Search

found 67 results

Images, eqnz.chch.2010

Christchurch city experienced a magnitude 7.1 earthquake on September 4 at 4:35 am. The epicentre was 40 km west of the city. It was the most damaging earthquake in New Zealand since the Hawke's Bay earthquake in 1931, but there was no loss of life. It was fortunate the earthquake occurred when the central city streets were deserted, as there w...

Images, eqnz.chch.2010

A suburban "red zone" house from Velsheda Street (#11), Pacific Park, is finally cut in half and loaded ready for transport out and a future life somewhere else in the South Island, whether it be close by or way down south in Gore or Clinton (where a few have gone already). The house has been stripped of it's bricks and jacked up for over four m...

Images, eqnz.chch.2010

While the whole of the North Island is under drought conditions and parts of the South Island likely to follow suit, I doubt it will happen in Christchurch. With hundreds of earthquake road, water and sewer repairs underway many are spilling hundreds of litres of water per minute, like this one outside my house. It has been running like this fo...

Images, eqnz.chch.2010

20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...

Images, eqnz.chch.2010

Went for a drive down to South New Brighton/Southshore after work today to see what interesting birds I could find on the Estuary (godwits, skuas, terns etc), but passing Jellico Street, I saw this. T-Rex the seismic survey truck from the University of Texas that is visiting the city (first time out of USA). Weighs 30 tonne and from the marks o...

Images, eqnz.chch.2010

20160703_144759_GT-S7275T-04 New sea wall at Redcliffs (185/366) I went for a drive in my second car mainly to charge the battery up and forgot to take my camera gear so only had my phone. This is the new rock wall to replace the severely damaged previous one (in the February 2011 earthquake). Work is still underway on the car parking and p...

Images, eqnz.chch.2010

Six ½ years after the earthquakes there are still a few demolitions taking place. This one is a block of council owned flats. Whether the whole complex is being demolished or not I don't know., but here the centre block of three is being demolished. The green grass is what was sections and houses demolished in 2012-2015 as it is too close to t...