None
None
Traveling past the Central Library in Gloucester Street PWS-2010-09-07-DSC01925
Traveling past the Central Library in Gloucester Street PWS-2010-09-07-DSC01926
Shot a music video in here 2 weeks ago.
None
the arts centre - under repair following the earthquake.
looking past the peacock fountain to the arts centre - under repair following the earthquake.
looking past the peacock fountain to the arts centre - under repair following the earthquake.
20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...
Knox Church Rebuild/ repair on a walk around the neighbourhood May 17, 2014 Christchurch New Zealand.
20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...
Knox Church earthquake repair/rebuild on a walk around Christchurch December 11, 2013 New Zealand. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... All about our ear...
(It was already opened up mid-way through a repair. But it wasn't on the floor!)
None
Sewer repairs due to earthquake damage have our street totally closed off apart from pedestrian traffic down the footpath.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
The damaged (and once iconic Christchurch Cathedral) waits it's fate (repaired or demolish/rebuild) with the Millenium hotel in background.
None
A section of retaining wall that tilted in the Christchurch 2011 earthquake. At the Edmunds Band Rotunda sight. Still not repaired,
Repairing the bush telegraph File Ref: CCL-2011-03-17-St Albans-IMG_0380 From the collection of Christchurch City Libraries.
Repairing the bush telegraph File Ref: CCL-2011-03-17-St Albans-IMG_0379 From the collection of Christchurch City Libraries.
Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Repairs in progress on this High Street shop; aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.