Search

found 28 results

Videos, UC QuakeStudies

A video about the reopening of C1 Espresso in the former post office on the corner of Tuam and High Streets. The café had to close after the 22 February 2011 earthquake, which severely damaged their building on High Street. The video includes footage of the staff setting up the cafe and an interview with owner Sam Crofskey.

Images, UC QuakeStudies

A photograph of the McKenzie & Willis Building on the corner of High and Tuam Streets. The right side of the building has collapsed and steel bracing is being used to hold up the rest. Large piles of rubble and shipping containers can be seen in front.

Images, UC QuakeStudies

A view down High Street from the corner of Colombo and Hereford Streets. In the distance, the Holiday Inn City Centre is being demolished. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The McKenzie and Willis building on High Street with damage to the top storey. The side wall has crumbled, exposing the inside of the building where the roof has been propped up by scaffolding. The front facade of the building is also damaged and is held upright by steel bracing.

Articles, UC QuakeStudies

A photograph captioned, "We get the young fellas to come in and do the upkeep on the government houses that have been sold. They cut down all the long grass and just tidy up all the fire risk sections. This one's easier cos the house is gone. If you keep it tidy it looks tidy from the road. There's people living here, and there's nothing worse than looking over your house and seeing grass this high".

Images, UC QuakeStudies

A photograph of the north side of the ChristChurch Cathedral in Cathedral Square. The front of the building has been propped up with steel bracing but further earthquakes have caused more damage, leaving a gap between the bracing and the wall. The tower has been partially demolished, but the lower section is still visible. Wire fencing has been placed around the entire building. In the background, a crane is rising high above the square.

Images, UC QuakeStudies

A photograph of the north side of the ChristChurch Cathedral in Cathedral Square. The front of the building has been propped up with steel bracing but further earthquakes have caused more damage, leaving a gap between the bracing and the wall. The tower has been partially demolished, but the lower section is still visible. Wire fencing has been placed around the entire building. In the background, a crane is rising high above the square.

Images, UC QuakeStudies

A photograph of the north side of the ChristChurch Cathedral in Cathedral Square. The front of the building has been propped up with steel bracing but further earthquakes have caused more damage, leaving a gap between the bracing and the wall. The tower has been partially demolished, but the lower section is still visible. Wire fencing has been placed around the entire building. In the background, a crane is rising high above the square.