Search

found 52 results

Research papers, University of Canterbury Library

With the occurrence of natural disasters on the increase, major cities around the world face the potential of complete loss of infrastructure due to design guidelines that do not consider resilience in the design. With the February 22nd, 2011 earthquake in Christchurch, being the largest insured event, lessons learnt from the rebuild will be vital for the preparation of future disasters. Therefore the objective of this research is to understand the financial implications of the changes to the waste water design guidelines used throughout the five year rebuild programme of works. The research includes a study of the SCIRT alliance model selected for the delivery that is flexible enough to handle changes in the design with minimal impact on the direct cost of the rebuild works. The study further includes the analysis and compares the impact of the three different guidelines on maintenance and replacement cost over the waste water pipe asset life. The research concludes that with the varying ground conditions in Christchurch and also the wide variety of materials in use in the waste water network up to the start of the CES, the rebuild was not a ‘one size fits all’ approach.

Research papers, University of Canterbury Library

The level of destruction from the 2011 Christchurch earthquakes led to changes in the New Zealand seismic building code. The destruction showed that the NZ building codes did not fully performed to expectation and needed Improvement to ensure that impact of future earthquakes would be minimised. The building codes have been amended to improve buildings resilience to earthquake and other related extreme loading conditions. Rebuilding Christchurch with the new modifications in the seismic building code comes with its own unique challenges to the entire system. This project investigates the impact of rebuilding Christchurch with the new seismic Building codes in terms of how the new changes affected the building industry and the management of construction.

Research papers, University of Canterbury Library

There has not been substantial research conducted in the area of fraud and natural disasters. Therefore, this study sought to examine the perceptions of Canterbury residents toward the recovery process following the September 2010 and February 2011 earthquakes and whether residents felt as though contractor fraud occurs in Canterbury. A questionnaire was developed to gauge information about Canterbury residents’ self-reports involving the earthquakes, specific contractors involved, parties involved with the recovery process in general, and demographic information. Participants included a total of 213 residents from the Canterbury region who had been involved with contractors and/or insurance companies due to the recovery process. Results indicated that a high percentage of the participants were not satisfied with the recovery process and that almost half of the participants reported feeling scammed by contractors in Canterbury after the 2010 and 2011 earthquakes. Moreover, the results indicate that participants neither agreed with the assessments made about their property losses nor the plans made to recover their properties. In many cases, participants felt pressured and even reluctant to accept these assessments and/or plans. The present study does not seek to explain why contractor fraud exists or what motivates scammers. Conversely, it attempts to demonstrate the perceptions of contractor fraud and satisfaction that have taken place in the aftermath of the Canterbury earthquakes.

Research papers, University of Canterbury Library

Since September 2010 Christchurch, New Zealand, has experienced a number of significant earthquakes. In addition to loss of life, this has resulted in significant destruction to infrastructure, including road corridors; and buildings, especially in the central city, where it has been estimated that 60% of buildings will need to be rebuilt. The rebuild and renewal of Christchurch has initially focused on the central city under the direction of the Christchurch City Council. This has seen the development of a draft Central City Plan that includes a number of initiatives that should encourage the use of the bicycle as a mode of transport. The rebuild and renewal of the remainder of the city is under the jurisdiction of a specially set up authority, the Christchurch Earthquake Recovery Authority (CERA). CERA reports to an appointed Minister for Canterbury Earthquake Recovery, who is responsible for coordinating the planning, spending, and actual rebuilding work needed for the recovery. Their plans for the renewal and rebuild of the remainder of the city are not yet known. This presentation will examine the potential role of the bicycle as a mode of transport in a rebuilt Christchurch. The presentation will start by describing the nature of damage to Christchurch as a result of the 2010 and 2011 earthquakes. It will then review the Central City Plan (the plan for the rebuild and renewal for central Christchurch) focusing particularly on those aspects that affect the role of the bicycle. The potential for the success of this plan will be assessed. It will specifically reflect on this in light of some recent research in Christchurch that examined the importance of getting infrastructure right if an aim of transport planning is to attract new people to cycle for utilitarian reasons.

