None
Palmers Road, New Brighton
New Brighton water pumphouse
Corner Cresswell Ave, New Brighton Road
Water supply building, Palmers Road, New Brighton
The South Brighton bridge abutment (city side). Bridge looks fine, just both approaches have moved A LOT!
The city side of the South Brighton bridge. Approaches on both sides will need extensive work before this bridge can re-open.
20100904_3322_1D3-200 Bridge Street bridge, Christchurch earthquake South Brighton Bridge. See the gap between the abutment and the bridge itself (just to right of lower person).
The city side of the South Brighton bridge. Approaches on both sides will need extensive work before this bridge can re-open. Bridge opened for traffic less than a week later, but still (23/09) has 30kmh speed restriction.
A local resident walks to the nearest dairy for essentials after the 7.1 magnitude quake, that has caused major infrastructure damage to Christchurch City.
The pumping station at the corner of New Brighton Road and Palmers Road. New Brighon Road is still closed (2 weeks after quake) at this point.