The CBD is slowly being opened up and this is the post - earthquake result of Cashel Mall. A vibrant, fresh look with high end shopping in colourful container shops. A really good step forward for the city.
Christchurch's CBD as seen from the Cashmere hills, south of the city. Much of the CBD is still cordoned off and without power (as you should be able to spot) as a result of the damage caused by February's deadly earthquake.
The Christchurch Methodist Church van takes a hit from the falling gable end of the church.
Much of the CBD will be cordoned off and without power (as you should be able to spot) for quite some time as a result of the damage caused by February's deadly earthquake.
Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, 2011. Much of the inner city CBD is still cordoned off and will be for some time. About 900 buildings are set for demolition. Taken aboard the Southern DC3 www.so...
Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, 2011. Much of the inner city CBD is still cordoned off and will be for some time. About 900 buildings are set for demolition. Taken aboard the Southern DC3 www.so...
Much of the CBD will be cordoned off and without power (as you should be able to spot) for quite some time as a result of the damage caused by February's deadly earthquake.
Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, 2011. Much of the inner city CBD is still cordoned off and will be for some time. About 900 buildings are set for demolition. Taken aboard the Southern DC3 www.so...
Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, 2011. Much of the inner city CBD is still cordoned off and will be for some time. About 900 buildings are set for demolition. Taken aboard the Southern DC3 www.so...
In the suburban red zone on Avonside Drive.
Damage to the Hotel Grand Chancellor can be seen in the middle. At the bottom left is the lift shaft (now fully demolished) of the CTV building which claimed over 100 lives when it collapsed in the earthquake. Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, 2011. Much of the inn...
Hotel Grand Chancellor - Leaning 1m to the east, demolition will start about mid June and is expected to take 10 months to complete at a cost of approx NZ$10m. It will be the biggest & tallest demolition project in New Zealand. Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, ...
The current state of the Christchurch Cathedral can be seen in the middle. The spire collapsed as a result of the earthquake. Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, 2011. Much of the inner city CBD is still cordoned off and will be for some time. About 900 buildings are ...
A local resident walks to the nearest dairy for essentials after the 7.1 magnitude quake, that has caused major infrastructure damage to Christchurch City.
20161112_9961_7D2-70 The future face of Christchurch? Cultivate Christchurch is operating this urban farm in the city, about 5-10 minutes walk to Cathedral Square. Many of the buildings in this area were demolished after the earhquakes, and in the background is a new building on Kilmore Street.
Much of the CBD is still cordoned off and without power (as you should be able to spot) as a result of the damage caused by February's deadly earthquake. This photo clearly shows the extent of the lean that the Hotel Grand Chancellor is now on. Apparently it is out by 1m at the top leaning east. Demolition will start about mid June and is expec...
73 months after the earthquake that damaged it, the jetty at South New Brighton Domain is still not repaired. Seven years ago it was straight and level. Dull, flat and orrible (horrible) light meant this image was destined to become monochrome!
Today was the first time I have been to the earthquake memorial since it was completed and opened on 22nd February 2017, six years after the devastating quake that killed the 185 that are named on this wall. I knew two of the people on the list.