The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Hardy Street/Owles Terrace corner (beside the boat launching ramp), New Brighton
None
Best View - Press "L". After 36 million liters of water mysteriously disappeared from this reservoir on Huntsbury Hill following the February 22nd 6.3 earthquake in Christchurch work has started on repairing it. This image shows just how large the tank is with a work-truck parked inside it. See Video of TV3 News item:
Red stickered building means no access, and the building may be condemned if it cannot be repaired; aftermath of the magnitude 7.1 earthquake that hit Christchurch on 4 September 2010.
A little spot of coffee and cheerfulness plus a man up the mast repairing the "bush telegraph" File Ref: CCL-2011-03-17-St Albans-IMG_0387 From the collection of Christchurch City Libraries.
Repairs being carried out on this restaurant (converted from a church) at the Hereford Street / Manchester Street intersection;aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
Yellow stickered building means restricted access, and the building will need to be repaired and certified fit for use; aftermath of the magnitude 7.1 earthquake that hit Christchurch on 4 September 2010.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
73 months after the earthquake that damaged it, the jetty at South New Brighton Domain is still not repaired. Seven years ago it was straight and level. Dull, flat and orrible (horrible) light meant this image was destined to become monochrome!
Steel frames are being used to shore the unstable facade of the St John the Baptist Church at Latimer Square while the building is being repaired and strengthened following the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The bridge on River Road just before the Banks Ave turn off. The bridge approach to the left subsided. Temporary repairs have been carried out but you can still see evidence of the amount of subsidence by the traffic island in the middle of the road.
Further damage to the bank following the two quakes on 23/12/11. The sewer line broke here and was repaired (patched) by council staff on Christmas Eve. It is hard to beleve that this rock wall was level with the land here, before any of the quakes.
Only it is worse this time! As from Wednesday I won't have car access to the property, nor the street, nor one of the neighbouring streets - for a month at least! A second attempt to do a sewer repair after the earthquakes - yes I know they were 3 to 2½ years ago!
The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.
The ticket office at Lancaster Park (AMI Stadium), not used since the February 2011 earthquake. Windows broken and door boarded up. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired.
Only two of 20 houses left in the Rawhiti Earthquake Village. This from the sign on perimeter fence: "Since 2011, Rawhiti Domain has been used to provide temporary accommodation for those affected by the Canterbury earthquakes. Over 200 households have used the 20 houses while their own homes have been repaired or rebuilt. The demand for acco...
The temporary (10 years?) and cheap ($4-6 million) Anglican Cathedral being built a few hundred meters away from the old stone structure that was the centre of Christchurch. Both buildings (the original and this) have caused a lot of controversy, many wanting the old stone one to be repaired (the church want to demolish it), and this as a waste ...
AMI Stadium (Lancaster Park), not used since the February 2011 earthquake. It was used predominantly for rugby and cricket. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired. The concrete pad lower left is ...
There are occasional sewerage spills into the Avon River while all the sewer and road repairs are carried out. This rock wall was level and well above high tide level prior to the eathquakes. All the houses that can been seen here (except for those on the distant Port Hills) are in the suburban "red zone" and are still to be demolished.
While the whole of the North Island is under drought conditions and parts of the South Island likely to follow suit, I doubt it will happen in Christchurch. With hundreds of earthquake road, water and sewer repairs underway many are spilling hundreds of litres of water per minute, like this one outside my house. It has been running like this fo...
The NG building on Madras Street was given the go ahead to repair earthquake damage, which the owners did at some expense, Now, the government want this land to build a central city stadium, so there is a protest on the windows set to the Christmas song the Twelve Days of Christmas. 12 million road cones 11 thousand Hi-Viz (vests) 10 Council m...
The NG building on Madras Street was given the go ahead to repair earthquake damage, which the owners did at some expense, Now, the government want this land to build a central city stadium, so there is a protest on the windows set to the Christmas song the Twelve Days of Christmas. 12 million road cones 11 thousand Hi-Viz (vests) 10 Council m...
The earthquake re-pair work has started on the Knox Church on Bealey Avenue, August 14, 2013 Christchurch New Zealand. While building after building is torn down in Christchurch, plans are in place to ensure as much of a 131-year-old church is retained as possible. Knox Church on Bealey Avenue suffered major damage in the February 22 earthquak...
None
20160703_144759_GT-S7275T-04 New sea wall at Redcliffs (185/366) I went for a drive in my second car mainly to charge the battery up and forgot to take my camera gear so only had my phone. This is the new rock wall to replace the severely damaged previous one (in the February 2011 earthquake). Work is still underway on the car parking and p...