More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Hardy Street/Owles Terrace corner (beside the boat launching ramp), New Brighton
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
Cunningham House at the Christchurch Botanic Gardens is still closed due to earthquake damage. I wonder if it will ever re-open or suffer the demolition fate many other iconic structures in Christchurch have.
The temporary (10 years?) and cheap ($4-6 million) Anglican Cathedral being built a few hundred meters away from the old stone structure that was the centre of Christchurch. Both buildings (the original and this) have caused a lot of controversy, many wanting the old stone one to be repaired (the church want to demolish it), and this as a waste ...
See previous photo (exactly 3 hours earlier). Demolition of the support structure for NZ Breweries smokestack in Christchurch. CERES NZ's nibbler is at work, the pipe stack having been removed yesterday (Saturday). This is three hours after the previous photo, and just a pile of rubble sits beside the tree (largely undamaged despite being next...
Demolition of the support structure for NZ Breweries smokestack in Christchurch. CERES NZ's nibbler is at work, the pipe stack having been removed yesterday (Saturday). I retuned three hours later to see what progress had been made and it was GONE! See next photo. Damage to complex was from the 22/02/20011 earthquake.
As buildings are demolished as a result of the earthquake in 2011, Wilson Carparking are waiting to pounce on each bit of vacant land. Someone suggested about a year ago that the city be renamed "Wilson" as that name appears more in the central city than Christchurch does! In the background the CERES NZ nibbler attacks the support structure fo...
20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...