20130106_1240_1D3-60 Medway Street footbridge-2
Images, eqnz.chch.2010
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...