20130106_1240_1D3-60 Medway Street footbridge-2
Images, eqnz.chch.2010
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Prior to the earthquakes (mainly the February 22 2011 event) this park bench was at track level. Shortly after the February quake someone in the council did the sums and realised that the area near the Avon River had dropped between a metre and 1.4m (about 4 foot), so a rush job by contractors shifted in many tonnes of rock and gravel to raise a...