One Month after the Christchurch Earthquake. This is in Kaiapoi at the north end of Christchurch. A view down the walkway next to the river Twitter | Facebook |
over the Avon - we hid a magnetic geocache under this one called "Whitebait Watch".
over the Avon - we hid a magnetic geocache under this one called "Whitebait Watch".".
over the Avon - we hid a magnetic geocache under this one called "Whitebait Watch".
over the Avon - we hid a magnetic geocache under this one called "Whitebait Watch".
Castle Rock above Heathcote, showing damage (and two very large pieces in the foreground) that came down during the 7.1 quake on 4th September.
Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, which...
Much of the CBD is still cordoned off and without power (as you should be able to spot) as a result of the damage caused by February's deadly earthquake. This photo clearly shows the extent of the lean that the Hotel Grand Chancellor is now on. Apparently it is out by 1m at the top leaning east. Demolition will start about mid June and is expec...
Christchurch's Cathedral
Helicopter Flight over Christchurch New Zealand
Efforts are being made to shore up and strengthen this building (corner of Hereford Street / Manchester Street) to save it from demolition after it suffered structural damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Efforts are being made to shore up and strengthen this building (corner of Hereford Street / Manchester Street) to save it from demolition after it suffered structural damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Shipping container placed in front of shop on Tuam Street act as a safety barrier in case earthquake-damaged shop collapses (Fri 24-9-2010).
One Month after the Christchurch Earthquake. The mangled remains of the pedestrian bridge over the river Avon Twitter | Facebook | My ...
One Month after the Christchurch Earthquake. The mangled remains of the pedestrian bridge over the river Avon Twitter | Facebook | My ...
This is St Peters Riccarton. It was damaged in one of the two big Earthquakes to hit Christchurch in September 2010 and February 2011. Its taken a LONG time for work to really get going, but now that it is, they are also upgrading and extending the church with a modern annexe.
The electrical supply substation built into the Lion Breweries Canterbury Draught brewery in St Asaph Street, Christchurch. Now the whole complex is being demolished due to earthquake damage.
Typical lateral damage to houses caused by the 7.1 magnitude quake in Christchurch at 4.35am on the 4th September 2010.
The sign was relating to damage sustained from the Sept 2010 quake. Photoshopped by Alice to update it since the Feb 22nd quake.
The Christchurch Methodist Church van takes a hit from the falling gable end of the church.
This has made a huge mess for the residents to clean up. I heard on the news that homes have been damaged by subsidence in areas of earthquake-caused liquefaction like this.
Working at getting things out of the Victoria Square before it is demolished. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... What I found on my walk around the city January 15, 2014 Ch...
The community centre in my old neighbourhood. Now it's an empty lot.
The community centre in my old neighbourhood. Now it's an empty lot.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
As a way of reducing traffic - and hence damaging vibrations - many streets are partially blocked by these signs. Also many of them have a 30kph speed limit.