Search

found 779 results

Images, eqnz.chch.2010

20110821_1708_1D3-280 Six months on A house in Bexley damaged in the February earthquake still looks like this six months later.

Images, eqnz.chch.2010

Best View - Press "L". After 36 million liters of water mysteriously disappeared from this reservoir on Huntsbury Hill following the February 22nd 6.3 earthquake in Christchurch work has started on repairing it. This image shows just how large the tank is with a work-truck parked inside it. See Video of TV3 News item:

Images, eqnz.chch.2010

External stairs on the Forsyth Barr building in Christchurch. Portions of the internal stairwell collapsed during the earthquake of February 22nd 2011, necessitating use of various means of getting people out of the building. Was the fourth highest building in the city pre earthquakes, but it's future is uncertain. Was for sale "as is, where ...

Images, eqnz.chch.2010

The Cranmer Court demolition started today in Christchurch. The 1876 building was originally a Normal School and was in a derelict state in the early 1980s when it was rescued and converted into apartments. The heritage-listed building was red-stickered after the February 2011 earthquake.

Images, eqnz.chch.2010

Much of the CBD is still cordoned off and without power (as you should be able to spot) as a result of the damage caused by February's deadly earthquake. This photo clearly shows the extent of the lean that the Hotel Grand Chancellor is now on. Apparently it is out by 1m at the top leaning east. Demolition will start about mid June and is expec...

Images, eqnz.chch.2010

Another house has gone from Seabreeze Close, Pacific Park, Bexley, leaving just the concrete base, a few floor tiles and the smashed toilet (throne). Houses are being demolished (85%) or deconstructed/shifted (15%) as a result of land damage in the major earthquakes of 4th September 2010, 22nd February 2011, 13th June 2011 and 23rd December 2...

Images, eqnz.chch.2010

Prior to the earthquakes (mainly the February 22 2011 event) this park bench was at track level. Shortly after the February quake someone in the council did the sums and realised that the area near the Avon River had dropped between a metre and 1.4m (about 4 foot), so a rush job by contractors shifted in many tonnes of rock and gravel to raise a...

Images, eqnz.chch.2010

The Church of the Good Shepherd (Philips Street) is a fine example of High Victorian Gothic architecture and was designed by Benjamin Woolfield Mountfort in 1884. It has suffered some major damage during 6.3 quake that hit Christchurch 22 February 2011. From Psalm 23 (King James Version) The Lord is my shepherd; I shall not want. ...

Images, eqnz.chch.2010

8 Velsheda Street, Bexley, Christchurch, across the road from my house was demolished a week or so ago, just one of many demolitions of Red Zone properties at the moment. This house was about ten years old and suffered land damage during the 4th September 2010 and 22nd February 2011 earthquakes. The same fate awaits my house later in the year o...

Images, eqnz.chch.2010

Awaiting the demolition ball! See the hole punched in by the neighbouring building (now demolished) during the February 22 2011 earthquake. This building is leaning to the north (left) while it's now demolished neighbour was leaning to the south (right). All because the crap land gave way underneath!

Images, eqnz.chch.2010

The Cathedral of the Blessed Sacrament, Christcurch, after the 6.3 magnitude quake on 22 February 2011. When The Angels Fall Take your father's cross Gently from the wall A shadow still remaining See the churches fall In mighty arcs of sound And all that they're containing Yet all the rugged souls Looking for their lost homes Shuffle to...

Images, eqnz.chch.2010

The sign reads: The CTV Building was headquarters of Canterbury Television (CTV) and also housed King’s Education language School, a medical clinic, Hair Consultants, Relationship Services and a nursing school. On February 22nd 2011 the building collapsed as a result of a major earthquake. Sadly, 115 people who were in the building lost their l...

Images, eqnz.chch.2010

The ticket office at Lancaster Park (AMI Stadium), not used since the February 2011 earthquake. Windows broken and door boarded up. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired.

Images, eqnz.chch.2010

AMI Stadium (Lancaster Park), not used since the February 2011 earthquake. It was used predominantly for rugby and cricket. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired. The concrete pad lower left is ...

Images, eqnz.chch.2010

20160703_144759_GT-S7275T-04 New sea wall at Redcliffs (185/366) I went for a drive in my second car mainly to charge the battery up and forgot to take my camera gear so only had my phone. This is the new rock wall to replace the severely damaged previous one (in the February 2011 earthquake). Work is still underway on the car parking and p...

Images, eqnz.chch.2010

The old (or is that the new) Inland Revenue Department (IRD) building on the corner of Madras and Cashel Streets in central Christchurch. Built in 2006/07 on the site of the former Farmers department store (itself badly damaged by fire), it was just a few years old when the earthquake of February 2011 struck, and subsequent quakes (all through 2...

Images, eqnz.chch.2010

The Forsyth Barr building has stood silent and empty (except the occasional intruder and pigeons) since the February 2011 earthquake. It was sold "as is" and I understand that it is now going to be fitted out as a hotel. This is the building that had severe stairwell damage during the quake necessitating people being lowered via ropes etc on t...