Research papers, University of Canterbury Library

The Canterbury earthquakes have generated economic demand and supply volatility, highlighting geographical and structural interdependencies. Post-earthquake reconstruction and new developments have seen skills training, relocation, recruitment and importation of skills becoming crucial for construction companies to meet demand and compete effectively. This report presents 15 case studies from a range of organisations involved in the Canterbury rebuild, exploring the business dynamics and outcomes of their resourcing initiatives. A key finding of this research is that, for many construction organisations, resourcing initiatives have become part of their organisational longer-term development strategies, rather than simply a response to ‘supply and demand’ pressures. Organisations are not relying on any single resourcing solution to drive their growth but use a combination of initiatives to create lasting business benefits, such as cost savings, improved brand and reputation, a stable and productive workforce, enhanced efficiency and staff morale, as well as improved skill levels.

Research papers, University of Canterbury Library

Collective identity construction in organisations engaged in an inter-organisational collaboration (IOC), especially temporary IOCs set up in disaster situations, has received scant attention in the organisational studies literature yet collective identity is considered to be important in fostering effective IOC operations. This doctoral study was designed to add to our understanding about how collective identity is constituted throughout the entire lifespan of a particular temporary coopetitive (i.e., simultaneously collaborative and competitive) IOC formed in a post-disaster environment. To achieve this purpose, a qualitative case study of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT), a time-bound coopetition formed to repair the horizontal infrastructure in Christchurch, New Zealand after the devastating 2011 Canterbury earthquakes, was undertaken. Using data from semi-structured interviews, field observations, and organisational documents and other artefacts, an inductive analytic method was employed to explore how internal stakeholders engaged with and co- constructed a collective SCIRT identity and reconciled this with their home organization identity. The analysis revealed that the SCIRT collective identity was an ongoing process, involving the interweaving of social, temporal, material and geospatial dimensions constructed through intersecting cycles of senior managers’ sensegiving and employees’ sensemaking across SCIRT’s five and a half years of existence. Senior management deliberately undertook identity work campaigns that used organisational rituals, artefacts, and spatial design to disseminate and encourage a sense of “we are all SCIRT”. However, there was no common sense of “we-ness”. Identification with SCIRT was experienced differently among different groups of employees and across time. Employees’ differing senses of collective identity were accounted for by their past, present, and anticipated future relationships with their home organisation, and also (re)shaped by the geosocial environments in which they worked. The study supports previous research claiming that collective identity is a process of recursive sensegiving and sensemaking between senior managers and employees. However, it extends the literature by revealing the imbricated nature of collective identity, how members’ sense of “who we are” can change across the entire lifetime of a temporary IOC, and how sociomateriality, temporality, and geosocial effects strongly intervene in employees’ emerging senses of collective identity. Moreover, the study demonstrates how the ongoing identity work can be embedded in a time-space frame that further accentuates the influence of temporality, especially the anticipated future, organisational rituals, artefacts, and the geosocial environment. The study’s primary contribution to theory is a processual model of collective identity that applies specifically to a temporary IOC involving coopetition. In doing so, it represents a more finely nuanced and situational model than existing models. At a practical level, this model suggests that managers need to appreciate that organisational artefacts, rituals, and the prevailing organisational geosocial environment are inextricably linked in processes that can be manipulated to enhance the construction of collective identity.

Research papers, University of Canterbury Library

The earthquake sequence has resulted in significant physical and reputational damage to the Canterbury tourism industry. Eighteen months after the earthquakes inbound tourism data is still below pre-earthquake levels, with Canterbury operators reporting that the industry has not bounced back to where it was before September 2010. Outcomes of the earthquakes on business performance highlight there were winners and losers in the aftermath. Recovery of inbound tourism markets is closely tied to the timeframe to rebuild the CBD of Christchurch. Reinstating critical tourism infrastructure will drive future tourism investment, and allow tourism businesses to regenerate and thrive into the future. A blueprint for rebuilding the CBD of Christchurch was released by the Christchurch City Council in July 2012, and has been well received by tourism stakeholders in the region. The challenge now is for city officials to fund the development projects outlined in the blueprint, and to rebuild the CBD as quickly as possible in order to help regenerate the tourism industry in Christchurch, Canterbury and the rest of the South Island

Research papers, University of Canterbury Library

The 1995 book, “Wellington after the quake: the challenge of rebuilding cities”, is reviewed in light of the 2010/2011 Canterbury, New Zealand, earthquakes. Lessons are drawn related to the difficulties of recovery of complex infrastructure systems after disasters.

