Damaged roof has rendered this pub on Madras Street unsafe in the aftermath of the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
Nearing the end of demolition of the Westend Jewellers site on the corner of Worcester and Manchester Streets, Christchurch. Badly damaged in the September 4th earthquake.
This beautiful building on Madras Street may be condemned after suffering serious structural damage in the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
Bexley Subdivision (<5yrs old) Due to be condemned following the liquification damage
Selwyn CD off to check out the damage after the 40+ aftershocks overnight.
Selwyn CD off to check out the damage after the 40+ aftershocks overnight.
Bexley Subdivision (<5yrs old) Due to be condemned following the liquification damage
Bexley Subdivision (<5yrs old) Due to be condemned following the liquification damage
Bexley Subdivision (<5yrs old) Due to be condemned following the liquification damage
Bexley Subdivision (<5yrs old) Due to be condemned following the liquification damage
Bexley Subdivision (<5yrs old) Due to be condemned following the liquification damage
looking south along manchester st.
Our Street - Liquefaction (22.02.2011) Woolston Christchurch Canterbury New Zealand © 2011 Phil Le Cren Photo Taken With: Canon EOS 1000D + Canon EF/EF-S lenses + 10.1 effective megapixels + 2.5-inch TFT color LCD monitor + Eye-level pentamirror SLR + Live View shooting. + EOS Built-in Sensor cleaning system + Wide-...
Tour bus on Cambridge Terrace. File reference: CCL-2011-08-12-CanterburyPublic Library pre-demolition-042 From the collection of Christchurch City Libraries.
Colombo Street closed off south of Moorhouse Ave, due to a damaged shop now deemed unstable; aftermath of a magnitude 7.1 earthquake that struck Christchurch on 4 September 2010.
Christchurch's CBD as seen from the Cashmere hills, south of the city. Much of the CBD is still cordoned off and without power (as you should be able to spot) as a result of the damage caused by February's deadly earthquake.
The current state of the Christchurch Cathedral can be seen in the middle. The spire collapsed as a result of the earthquake. Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, 2011. Much of the inner city CBD is still cordoned off and will be for some time. About 900 buildings are ...
Damaged facade? That's the decorative mural of this restaurant located on Manchester Street in Christchurch!
Hotel Grand Chancellor - Leaning 1m to the east, demolition will start about mid June and is expected to take 10 months to complete at a cost of approx NZ$10m. It will be the biggest & tallest demolition project in New Zealand. Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, ...
The Dick Smith Electronics shops at St Asaph Street / Colombo Street was extensively damaged in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The Dick Smith Electronics shops at St Asaph Street / Colombo Street was extensively damaged in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The Dick Smith Electronics shops at St Asaph Street / Colombo Street was extensively damaged in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The Dick Smith Electronics shops at St Asaph Street / Colombo Street was extensively damaged in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Oxford Terrace Baptist Church on the corner of Madras St and Oxford Terrace, and alongside the Central City Fire Station on Kilmore St.
December 2011
File reference: CCL-2011-08-12-CanterburyPublic Library pre-demolition-016 From the collection of Christchurch City Libraries.
File reference: CCL-2011-08-12-CanterburyPublic Library pre-demolition-022 From the collection of Christchurch City Libraries.