20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...
None
Work is continuing on the earthquake damaged South New Brighton bridge. Avon River to the left, Avon-Heathcote Estuary the other side of the bridge.
Removal of the earthquake damaged footbridge over the Avon at Medway Street. Tuesday 12 February 2013. File reference: CCL-2013 -02-12-untitled3.bmp From the collection of Christchurch City Libraries.
Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage.
None
Cashel Mall/Cashel Street
Prior to the earthquakes the stone wall at right was near road level. Now it is about 1.5m (4-5ft) lower.
Eighty years and then the damage was done. Result of the earthquake on 22/02/11.