Research papers, University of Canterbury Library

Mr Wayne Tobeck, Director of Southrim Group (SRG), sponsored this 2013 MEM Project titled; A Technical and Economic Feasibility Study for the Integration of GSHP Technology in the Christchurch Rebuild. Following the recent Christchurch earthquakes, a significant amount of land has become too unstable to support traditional building foundations. This creates an opportunity to implement new and unique foundation designs previously unconsidered due to high costs compared to traditional methods. One such design proposes that an Injection Micro-Piling technique could be used. This can also be coupled with HVAC technology to create a Ground Source Heat Pump (GSHP) arrangement in both new buildings and as retrofits for building requiring foundation repair. The purpose of this study was to complete a feasibility study on the merits of SRG pursuing this proposed product. A significant market for such a product was found to exist, while the product was also found to be technically and legally feasible. However, the proposed product was found to not be economically feasible with respect to Air Source Heat Pumps due to the significantly higher capital and installation costs required. Further analysis suggests GSHPs may become more economically attractive in operating temperatures lower than -9oC, though the existence of markets with this climate in NZ has not been studied. It is therefore suggested that SRG do not proceed with plans to develop a GSHP coupled foundation solution for the Christchurch rebuild.

Research papers, University of Canterbury Library

This research attempts to understand how the Christchurch rebuild is promoting urban liveability in the Central City, focussing on the influence of communities and neighbourhoods in this area. To do this, gathering the perceptions of Christchurch residents through surveys, a focus group and semi-structured interviews was carried out to see what aspects they believe contribute to creating more liveable places. These methods revealed that there are pockets of neighbourhoods and communities in the inner-city, but no overall sense of community. Results from the semi-structured interviews reinforced this; the current buyers of inner-city property are in the financial position to be able to do this, and they seem to be purchasing in this area due to convenience and investment rather than to join the existing communities in the area. Analysing the survey responses from Central City residents revealed contrasting results. Those currently living in the area felt there is a sense of community in the inner-city, but these are found in pockets of neighbourhoods around the Central City rather than in the overall area. The focus group revealed that community is further prioritised later in life, and that many of the community groups in the inner-city predominantly consist of those who have lived there since before the Christchurch Earthquake Series. However, participants of all three methods believed that the Central City is slowly becoming a lively and vibrant place. To improve urban liveability in the inner-city, it seems that prioritisation of the needs of current inner-city residents is required. Improving these neighbourhoods, whether it be through the implementation of services or providing more communal spaces, is needed to create stronger communities. The feelings of place, connectedness, and belonging that arise from being part of a community or well-connected neighbourhood can improve mental health and wellbeing, ultimately enhancing the overall health of the population as well as the perceived urban liveability of the area.

Research papers, University of Canterbury Library

Knowing how to rapidly rebuild disaster-damaged infrastructure, while deciding appropriate recovery strategies and catering for future investment is a matter of core interest to government decision makers, utility providers, and business sectors. The purpose of this research is to explore the effects of decisions and outcomes for physical reconstruction on the overall recovery process of horizontal infrastructure in New Zealand using the Canterbury and Kaikoura earthquakes as cases. A mixed approach including a systematic review, questionnaire survey and semi-structured interviews is used to capture perspectives of those involved in reconstruction process and gain insights into the effect of critical elements on infrastructure downtime. Findings from this research will contribute towards advancements of a systems dynamics model considering critical decision-making variables across phases of the reconstruction process to assess how these variables affect the rebuild process and the corresponding downtime. This project will improve the ability to explore alternative resilience improvement pathways and test the efficacy of alternative means for facilitating a faster and better reconstruction process.

