yesterday (Saturday). This is three hours after the previous photo, and just a pile of rubble sits beside the tree (largely undamaged despite being next...