
Christchurch Earthquake Aftermath PWS-2010-09-12-DSC02226
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
The South Brighton bridge abutment (city side). Bridge looks fine, just both approaches have moved A LOT!
20100904_3322_1D3-200 Bridge Street bridge, Christchurch earthquake South Brighton Bridge. See the gap between the abutment and the bridge itself (just to right of lower person).
None
20100904_3308_1D3-24 Road crack - Christchurch earthquake Outside our house after the 7.1 Richter Canterbury earthquake on September 4 2010 #369
None
Hit at 4.35am (local time) on Saturday, September 4th 2010, measuring a 7.1 and centered 40km west of the city
The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. Monumental masons is a gravestone maker. Note: these photos were taken on a cellphone; mind the quality.
Pws-2010-10-07-dsc03625
Pws-2010-10-07-dsc03610
Manchester Street PWS-2010-10-07-DSC03621
Pws-2010-10-07-dsc03611
Slipping of the tectonic plates caused tension cracks on this previously unknown faultline that runs through this paddock; magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
This originally straight farm fence has been laterally displaced at least 2 metres where it crosses the previously unknown faultline from which the Saturday 4 September 2010 earthquake originated.
This originally straight farm fence has been laterally displaced at least 2 metres where it crosses the previously unknown Greendale Faultline from which the Saturday 4 September 2010 earthquake originated.
The faultline cuts across Telegraph Road, leaving a kink in its originally straight alignment; aftermath of the magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
This shop on Riccarton Road was badly damaged in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010, and had to be demolished.
Quake-damaged shops on Manchester Street; aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 3 September 2010.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Quake-damaged shops on Manchester Street; aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 3 September 2010.
None
None
None
None
Burst main geyser
Road shift
Christchurch command 2118 keeping track of units around town. Outside art gallery EOC (Emergency Operation Control)