Research papers, University of Canterbury Library

Social media have changed disaster response and recovery in the way people inform themselves, provide community support and make sense of unfolding and past events online. During the Canterbury earthquakes of 2010 and 2011 social media platforms such as Facebook and Twitter became part of the story of the quakes in the region, as well as a basis for ongoing public engagement during the rebuild efforts in Christchurch. While a variety of research has been conducted on the use of social media in disaster situations (Bruns & Burgess, 2012; Potts, Seitzinger, Jones, & Harrison, 2011; Shklovski, Palen, & Sutton, 2008), studies about their uses in long-term disaster recovery and across different platforms are underrepresented. This research analyses networked practices of sensemaking around the Canterbury earthquakes over the course of disaster response, recovery and rebuild, focussing on Facebook and Twitter. Following a mixed methodological design data was gathered in interviews with people who started local Facebook pages, and through digital media methods of data collection and computational analysis of public Facebook pages and a historical Twitter dataset gathered around eight different earthquake-related events between 2010 and 2013. Data is further analysed through discursive and narrative tools of inquiry. This research sheds light on communication practices in the drawn-out process of disaster recovery on the ground in connecting different modes of discourse. Examining the ongoing negotiation of networked identities through technologically mediated social practices during Canterbury’s rebuild, the connection between online environments and the city of Christchurch, as a physical place, is unpacked. This research subsequently develops a new methodology to study social media platforms and provide new and detailed information on both the communication practices in issue-based online publics and the ongoing negotiation of the impact of the Canterbury earthquakes through networked digital means.

Research papers, University of Canterbury Library

Christchurch and Canterbury suffered significant housing losses due to the earthquakes. Estimates from the Earthquake Commission (EQC) (2011) suggest that over 150,000 homes (around three quarters of Christchurch housing stock) sustained damage from the earthquakes. Some areas of Christchurch have been declared not suitable for rebuilding, affecting more than 7,500 residential properties.

Research papers, University of Canterbury Library

Principal contractors can achieve better financial performance in civil construction projects by increasing the proportion of works delivered by subcontractors. However, anecdotally the use of subcontractors is thought to be make principal contractors less competitive due to compounding profit margins. This study found that projects with a higher proportion of subcontracted work exhibit better financial results than projects with less work delivered by subcontractors. This study uses the Christchurch Infrastructure Alliance (known as the Stronger Christchurch Infrastructure Rebuild Team, SCIRT) as a case study to observe why principal contracting firms engage subcontractors and the effect subcontracting has on the overall performance of a construction project. Five top tier civil contracting firms (known as ‘delivery teams’) participated in the alliance. Each team was responsible for the delivery of individual projects. A sample of 334 individual SCIRT projects were analysed, and key delivery team staff were surveyed, to investigate the effect subcontractor engagement has on performance. Between the five delivery teams there were clear differences in how much work was delivered via subcontracts. The extent of this subcontractor engagement had a significant effect on the relative performance of the principal contractor. A positive correlation between subcontractor engagement and overall financial performance is observed, and a negative correlation is observed between subcontractor engagement and non-financial performance. Although the causes of these relationships appear complex, the primary reason appears to be that subcontracting fosters increased productivity by cascading financial performance incentives closer to the physical construction task. To maximise competitiveness and financial performance, principal contractors must embrace the use of subcontractors and develop efficient systems of managing subcontracted work.

Research papers, University of Canterbury Library

The New Zealand city of Christchurch suffered a series of devastating earthquakes in 2010-11 that changed the urban landscape forever. A new rebuilt city is now underway, largely based on the expressed wishes of the populace to see Christchurch return to being a more people-oriented, cycle-friendly city that it was known for in decades past. Currently 7% of commuters cycle to work, supported by a 200km network of mostly conventional on-road painted cycle lanes and off-road shared paths. The new "Major Cycleways" plan aims to develop approximately 100km of high-quality cycling routes throughout the city in 5-7 years. The target audience is an unaccompanied 10-year-old cycling, which requires more separated cycleways and low-volume/speed "neighbourhood greenways" to meet this standard. This presentation summarises the steps undertaken to date to start delivering this network. Various pieces of research have helped to identify the types of infrastructure preferred by those currently not regularly cycling, as well as helping to assess the merits of different route choices. Conceptual cycleway guidelines have now been translated into detailed design principles for the different types of infrastructure being planned. While much of this work is based on successful designs from overseas, including professional advice from Dutch practitioners, an interesting challenge has been to adapt these designs as required to suit local road environments and road user expectations. The first parts of the new network are being rolled out now, with the hope that this will produce an attractive and resilient network for the future population that leads to cycling being a major part of the local way of life.

Research papers, University of Canterbury Library

The University of Canterbury has initialized a research program focusing on the seismic sustainability of structures. As part of this program, the relative seismic sustainability of various structures will be assessed to identify those with the highest sustainability for the Christchurch rebuild and general use in New Zealand. This preliminary case study assesses one reinforced concrete (RC) frame structure and one RC wall structure. The scenario loss is evaluated for two earthquake records considering direct losses only in order to explain and illustrate the methodology.

Research papers, University of Canterbury Library

The Canterbury earthquakes of 2010-2012 have been generation shaping. People living and working in and around the city during this time have had their lives and social landscapes changed forever. The earthquake response, recovery and rebuild efforts have highlighted unheralded social strengths and vulnerabilities within individuals, organisations, communities and country writ large. It is imperative that the social sciences stand up to be counted amongst the myriad of academic research, commentary and analysis.

Research papers, University of Canterbury Library

There is a now a rich literature on the connections between digital media, networked computing, and the shaping of urban material cultures. Much less has addressed the post-disaster context, like we face in Christchurch, where it is more a case of re-build rather than re-new. In what follows I suggest that Lev Manovich’s well-known distinction between narrative and database as distinct but related cultural forms is a useful framework for thinking about the Christchurch rebuild, and perhaps urbanism more generally.

Research papers, University of Canterbury Library

The Canterbury earthquakes of 2010 and 2011 caused significant damage and disruption to the city of Christchurch, New Zealand. A Royal Commission was established to report on the causes of building failure as a result of the earthquakes as well as look at the legal and best-practice requirements for buildings in New Zealand Central Business Districts. The Royal Commission made 189 recommendations on a variety of matters including managing damaged buildings after an earthquake, the adequacy of building codes and standards, and the processes of seismic assessments of existing buildings to determine their earthquake vulnerability. In response the Ministry of Business, Innovation and Employment, the agency responsible for administering building regulation in New Zealand, established a work programme to assist with the Canterbury rebuild and to implement the lessons learned throughout New Zealand. The five primary work streams in the programme are: • Facilitating the Canterbury Rebuild • Structural Performance and Design Standards • Geotechnical and structural guidance • Existing Building Resilience • Post Disaster Building Management This paper provides more detail on each of the work streams. There has been significant collaboration between the New Zealand Government and the research community, technical societies, and engineering consultants, both within New Zealand and internationally, to deliver the programme and improve the resilience of the New Zealand built environment. This has presented major challenges for an extremely busy industry in the aftermath of the Canterbury earthquakes. The paper identifies the items of work that have been completed and the work that is still in progress at the time of writing.

Research papers, University of Canterbury Library

Christchurch Ōtautahi, New Zealand, is a city of myriad waterways and springs. Māori, the indigenous people of New Zealand, have water quality at the core of their cultural values. The city’s rivers include the Avon/Ōtākaro, central to the city centre’s aesthetic appeal since early settlement, and the Heathcote/Ōpāwaho. Both have been degraded with increasing urbanisation. The destructive earthquake sequence that occurred during 2010/11 presented an opportunity to rebuild significant areas of the city. Public consultation identified enthusiasm to rebuild a sustainable city. A sustainable water sensitive city is one where development is constructed with the water environment in mind. Water sensitive urban design applies at all scales and is a holistic concept. In Christchurch larger-scale multi-value stormwater management solutions were incorporated into rapidly developed greenfield sites on the city’s outskirts and in satellite towns, as they had been pre-earthquake. Individual properties on greenfield sites and within the city, however, continued to be constructed without water sensitive features such as rainwater tanks or living roofs. This research uses semi-structured interviews, policy analysis, and findings from local and international studies to investigate the benefits of building-scale WSUD and the barriers that have resulted in their absence. Although several inter-related barriers became apparent, cost, commonly cited as a barrier to sustainable development in general, was strongly represented. However, it is argued that the issue is one of mindset rather than cost. Solutions are proposed, based on international and national experience, that will demonstrate the benefits of adopting water sensitive urban design principles including at the building scale, and thereby build public and political support. The research is timely - there is still much development to occur, and increasing pressures from urban densification, population growth and climate change to mitigate.

Research papers, University of Canterbury Library

In recent Canterbury earthquakes, structures have performed well in terms of life safety but the estimated total cost of the rebuild was as high as $40 billion. The major contributors to this cost are repair/demolition/rebuild cost, the resulting downtime and business interruption. For this reason, the authors are exploring alternate building systems that can minimize the downtime and business interruption due to building damage in an earthquake; thereby greatly reducing the financial implications of seismic events. In this paper, a sustainable and demountable precast reinforced concrete (RC) frame system in which the precast members are connected via steel tubes/plates or steel angles/plates and high strength friction grip (HSFG) bolts is introduced. In the proposed system, damaged structural elements in seismic frames can be easily replaced with new ones; thereby making it an easily and quickly repairable and a low-loss system. The column to foundation connection in the proposed system can be designed either as fixed or pinned depending on the requirement of strength and stiffness. In a fixed base frame system, ground storey columns will also be damaged along with beams in seismic events, which are to be replaced after seismic events; whereas in a pin base frame only beams (which are easy to replace) will be damaged. Low to medium rise (3-6 storey) precast RC frame buildings with fixed and pin bases are analyzed in this paper; and their lateral capacity, lateral stiffness and natural period are scrutinized to better understand the pros and cons of the demountable precast frame system with fixed and pin base connections.

Research papers, University of Canterbury Library

This research examines the connection between accessibility and resilience in post-earthquake Christchurch. This research will provide my community partner with a useful evidence base to help show that increased accessibility does create a more resilient environment. This research uses an in-depth literature review along with qualitative interview approach discussing current levels of accessibility and resilience in Christchurch and whether or not the interview participants believe that increased accessibility in Christchurch will make our city more resilient to future disasters. This research is important because it helps to bridge the connection between accessibility and resilience by showing how accessibility is an important aspect of making a city resilient. In Christchurch specifically, it is a great time to create an accessible and inclusive environment in the post-earthquake rebuild state the city is currently in. Showing that an accessible environment will lead to a more resilient city is important will potentially lead to accessible design being included in the rebuild of places and spaces in Christchurch. In theory, the results of this research show that having an accessible environment leads to universal inclusiveness which in turn, leads to a resilient city. An overarching theme that arose during this research is that accessibility is a means to inclusion and without inclusion a society cannot be resilient. In practice, the results show that for Christchurch to become more accessible and inclusive for people with disabilities, there needs to not only be an increase the accessibility of places and spaces but accessibility to the community as well. Having accessible infrastructure and communities will lead to increased social and urban resilience, especially for individuals with disabilities. This research is beneficial because it helps to bridge the connection between accessibility and resilience. Resilience is important because it help cities prepare for, respond to and recover from disasters and this research helps to show that accessibility is an important part of creating resilience. Some questions still remain unresolved mainly looking into normalising accessibility and deciphering how to prove that accessibility is an issue that effects everybody, not just individuals with disabilities.

Research papers, University of Canterbury Library

This research examines the connection between accessibility and resilience in post-earthquake Christchurch. This research will provide my community partner with a useful evidence base to help show that increased accessibility does create a more resilient environment. This research uses an in-depth literature review along with qualitative interview approach discussing current levels of accessibility and resilience in Christchurch and whether or not the interview participants believe that increased accessibility in Christchurch will make our city more resilient to future disasters. This research is important because it helps to bridge the connection between accessibility and resilience by showing how accessibility is an important aspect of making a city resilient. In Christchurch specifically, it is a great time to create an accessible and inclusive environment in the post-earthquake rebuild state the city is currently in. Showing that an accessible environment will lead to a more resilient city is important will potentially lead to accessible design being included in the rebuild of places and spaces in Christchurch. In theory, the results of this research show that having an accessible environment leads to universal inclusiveness which in turn, leads to a resilient city. An overarching theme that arose during this research is that accessibility is a means to inclusion and without inclusion a society cannot be resilient. In practice, the results show that for Christchurch to become more accessible and inclusive for people with disabilities, there needs to not only be an increase the accessibility of places and spaces but accessibility to the community as well. Having accessible infrastructure and communities will lead to increased social and urban resilience, especially for individuals with disabilities. This research is beneficial because it helps to bridge the connection between accessibility and resilience. Resilience is important because it help cities prepare for, respond to and recover from disasters and this research helps to show that accessibility is an important part of creating resilience. Some questions still remain unresolved mainly looking into normalising accessibility and deciphering how to prove that accessibility is an issue that effects everybody, not just individuals with disabilities.

Research papers, University of Canterbury Library

Context of the project: On 4 September 2010, 22 February 2011, 13 June 2011 and 23 December 2011 Christchurch suffered major earthquakes and aftershocks (well over 10,000) that have left the central city in ruins and many of the eastern suburbs barely habitable even now. The earthquakes on 22 February caused catastrophic loss of life with 185 people killed. The toll this has taken on the residents of Christchurch has been considerable, not least of all for the significant psychological impact and disruption it has had on the children. As the process of rebuilding the city commenced, it became clear that the arts would play a key role in maintaining our quality of life during difficult times. For me, this started with the children and the most expressive of all the art forms – music.

Research papers, University of Canterbury Library

The increase of the world's population located near areas prone to natural disasters has given rise to new ‘mega risks’; the rebuild after disasters will test the governments’ capabilities to provide appropriate responses to protect the people and businesses. During the aftermath of the Christchurch earthquakes (2010-2012) that destroyed much of the inner city, the government of New Zealand set up a new partnership between the public and private sector to rebuild the city’s infrastructure. The new alliance, called SCIRT, used traditional risk management methods in the many construction projects. And, in hindsight, this was seen as one of the causes for some of the unanticipated problems. This study investigated the risk management practices in the post-disaster recovery to produce a specific risk management model that can be used effectively during future post-disaster situations. The aim was to develop a risk management guideline for more integrated risk management and fill the gap that arises when the traditional risk management framework is used in post-disaster situations. The study used the SCIRT alliance as a case study. The findings of the study are based on time and financial data from 100 rebuild projects, and from surveying and interviewing risk management professionals connected to the infrastructure recovery programme. The study focussed on post-disaster risk management in construction as a whole. It took into consideration the changes that happened to the people, the work and the environment due to the disaster. System thinking, and system dynamics techniques have been used due to the complexity of the recovery and to minimise the effect of unforeseen consequences. Based on an extensive literature review, the following methods were used to produce the model. The analytical hierarchical process and the relative importance index have been used to identify the critical risks inside the recovery project. System theory methods and quantitative graph theory have been used to investigate the dynamics of risks between the different management levels. Qualitative comparative analysis has been used to explore the critical success factors. And finally, causal loop diagrams combined with the grounded theory approach has been used to develop the model itself. The study identified that inexperienced staff, low management competency, poor communication, scope uncertainty, and non-alignment of the timing of strategic decisions with schedule demands, were the key risk factors in recovery projects. Among the critical risk groups, it was found that at a strategic management level, financial risks attracted the highest level of interest, as the client needs to secure funding. At both alliance-management and alliance-execution levels, the safety and environmental risks were given top priority due to a combination of high levels of emotional, reputational and media stresses. Risks arising from a lack of resources combined with the high volume of work and the concern that the cost could go out of control, alongside the aforementioned funding issues encouraged the client to create the recovery alliance model with large reputable construction organisations to lock in the recovery cost, at a time when the scope was still uncertain. This study found that building trust between all parties, clearer communication and a constant interactive flow of information, established a more working environment. Competent and clear allocation of risk management responsibilities, cultural shift, risk prioritisation, and staff training were crucial factors. Finally, the post-disaster risk management (PDRM) model can be described as an integrated risk management model that considers how the changes which happened to the environment, the people and their work, caused them to think differently to ease the complexity of the recovery projects. The model should be used as a guideline for recovery systems, especially after an earthquake, looking in detail at all the attributes and the concepts, which influence the risk management for more effective PDRM. The PDRM model is represented in Causal Loops Diagrams (CLD) in Figure 8.31 and based on 10 principles (Figure 8.32) and 26 concepts (Table 8.1) with its attributes.

Research papers, University of Canterbury Library

This participant-observation study explores the process of gathering and evaluating both financial and non-financial information and communication and transfer of that information within a medium-sized electrical service company in Christchurch, New Zealand. The previous literature has established the importance and the main characteristics of small and medium enterprises, mainly studying manufacturing companies. However, there has been little research done in New Zealand on the overall communication process and the financial and non-financial information usage in a small-medium enterprise. The Electrical Company has a flat structure which allows flexibility. The two owners understand the importance of financial management and use financial information extensively to ensure the business expenses are under control. The owners also gather and use non-financial information through talking to their accountant, their customers and people in the same industry and they keenly follow the news on the rebuilding of Christchurch after the recent earthquakes.